A meeting of the Manatee County Port Authority will be held during a Board of County Commissioner’s meeting Tuesday, March 24, 2026, at 9:00 a.m., or as soon as is practicable, in the Patricia M. Glass Commission Chambers on the first floor of the County Administrative Center at 1112 Manatee Avenue West, Bradenton, Florida.
Any person requiring special accommodation at this meeting because of a disability or physical impairment should contact Pam Wingo 48 hours in advance of the meeting by telephone
(941) 721-2395 or by email at pwingo@seaportmanatee.com
March 24, 2026
9:00 a.m.
The Manatee County Port Authority may take action on any matter during this meeting, including those items set forth within this agenda. The chairperson, at the option of the chairperson, may take business out of order if the chairperson determines that such a change in the agenda’s schedule will expedite the business of the Port Authority.
Requests by Port Authority (items to be pulled from Consent Agenda)
According to Section 286.0105, Florida Statutes, any person desiring to appeal any decision made by the Port Authority with respect to any matter considered at this meeting will need a record of the proceedings, and for such purpose may need to ensure that a verbatim record of the proceedings is made, which includes the testimony and evidence upon which the appeal is to be based.
Mike Rahn, Chairman; Jason Bearden, 1st Vice Chairman; George Kruse, 2nd Vice-Chairman;
Vacant, 3rd Vice Chairman; Amanda Ballard, Member; Dr. Bob McCann, Member; Tal Saddique, Member
Move to approve the Consent Agenda incorporating the language as stated in the recommended motions on the cover sheets for the Consent Agenda items.
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
JP | XXXXXXX | V035604 | 10623016 CANADA INC | 8,096.00 |
AP | XXXXXXX | V019302 | ABBOTT, PAUL SCOTT | 2,025.00 |
AP | XXXXXXX | V019302 | ABBOTT, PAUL SCOTT | 1,668.75 |
AP | XXXXXXX | V031902 | ACCURATE ELECTRONICS INC | 2,333.04 |
AP | XXXXXXX | V016081 | AECOM TECHNICAL SERVICES INC | 950.00 |
AP | XXXXXXX | V035566 | AGUNSA MANATEE TERMINAL LLC | 2,398.73 |
AP | XXXXXXX | V026116 | ALL FOR LIFE | 50.00 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 5,642.01 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 8,659.93 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 993.92 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 3,035.48 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 1,640.41 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 5,866.05 |
AP | XXXXXXX | V023321 | AMERICAN EXPRESS TRAVEL RELATE | 135.61 |
AP | XXXXXXX | V023321 | AMERICAN EXPRESS TRAVEL RELATE | 53.14 |
AP | XXXXXXX | V004322 | AMERICAN JOURNAL OF TRANSPORTA | 1,500.00 |
AP | XXXXXXX | V002036 | ANCHOR HOUSE | 2,500.00 |
AP | XXXXXXX | V113719 | APEX OFFICE PRODUCTS INC | 321.12 |
AP | XXXXXXX | V118009 | AT AND T | 80.74 |
JP | XXXXXXX | V118009 | AT AND T | 80.74 |
AP | XXXXXXX | V013140 | AT AND T MOBILITY | 111.48 |
AP | XXXXXXX | V118989 | AUTO PARTS INC | 284.55 |
WT XXXXXXX | V019189 | BANK OF AMERICA | 11,888.85 | |
AP XXXXXXX | V002730 | BANK OF AMERICA | 1,262.80 | |
AP XXXXXXX | V002730 | BANK OF AMERICA | 1,274.39 | |
WT XXXXXXX | V032709 | BDI MARINE CONTRACTORS LLC | 82,840.38 | |
AP | XXXXXXX | V153506 | BILLS DISCOUNT CENTER | 525.00 |
AP | XXXXXXX | V019416 | BIO TECH CONSULTING INC | 20,257.77 |
JP | XXXXXXX | V162113 | BOBS CARPET MART | 1,029.50 |
AP | XXXXXXX | V027297 | BOULEVARD TIRE CENTER | 3,584.08 |
AP | XXXXXXX | V170611 | BOYD INSURANCE AGENCY INC | 42,391.75 |
AP | XXXXXXX | V009839 | BRYANT MILLER AND OLIVE PA | 8,528.33 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 605.00 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 190.00 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 1,129.96 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 130.00 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 615.00 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 193.88 |
AP | XXXXXXX | V034196 | CORCORAN PARTNERS | 50,000.00 |
AP | XXXXXXX | V027465 | CRISDEL GROUP INC | 64,653.96 |
AP | XXXXXXX | V031972 | DADE SERVICE CORPORATION | 3,313.83 |
AP | XXXXXXX | V031972 | DADE SERVICE CORPORATION | 241,279.44 |
JP | XXXXXXX | V031972 | DADE SERVICE CORPORATION | 330,725.44 |
AP | XXXXXXX | V006291 | DEX IMAGING INC | 130.98 |
AP | XXXXXXX | V006291 | DEX IMAGING INC | 206.92 |
AP | XXXXXXX | V006291 | DEX IMAGING INC | 771.00 |
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
AP XXXXXXX | V282890 | DISCOUNT LOCK AND KEY INC | 1,307.00 | |
AP XXXXXXX | V282890 | DISCOUNT LOCK AND KEY INC | 477.00 | |
WT XXXXXXX | V334600 | DIVISION OF RETIREMENT, FLORID | 21.15 | |
AP | XXXXXXX | V025612 | DYNAFIRE INC | 14,972.09 |
AP | XXXXXXX | V025612 | DYNAFIRE INC | 1,777.24 |
AP | XXXXXXX | V301367 | EASTERN METAL SUPPLY | 3,054.19 |
AP | XXXXXXX | V035551 | EDCO AWARDS AND SPECIALTIES | 198.68 |
AP | XXXXXXX | V022096 | ENTECH | 25,613.80 |
AP | XXXXXXX | V022096 | ENTECH | 8,546.60 |
AP | XXXXXXX | V022096 | ENTECH | 24,416.70 |
AP | XXXXXXX | V022096 | ENTECH | 16,965.40 |
AP | XXXXXXX | V024683 | EVERGLADES EQUIPMENT GROUP | 4,306.00 |
AP | XXXXXXX | V320642 | FAIRBANKS SCALES | 1,956.54 |
AP | XXXXXXX | V323190 | FASTENAL COMPANY | 95.86 |
AP | XXXXXXX | V323190 | FASTENAL COMPANY | 26.72 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 183.82 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 5,067.67 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 167.62 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 938.52 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 4,882.33 |
AP | XXXXXXX | V334119 | FLORIDA PORTS FINANCING COMMIS | 984.00 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 48,232.15 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 3,900.28 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 33,111.54 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 3,678.41 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 33,738.11 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 4,477.62 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 92.17 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 6,126.21 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 29,157.42 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 3,126.58 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 92.29 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 3,036.78 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 184.58 |
AP | XXXXXXX | V035488 | GATORCOMS | 1,720.00 |
AP | XXXXXXX | V035091 | GAZAWAY BOAT DETAILING LLC | 400.00 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 484.90 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 929.54 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 795.13 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 437.54 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 131.18 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 123.38 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 129.90 |
AP | XXXXXXX | V380790 | GOODYEAR RUBBER PRODUCTS INC | 200.46 |
AP | XXXXXXX | V380790 | GOODYEAR RUBBER PRODUCTS INC | 464.46 |
AP | XXXXXXX | V385628 | GRAINGER INC, W W | 545.29 |
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
AP | XXXXXXX | V385628 | GRAINGER INC, W W | 4,267.97 |
AP | XXXXXXX | V385628 | GRAINGER INC, W W | 1,090.97 |
AP | XXXXXXX | V385628 | GRAINGER INC, W W | 361.87 |
AP | XXXXXXX | V009540 | GRAPEVINE COMMUNICATIONS INTER | 3,300.00 |
AP | XXXXXXX | V387610 | GRAVELY OF BRADENTON | 484.10 |
AP | XXXXXXX | V007986 | GREATER TAMPA BAY MARINE ADVIS | 4,166.66 |
AP | XXXXXXX | V034855 | GUIDEHOUSE INC | 40,503.28 |
AP | XXXXXXX | V022318 | HERC RENTALS INC | 1,412.00 |
AP | XXXXXXX | V018000 | HERNANDO,ELENA GARCIA | 707.04 |
AP | XXXXXXX | V006974 | HIMES ELECTRIC COMPANY INC | 99,060.00 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 803.39 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 1,171.86 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 517.22 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 4,422.52 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 726.14 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 844.70 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 931.01 |
AP | XXXXXXX | V030525 | HORIZON DISTRIBUTORS INC | 222.62 |
AP | XXXXXXX | V030525 | HORIZON DISTRIBUTORS INC | 2,165.79 |
AP | XXXXXXX | P000431 | HUTCHESON, NICHOLAS | 130.00 |
AP | XXXXXXX | V034846 | IFM EFECTOR INC | 2,532.31 |
AP | XXXXXXX | P000094 | ISIMINGER, GEORGE | 825.10 |
AP | XXXXXXX | V032941 | JOHNSTONE SUPPLY | 130,442.51 |
AP | XXXXXXX | V032941 | JOHNSTONE SUPPLY | 4,211.93 |
AP | XXXXXXX | V032941 | JOHNSTONE SUPPLY | 990.56 |
AP | XXXXXXX | V029389 | JOHNSTONE SUPPLY | 1,317.43 |
AP | XXXXXXX | P000253 | JONES, BRENDA L | 63.29 |
AP | XXXXXXX | V035063 | KALMAR PTE LTD | 64,900.00 |
AP | XXXXXXX | V034929 | KALMAR USA INC | 4,415.22 |
AP | XXXXXXX | V034929 | KALMAR USA INC | 1,843.96 |
AP | XXXXXXX | V520115 | KIMBALL MIDWEST | 352.63 |
AP | XXXXXXX | V520115 | KIMBALL MIDWEST | 303.07 |
AP | XXXXXXX | V017574 | KONECRANES INC | 3,059.32 |
AP | XXXXXXX | V017574 | KONECRANES INC | 26,033.74 |
AP | XXXXXXX | V017574 | KONECRANES INC | 31,256.31 |
AP | XXXXXXX | V017574 | KONECRANES INC | 77,080.64 |
AP | XXXXXXX | V032245 | LIMBLE SOLUTIONS INC | 9,745.56 |
AP | XXXXXXX | V022184 | LOUIS PRYOR SUPPLY INC | 97.63 |
AP | XXXXXXX | V022184 | LOUIS PRYOR SUPPLY INC | 989.04 |
AP | XXXXXXX | V004489 | LOWES HOME CENTER INC | 550.99 |
AP | XXXXXXX | V004489 | LOWES HOME CENTER INC | 317.27 |
AP | XXXXXXX | V024291 | MACKAY COMMUNICATIONS INC | 422.58 |
AP | XXXXXXX | V625403 | MAINTENANCE TOO PAPER CO INC | 867.60 |
AP | XXXXXXX | V625403 | MAINTENANCE TOO PAPER CO INC | 267.30 |
AP | XXXXXXX | V625403 | MAINTENANCE TOO PAPER CO INC | 1,149.81 |
AP | XXXXXXX | V625403 | MAINTENANCE TOO PAPER CO INC | 99.24 |
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
AP | XXXXXXX | V627027 | MANATEE CHAMBER OF COMMERCE | 350.00 |
AP | XXXXXXX | V627027 | MANATEE CHAMBER OF COMMERCE | 10,000.00 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 111.00 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 3,562.57 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 231.30 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 11,977.05 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 7,093.31 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 7,765.29 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 102.82 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 484.80 |
AP | XXXXXXX | V000259 | MANATEE SPORTS UNLIMITED | 184.75 |
AP | XXXXXXX | V000259 | MANATEE SPORTS UNLIMITED | 330.45 |
AP | XXXXXXX | V005619 | MARTINEZ AND COMPANY INC | 10,007.43 |
AP | XXXXXXX | V005619 | MARTINEZ AND COMPANY INC | 4,834.75 |
AP | XXXXXXX | V005619 | MARTINEZ AND COMPANY INC | 9,179.83 |
AP | XXXXXXX | V005619 | MARTINEZ AND COMPANY INC | 10,166.06 |
AP | XXXXXXX | V005619 | MARTINEZ AND COMPANY INC | 5,862.56 |
AP | XXXXXXX | P000400 | MARTINEZ, MARY CHRISTINA | 100.19 |
AP | XXXXXXX | V028973 | MCGRIFF INSURANCE SERVICES INC | 75,656.24 |
AP | XXXXXXX | V022877 | MCGUIRE ELECTRIC INC | 4,670.00 |
AP | XXXXXXX | V030657 | MUCK RACK LLC | 5,000.00 |
AP | XXXXXXX | V035088 | NATIONAL CRANE SERVICES INC | 4,175.00 |
AP | XXXXXXX | V028335 | NATIONAL STORMWATER TRUST INC | 354,000.00 |
AP | XXXXXXX | V028053 | ORKIN LLC | 1,521.73 |
AP | XXXXXXX | V028053 | ORKIN LLC | 1,454.73 |
AP | XXXXXXX | V028053 | ORKIN LLC | 1,354.55 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 831.30 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 931.72 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 2,716.08 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 2,539.30 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 3,910.46 |
JP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 962.19 |
AP | XXXXXXX | V029578 | PALMETTO ACE HARDWARE | 229.99 |
AP | XXXXXXX | V029578 | PALMETTO ACE HARDWARE | 114.58 |
AP | XXXXXXX | V712851 | PALMETTO YOUTH CENTER | 1,000.00 |
AP | XXXXXXX | V026028 | PARATEC DOOR SOLUTIONS INC | 1,625.00 |
AP | XXXXXXX | V736427 | PITNEY BOWES CREDIT CORP | 179.67 |
AP | XXXXXXX | V020481 | POPIS CATERING | 7,434.00 |
AP | XXXXXXX | V028846 | PORT OF PORT MANATEE PROPELLER | 2,400.00 |
AP | XXXXXXX | V022437 | PREFERRED GOVERNMENTAL INSURAN | 28,233.75 |
JP | XXXXXXX | V035474 | PREMIER CORROSION PROTECTION S | 49,500.00 |
AP | XXXXXXX | V018591 | PRO MARINE INC | 145.84 |
AP | XXXXXXX | V018591 | PRO MARINE INC | 46.88 |
AP | XXXXXXX | V018591 | PRO MARINE INC | 414.13 |
AP | XXXXXXX | V003108 | PROCESSED COMPRESSORS | 1,875.00 |
AP | XXXXXXX | V003108 | PROCESSED COMPRESSORS | 4,900.00 |
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
AP | XXXXXXX | V748180 | PUBLIX SUPER MARKET | 411.59 |
AP | XXXXXXX | V027409 | RAMBA LAW GROUP LLC | 7,680.00 |
AP | XXXXXXX | V027409 | RAMBA LAW GROUP LLC | 7,500.00 |
JP | XXXXXXX | V027409 | RAMBA LAW GROUP LLC | 7,500.00 |
AP | XXXXXXX | V776386 | RING POWER CORP | 3,245.57 |
AP | XXXXXXX | V034117 | SALUS HOLDINGS LLC | 286.11 |
AP | XXXXXXX | V014349 | SHI INTERNATIONAL CORP | 5,419.64 |
AP | XXXXXXX | V015633 | SIEMENS INDUSTRY INC | 49,997.28 |
AP | XXXXXXX | P000470 | SLATER, JOSEPH | 206.00 |
AP | XXXXXXX | V028926 | SOLITUDE LAKE MANAGEMENT LLC | 600.00 |
AP | XXXXXXX | V031937 | SOUTHWEST FLORIDA MECHANICAL L | 4,880.00 |
AP | XXXXXXX | V031937 | SOUTHWEST FLORIDA MECHANICAL L | 30,678.00 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 2,960.00 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 140,368.35 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 3,560.00 |
WT XXXXXXX | V874841 | STATE OF FLA DEPT OF REVENUE | 3,733.05 | |
WT XXXXXXX | V874841 | STATE OF FLA DEPT OF REVENUE | 0.00 | |
AP | XXXXXXX | V875019 | STATE OF FLORIDA | 722.88 |
AP | XXXXXXX | V875019 | STATE OF FLORIDA | 723.29 |
AP | XXXXXXX | V028838 | STEELSMITH, LLC | 600.00 |
AP | XXXXXXX | V028838 | STEELSMITH, LLC | 1,200.00 |
AP | XXXXXXX | V028838 | STEELSMITH, LLC | 600.00 |
AP | XXXXXXX | V022191 | STEWART AND STEVENSON FDDA LLC | 3,248.00 |
AP | XXXXXXX | V023659 | SYNERGY NDS INC | 2,160.00 |
AP | XXXXXXX | V021876 | SYSCO WEST COAST FLORIDA | 4,380.70 |
AP | XXXXXXX | V906395 | TERRY SUPPLY COMPANY | 91.98 |
AP | XXXXXXX | V906395 | TERRY SUPPLY COMPANY | 113.55 |
AP | XXXXXXX | V906395 | TERRY SUPPLY COMPANY | 749.19 |
AP | XXXXXXX | V029987 | TETRA TECH INC | 64,038.75 |
AP | XXXXXXX | V029987 | TETRA TECH INC | 3,308.50 |
AP | XXXXXXX | V028145 | THE MCCLATCHY COMPANY LLC | 365.00 |
AP | XXXXXXX | V031555 | TIDALIS AMERICAS LTD | 9,184.17 |
JP | XXXXXXX | V031555 | TIDALIS AMERICAS LTD | 9,184.17 |
AP | XXXXXXX | V028789 | TSW AUTOMATION INC | 14,225.50 |
AP | XXXXXXX | V006222 | ULINE INC | 1,866.38 |
AP | XXXXXXX | V006222 | ULINE INC | 204.80 |
AP | XXXXXXX | V006222 | ULINE INC | 553.05 |
AP | XXXXXXX | V004240 | UNIFIRST CORPORATION | 565.86 |
AP | XXXXXXX | V004240 | UNIFIRST CORPORATION | 1,131.72 |
AP | XXXXXXX | V004240 | UNIFIRST CORPORATION | 1,183.69 |
JP | XXXXXXX | V025033 | UNITED CAPITAL FUNDING GROUP L | 2,305.80 |
AP | XXXXXXX | V006904 | UNITED REFRIGERATION INC | 12,074.36 |
AP | XXXXXXX | V003712 | UNITED RENTALS NORTH AMERICA I | 1,051.48 |
AP | XXXXXXX | V003712 | UNITED RENTALS NORTH AMERICA I | 9,363.00 |
AP | XXXXXXX | V003712 | UNITED RENTALS NORTH AMERICA I | 1,577.22 |
AP | XXXXXXX | V006819 | US TENT RENTAL INC | 2,122.72 |
Manatee County Port Authority Warrant (Check) Listing
01/16/2026 to 03/12/2026
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 37.45 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 804.47 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 497.79 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 354.81 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 37.45 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 337.05 | |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 74.90 | |
AP | XXXXXXX | V019226 | WALKER ACOUSTICAL LLC, R J | 3,490.00 | |
AP | XXXXXXX | V014316 | WASTE PRO OF FLORIDA INC | 25.75 | |
AP | XXXXXXX | V014316 | WASTE PRO OF FLORIDA INC | 25.75 | |
AP | XXXXXXX | V021915 | WEBTIVITY MARKETING AND DESIGN | 80.00 | |
AP | XXXXXXX | V021915 | WEBTIVITY MARKETING AND DESIGN | 442.00 | |
AP | XXXXXXX | V002215 | WILLIAMS SCOTSMAN INC | 29,335.54 | |
AP | XXXXXXX | V034685 | WORKSPACE TECHNOLOGY INC | 516,179.59 | |
AP | XXXXXXX | V028913 | WORLD DIRECT SHIPPING LLC | 3,600.00 | |
AP | XXXXXXX | V028913 | WORLD DIRECT SHIPPING LLC | 7,282.52 | |
AP | XXXXXXX | V012252 | WORLD ELECTRIC SUPPLY INC | 4,599.98 | |
AP | XXXXXXX | V012252 | WORLD ELECTRIC SUPPLY INC | 4,709.90 | |
AP | XXXXXXX | P000292 | ZIMMERMANN,VIRGINIA | 71.00 | |
AP | XXXXXXX | P000292 | ZIMMERMANN,VIRGINIA | 119.99 | |
AP | XXXXXXX | P000292 | ZIMMERMANN,VIRGINIA | 119.99 | |
Total warrants (checks) for period reported | 3,368,967.57 |
MANATEE COUNTY PORT AUTHORITY REGULAR MEETING
COUNTY ADMINISTRATION CENTER, HONORABLE PATRICIA M. GLASS CHAMBERS
1112 Manatee Avenue West Bradenton, Florida January 27, 2026
https://www.youtube.com/channel/UC4KFtzaC9Z87D5mn_SKKtBA
Present were:
Mike Rahn, Chairman
Carol Ann Felts, First Vice-Chairman Jason Bearden, Second Vice-Chairman George W. Kruse, Third Vice-Chairman Amanda Ballard
Dr. Bob McCann Tal Siddique
Also present were:
Carlos Buqueras, Executive Director Jennifer R. Cowan, Port Authority Attorney
Denise Hege, Accounting, Clerk of the Circuit Court Robin Toth, Deputy Clerk, Clerk of the Circuit Court
CALL TO ORDER
Chairman Rahn called the meeting to order at 9:05 a.m.
STATEMENT ON PROPOSED PRIVATE CRUISE TERMINAL
Chairman Rahn elucidated that much misinformation was recently published in the newspaper regarding Seaport Manatee’s interaction with a proposed, private cruise terminal near Rattlesnake Key. SeaPort Manatee has nothing to do with a private entity wanting to build any type of cruise terminal in Manatee County. SeaPort Manatee operates within its own boundaries and does not operate outside of those boundaries.
Furthermore, SeaPort Manatee has not engaged, has not spoken with, has not met with, and has not had any type of conversation or discussion with the entity that wants to build a private cruise terminal in Manatee County.
The Port Authority has some of the same concerns as the citizens of Manatee County, and those concerns go beyond the operation of SeaPort Manatee i.e., seaborne operations, dredging, stevedores, shared harbor pilots with Port of Tampa, and most importantly environmental concerns and what this would do to Tampa Bay.
The misinformation was unnecessary. SeaPort Manatee continues to appreciate its customer base that drives SeaPort Manatee income. Chairman Rahn stated the County is not engaging in any interaction with the entity regarding a cruise terminal.
AGENDA PA20260127DOC001
PUBLIC COMMENTS (All Agenda and non-Agenda Items)
Glen Gibellina stated he is still waiting for a response on the status of the $500,000, non-refundable deposit (1/28/25) related to termination of Agreement with Fortress 2020 Lando LLC, for acquisition of real property near SeaPort Manatee.
Mr. Gibellina also attended 2026 Lobby Days in Tallahassee and documented
January 27, 2026 (Continued)
communications. He commented on pending legislation sponsored by Representative William Conerly regarding a new, proposed cruise terminal in Manatee County, and Member Siddique changing his position on the bill based on interpretation to move forward. Under tainted circumstances, Mr. Gibellina requested the bill be pulled, but it was not pulled.
Andra Griffin stated she also attended 2026 Lobby Days with Mr. Gibellina and took notes about Member Siddique changing his vote on the bill sponsored by Representative Conerly. Citizens will continue to keep County Officials accountable.
By telephone, Anthony Scuillo voiced concern in looking at the subject parcel eyed for a potential cruise terminal adjacent to Port Manatee. Several comments made in social media platforms are incorrect, but the contiguous nature raises concern.
There being no further public comments, Chairman Rahn closed public comments.
Discussion ensued regarding clarification that the location of the parcel is not near SeaPort Manatee, private property owners, the Skyway Bridge and Southwest Florida Water Management District (SWFWMD) land are involved, there is no contiguous factor where the Port can take this over and utilize its authority, Sunshine Law does not apply between different bodies, this is a local bill at the Tallahassee level, opinions were asked and those opinions did not determine whether that bill was going to be filed, Member Siddique has every right to express his opinion on anything in Tallahassee as every other citizen, his opinion had no influence, Representative Conerly did not write this bill but offered to run the bill to assume additional workload from Representative Owen, Manatee County is represented by three State representatives in the Florida House of Representatives, who serve on the Manatee County Legislative Delegation, and Representative Conerly does not represent the land for Slip Knot LLC (co-owner of Knott-Cowen Tract).
Member Kruse clarified there are many owners, including SWFWMD, between the Skyway Bridge and the subject parcel. County Commissioners were asked their opinion, not giving an opportunity to formally vote, to determine whether or not the bill was going to be filed. Commissioner Siddique’s vote did not influence that decision. This is a local bill at a Tallahassee level, and this bill was not advocated by Representative Connolly.
Member Siddique spoke about separate, unrelated efforts, and it might be best to refer the public to the applicant.
Commissioner Felts stated citizens need to be educated on how government works. She expressed appreciation to Chairman Rahn for addressing this issue.
There being no further public comments, Chairman Rahn closed public comments.
PA20260127DOC002
No items were pulled from the Consent Agenda.
CONSENT AGENDA PA20260127DOC003
Carlos Buqueras, Executive Director, noted a scrivener error to Consent Agenda Item 3.C., Budget Resolution PA-26-07, to change Batch ID Numbers on Pages 2 and 3. There
January 27, 2026 (Continued)
are no monetary changes. The correct version of PA-26-07 was provided to the Clerk.
A motion was made by Member Siddique, seconded by Member Ballard, and carried 7 to 0, to approve the Consent Agenda, incorporating the language as stated in the recommended motions on the cover sheets for the Consent Agenda.
Accepted Warrant Listing from December 10, 2025, to January 15, 2026
PA20260127DOC004
Approved the Minutes of December 18, 2025
Adopted Budget Resolution PA-26-07, budgeting the following:
$288,970 of Port cash for the purchase and installation of ten, chiller doors for Warehouse 6;
2025 Port Security Grant Program (PSGP) is funded $359,250 (75 percent of project costs), by Homeland Security, and $119,750 of Port cash (25 percent of project costs), for a Cyber Offsite Backup, Cyber Information Management Sustainment for the Port control billing system, Cyber Management Training, and a Mass Notification System that is web based, which sends, emails, text and telephone alerts in the event of a natural disaster, or other emergencies; and
$80,000 of Port cash for the replacement of fire sprinklers for Warehouse 8
PA20260127DOC005
FIRST AMENDMENT TO OPERATING AND MAINTENANCE AGREEMENT – PORT MANATEE RAILROAD LLC
Approved and authorized Chairman to execute First Amendment to Operating and Maintenance Agreement (10/21/21) between Port Manatee Railroad LLC, and Manatee County Port Authority, specifying that revenue generated from intermodal traffic associated with the new track is excluded from the gross revenue subject to percentage payments to the Port (with attached Exhibit A – Amended Description of Rail Facilities Map, and Exhibit B – Amended Operating Fees), effective December 1, 2025 PA20260127DOC006
Approved and authorized Chairman to execute First Amendment to SeaPort Manatee and World Direct Shipping LLC (WDS), Lease Agreement (10/17/24) between World Direct Shipping LLC, and Manatee County Port Authority, contingent upon the approval of the First Amendment to Port Manatee Railroad LLC, Agreement, amending, modifying, and superseding Paragraphs 2 (Demised Premises), 4 (Term), 5 (Rent), 6 (Lessee Improvements), 7 (Authority-Funded Rail Improvements), and Exhibit A (Demised Premises) PA20260127DOC007
FLORIDA DIVISION OF EMERGENCY MANANAGEMENT MITIGATION - GENERATORS
Approved and authorized Chairman to execute Authorizing Agent Approval Form, Hazard Mitigation Grant Program Sub-Recipient Management Cost Request Form, and Assurances – Construction Programs Form, for submission to the grant review process, for the purchase of permanent and portable, back-up generators – Phase 1 and Phase 2 (total project cost for six generators $6,000,000: Grant funding
$4,500,000; Port Match $1,500,000) PA20260127DOC008
January 27, 2026 (Continued)
Accepted into the record executed Agreement EMW-2025-PU-05421 (Award Letter, effective 11/19/25) from FEMA Department of Homeland Security, for cyber security enhancements and mass notification system, in the amount of $359,250 in Federal funding (75 percent of total project cost), and $119,750 of Port cash (25 percent of project cost), for a total project cost of $479,000 PA20260127DOC009
(End Consent Agenda)
Carlos Buqueras, Executive Director, had no comments.
There were no Member comments.
There being no further business, Chairman Rahn adjourned the meeting at 9:24 a.m. Minutes Approved:
This resolution budgets the following:
$10,375,000 in PIDP funds from the U.S. DOT MARAD grant program and $654,706 in Port cash. The project supports planning, permitting, and engineering design for the full reconstruction of Berths 6, 7, 8, 10, and 11. The funding also provides for the design of toe walls (or comparable structures) at Berths 4, 5, 9, 12, and 14 to accommodate future deepening activities.
$13,000 in Port cash for repairs to the roof ridge cap on Warehouse 2 and the replacement of damaged dome covers protecting the security cameras. The repairs address damage sustained during Hurricane Milton.
$107,017 in Port cash will provide additional funding for the Warehouse 8 pallet rack system, including required changes to rail elevations and the installation of a fire suppression system.
Budget Resolution PA-26-08
Budgets are $10,375,000 MARAD 2024 PIDP and $774,723 Port cash.
Delay in budget allocations.
Move to adopt Budget Resolution PA-26-08.
RESOLUTION PA-26-08 AMENDING THE ANNUAL BUDGET
FOR MANATEE COUNTY PORT AUTHORITY FOR FISCAL YEAR 2025-2026
Appropriations for expenditures in any fund may be decreased and other appropriations in the same fund correspondingly increased, provided the total appropriations of the fund are not changed.
Appropriations from reserves may be made to increase the appropriation for any particular expense in the same fund, or to create an appropriation in the fund for any lawful purpose.
Unanticipated revenues, including increased receipts for enterprise or propriety funds, may be appropriated for their intended purpose, and may be transferred between funds to properly account for the unanticipated revenue.
Item No. | Batch ID No. | Reference No. |
1 | BAAL032426A/B | BU26000341 |
2 | BAAL032426A | BU26000340 |
3 | BAAL032426A | BU26000342 |
ADOPTED with a quorum present and voting this on the 24th day of March 2026.
ATTEST: ANGELINA M. COLONNESO MANATEE COUNTY PORT AUTHORITY
CLERK OF CIRCUIT COURT
By:
Fund: MARAD 2024 PIDP
Port Cash
Section: Berth Planning
Description: Budgets a total of $11,029,706 for berth planning, permitting, and design work for berths 6,7,8,10, and 11. This also includes design for toes walls (or similar structures) at berths 4, 5, 9, 12, and 14.
Batch ID: BAAL032426A/B Reference: BU26000341
Fund: Port Cash Section: Hurricane Milton
Description: Budgets $13,000 of Port cash to cover repairs to the roof on warehouse 2 and to replace dome covers that protect the security cameras due to damage caused by Hurricane Milton.
Batch ID: BAAL032426A Reference: BU26000340
Fund: Port Capital Improvement Section: Warehouse 8 Pallet Rack System
Description: An additional $107,017 is budgeted for a rail elevation change and fire suppression system to warehouse 8.
Batch ID: BAAL032426A Reference: BU26000342
Several old, obsolete assets that are no longer in use and are uneconomical to upgrade or repair are considered surplus and should be removed from the Manatee County Port Authority Fixed Assets Listing. The surplus assets will be offered for public bid, auctioned, destroyed, and/or E-scrapped.
Asset Deletion – March 24, 2026
N/A.
Delay in updating property records.
Remove assets as listed on the attached Asset Deletion – March 24, 2026, from the Fixed Assets Listing.
Asset Deletion - March 24, 2026
Asset # | Description | Serial/VIN# | Date Purchased | Cost | Value | Status |
56673 | FLUIDMESH, FM3100M | 3100201152 | 1/31/2013 | $ 1,502.37 | $ - | Obsolete |
55481 | 42" LCD DISPLAY, LG | 10RMQK23172 | 09/27/11 | $ 5,737.24 | $ - | Obsolete |
58231 | AVAYA G430 MEDIA GATEWAY | 13TG51286736 | 06/17/14 | $ 7,835.18 | $ - | Obsolete |
58235 | SWITCH, AVAYA 3524GT | 14JP052F60EE | 6/17/2014 | $ 1,675.42 | $ - | Obsolete |
58237 | SWITCH, AVAYA 3524GT | 14JP052F600W | 6/17/2014 | $ 1,675.42 | $ - | Obsolete |
58239 | SWITCH, AVAYA 3524GT | 14JP052F6029 | 6/17/2014 | $ 1,675.42 | $ - | Obsolete |
58240 | SWITCH, AVAYA 3524GT | 14JP052F60JK | 6/17/2014 | $ 1,675.42 | $ - | Obsolete |
58577 | CAMERA, AXIS Q6044 PTZ | 00408CFA87BC | 9/16/2014 | $ 3,500.51 | $ - | Obsolete |
58597 | CAMERA, AXIS Q1922 THERMAL | ACC8E0C99D6 | 9/30/2014 | $ 7,400.01 | $ - | Obsolete |
58680 | AVAYA B189 IP CONFERENCE PHONE | 14N523418659 | 9/30/2014 | $ 1,169.10 | $ - | Obsolete |
61060 | DELL POWEREDGE R430 SERVER | 99SPMD2 | 02/14/2017 | $ 6,496.39 | $ - | Obsolete |
Port Manatee Tariff No. 3, Item 445 has been revised to include crane technician labor rates for services provided by Port staff.
Port Manatee Tariff No. 3 Item 445
N/A.
N/A
Move to approve the revised wording to Port Manatee Tariff No. 3, Item 445, to include crane technician labor rates provided by the Port.
PORT MANATEE TARIFF NO. 3 | 39th Revision Page 32 Canc. 38th Revision Page 32 | ||
SECTION FOUR | RATES AND CHARGES | ||
ITEM | SUBJECT | APPLICATION | |
445 ▲ | Rates for Labor Furnished by the Port | STRAIGHT TIME OVERTIME | |
Clerk $48.85 hr. $73.26 hr | |||
Crane Tech $180.00 hr. $270.00 hr. | |||
Labor $48.85 hr. $73.26 hr. | |||
Operators, Machine $54.34 hr. $81.51 hr. | |||
Scale Operator $60.29 hr. $90.44 hr. | |||
Security $41.20 hr. $61.79 hr. | |||
Supervisor $70.31 hr. $105.47 hr. | |||
Warehouse Man $48.85 hr. $73.26 hr. | |||
Drone & Photography Srvcs….$125.00 hr during business hours/differential rate during non-business hours $175.00 hr./$500.00 raw footage. Charges for planning and project development services will be charged $400.00 per hour after the first 20 hours of services. Charges for Port personnel not listed above will consist of the actual hourly rates (whether regular time or overtime) plus 60%. Any materials necessary to perform such services will be charged for on the basis of actual cost plus twenty-five percent (25%) for purchasing and handling. When personnel are called out in overtime specially to perform services as mentioned above, services performed will be subject to a minimum labor charge of four (4) hours for the personnel performing such services. | |||
Short Notice Call Outs: In cases where personnel are called out with less than 24-hour advanced notice, the overtime rate will be charged regardless of the time of day. Port Holidays Billing Provision: Charges for services performed on port holidays will be billed at the holiday rate as specified in the existing rate schedule. | |||
451 | Facility Use Fees | For the period of U.S. Customs’ 72-hour vehicle processing, the following provisions apply: From the date of vessel departure of the loaded vehicles, a five (5) consecutive days’ grace period will be provided for the removal of vehicles which were not loaded aboard the vessel. After the grace period, a charge of $ 8.94 per day per vehicle will be imposed. | |
Issued: 03/24/26 | Effective: 03/24/26 | ||
▲ Change in Wording | Issued by: Manatee County Port Authority | ||
The U.S. Department of Transportation (USDOT) has awarded the Authority a $10,375,000 planning grant to support engineering and permitting for the berth reconstruction program. The project includes completing NEPA reviews, securing required permits, and advancing engineering design for Berths 6, 7, 8, 10, and 11. It also provides for the design of toe walls at Berths 4, 5, 9, 12, and 14 to accommodate future port-wide deepening efforts. The required local match is $2,618,824.
U.S. Department of Transportation Maritime Administration Grant Agreement
$10,375,000 Federal; $2,618,824 Non-Federal
Delay in execution of the grant and potential deallocation of federal funds.
Move to approve and authorize the Chairman to execute the U.S. Department of Transportation Maritime Administration Grant Agreement for berth reconstruction engineering and permitting.
MARAD FY 2024 PIDP Grant No. 693JF72540027 702434PIDG 2026 1BR2540027 0000150000 41010 61006600 — $10,375,000
This agreement is between the United States Department of Transportation Maritime
Administration (“MARAD”) and the Manatee County Port Authority (the “Recipient”).
This agreement reflects the selection of the Recipient to receive a PIDP Grant for the Berth Reconstruction Engineering and Permitting Project.
The parties therefore agree to the following:
In this agreement, “General Terms and Conditions” means the content of the document titled “General Terms and Conditions Under the Fiscal Year 2024 Port Infrastructure Development Program Grants,” dated November 21, 2025, which is available at https://www.maritime.dot.gov/grants/federal-grant-assistance/federal-grant-assistance. The General Terms and Conditions reference the information contained in the schedules to this agreement. The General Terms and Conditions are part of this agreement.
The Recipient states that it has knowledge of and agrees to the General Terms and Conditions.
The Recipient acknowledges that the General Terms and Conditions impose obligations on the Recipient and that the Recipient’s non-compliance with the General Terms and Conditions may result in remedial action, terminating of the PIDP Grant, disallowing costs incurred for the Project, requiring the Recipient to refund to MARAD the PIDP Grant, and reporting the non-compliance in the Federal-government-wide integrity and performance system.
The scope of work for this planning Project includes ground-disturbing work such as geotechnical investigations. The Recipient will request MARAD approval prior to executing any potentially ground-disturbing field studies or investigations.
Application Title: Seaport Manatee - Planning Grant - Berth Reconstruction Engineering and Permitting.
Application Date: May 10, 2024
Recipient’s Unique Entity Identifier: KLBXGVB8Q2L3
Abby Lindecamp
Deputy Director of Business Administration and Finance Manatee County Port Authority
300 Tampa Bay Way, Suite 1
Palmetto, FL 34221
Office: (941) 721-2324
and
Denise C. Stufflebeam
Senior Director of Business Administration & Finance Manatee County Port Authority
300 Tampa Bay Way, Suite 1
Palmetto, FL 34221
Direct: (941) 722-6621 x 339
None.
Kelly Mitchell-Carroll
Grants and Cooperative Agreements Officer DOT – Maritime Administration
1200 New Jersey Ave, SE Washington, DC 20590 MAR-380
W26-422
Mailstop 5
(202) 366-9714
and
David Bohnet
Grant Management Division Chief DOT – Maritime Administration 1200 New Jersey Ave, SE Washington, DC 20590
MAR-510 W21-226
Mailstop 3
(202) 366-0586
MARAD Payment System: Delphi eInvoicing System
Federal Award Identification Number: 693JF72540027
The Project consists of completing NEPA reviews, project permitting, and engineering design work for five of the port's operational berths (Berths 06, 07, 08, 10, and 11) that need to be fully reconstructed. The Project also includes design for toe walls (or similar structures) at other berths (Berths 04, 05, 09, 12, and 14) to accommodate future port-wide deepening activities.
The Project will be completed in one component with the following elements:
Prepare the appropriate draft and final documents to achieve the policies and goals established by NEPA and related regulations for berth construction projects.
Engineering analysis and survey of Berths 06, 07, 08, 10, and 11.
Establish baseline structural conditions, evaluate geotechnical conditions, compile and review as-builts, conduct subwater inspections, conduct subsurface utility engineering, review existing mooring and bollard analysis, prepare a survey, prepare conceptual structural designs (e.g., bulkhead, pile supported, etc.) and related costs estimates, prepare metocean study, prepare mooring and berthing analysis, prepare stormwater analysis, and prepare updated port-wide maps of dock load limits and bollard capacities for Berths 04, 05, 06, 07, 08, 09, 10, 11, 12
and 14.
Documents will be used for permitting, engineering design, and informing the order of dock rebuilds.
Coordinate with Tampa Harbor Pilots and U.S. Army Corps of Engineers to conduct a navigation analysis or simulation of proposed designs, if warranted.
Complete all required local, State, and Federal permitting required to start construction.
Time-dependent permitting for individual berths or portion of berths may be staggered to complement corresponding construction scheduling.
Engineering and design elements and considerations include:
Extending the apron by approximately 265 feet (from its current 412-foot length) to connect with Berth 07 and extending another approximately 97 feet toward the west to align with the southwest corner of Berth 05.
Additional considerations: new fuel pit(s); new shore utility connections (e.g., water, electric); base infrastructure for bulk cargo loading or unloading equipment; and ability to handle mobile harbor crane loading.
Engineering and design elements and considerations include:
New fuel pit(s); new shore utility connections (e.g., water, electric); ability to handle mobile harbor crane loading; base infrastructure for bulk cargo loading or unloading equipment; and new pit(s), pump(s), and underground line(s) for pneumatic ship unloaders.
Engineering and design elements and considerations include:
Additional considerations: new fuel pit(s); new shore utility connections (e.g., water, electric); ability to handle mobile harbor crane loading; new pit(s), pump(s), and underground line(s) for pneumatic ship unloaders; and new RORO ramp.
Engineering and design elements and considerations include:
Extension of Berth 10 to the west by approximately 410 feet.
Reconfiguring Berth 11 along the same alignment as the extended Berth 10 to the north, and Berths 12 and 14 to the south, to provide approximately 2,160 feet of continuous southward marginal wharf.
Additional considerations: new fuel pit(s) or similar structures on Berths 10 and 11; new shore utility connections (e.g., water, electric); and ability to handle mobile harbor crane loading.
Engineering and design elements and considerations include:
Design for toe walls (or similar structures) at Berths 04, 05, 09, 12, and 14 to accommodate future port-wide deepening activities (e.g., from the current authorized depth of -40 feet +1 foot over depth, to a depth of -50 feet + 2 feet over depth).
None.
Budget Period End Date: September 30, 2031 Period of Performance End Date: September 30, 2031
Milestone | Schedule Date |
Planned Project Start Date | April 1, 2026 |
Planned Project Completion Date | November 30, 2030 |
Milestone | Schedule Date |
Planned Project Completion Date | December 31, 2030 |
PIDP Grant Amount: $10,375,000
Federal Obligation Type: Single
Eligible Project Costs
Total | |
PIDP Funds: | $10,375,000 |
Non-Federal Funds: | $2,618,824 |
Total: | $12,993,824 |
Cost Classification | Total Costs | Non-PIDP Previously Incurred Costs | Eligible Costs |
Architectural and engineering fees | $12,993,824 | $12,993,824 | |
Project Total | $12,993,824 | $12,993,824 |
200.458. Because unapproved costs incurred before the date of this agreement are not allowable costs under this award, MARAD will neither reimburse those costs under this award nor consider them as a non-Federal cost sharing contribution to this award. Costs incurred before the date of this agreement are allowable costs under this award only if approved in writing by MARAD before being included in the Project costs and documented in this section 5. See section 15.3 of the General Terms and Conditions.
The table below compares the Project milestone dates.
Milestone | Application | Agreement |
Planned Project Start Date | February 1, 2025 | April 1, 2026 |
Planned Project Completion Date | May 31, 2027 | November 30, 2030 |
Urban-Rural Designation: Rural
Capital-Planning Designation: Planning
Funding Act: IIJA
Discretionary-CPF: Discretionary
Security Risk Designation: Low
The Recipient states that rows marked with “X” in the following table are accurate:
X | The Recipient or a project partner promotes robust job creation by supporting good-paying jobs directly related to the project with the free and fair choice to join a union. (Describe robust job creation and identify the good-paying jobs in the supporting narrative below.) |
The Recipient or a project partner will invest in high-quality workforce training programs such as registered apprenticeship programs to recruit, train, and retain skilled workers, and implement policies such as targeted hiring preferences. (Describe the training programs in the supporting narrative below.) | |
The Recipient or a project partner will partner with high-quality workforce development programs with supportive services to help train, place, and retain workers in good-paying jobs or registered apprenticeships including through the use of local and economic hiring preferences, linkage agreements with workforce programs, and proactive plans to prevent harassment. (Describe the supportive services provided to trainees and employees, preferences, and policies in the supporting narrative below.) | |
The Recipient or a project partner will partner and engage with local unions or other worker-based organizations in the development and lifecycle of the project, including through evidence of project labor agreements and/or community benefit agreements. (Describe the partnership or engagement with unions and/or other worker-based organizations and agreements in the supporting narrative below.) | |
The Recipient or a project partner will partner with communities or community groups to develop workforce strategies. (Describe the partnership and workforce strategies in the supporting narrative below.) | |
The Recipient or a project partner has taken other actions related to the Project to create good-paying jobs with the free and fair choice to join a union and incorporate strong labor standards. (Describe those actions in the supporting narrative below.) | |
The Recipient or a project partner has not yet taken actions related to the Project to create good-paying jobs with the free and fair choice to join a union and incorporate strong labor standards but, before beginning construction of the Project, will take relevant actions described in schedule B. (Identify the relevant actions from schedule B in the supporting narrative below.) |
The Recipient or a project partner has not taken actions related to the Project to improve good-paying jobs and strong labor standards and will not take those actions under this award. |
The primary purpose of berthing facilities at SeaPort Manatee is to improve the quality of life in the region through the creation of good-paying jobs, including union and non-union jobs. A recent economic impact study using 2023 data found that 42,094 jobs are directly and indirectly supported by the Port and represent a 12.89 percent increase over the 37,287 jobs identified in a previous study using 2021 data.
Additionally, the Recipient worked with Manatee County Area Transit (MCAT) to establish MCAT’s Port Manatee ConneXion (PMX). The current service has been effective since December 4, 2021. The PMX service is a mobility on-demand / call ahead service available within a defined area of northern Manatee County. Demand from current and future Port jobs will continue to serve as baseline demand to keep the service viable for the foreseeable future, which will benefit individuals that use the service to reach other destinations in the service area.
The Recipient, intending to be legally bound, is signing this agreement on the date stated opposite that party’s signature.
ATTEST:
Clerk of Circuit Court
By: By:
Signature of Recipient’s Authorized Representative
Name
Title
Date
MARAD, intending to be legally bound, is signing this agreement on the date stated opposite that party’s signature.
UNITED STATES DEPARTMENT OF TRANSPORTATION MARITIME ADMINISTRATION
By:
Date Signature of MARAD’s Authorized Representative
Name
Title
On April 21, 2022, the Authority approved Professional Services Authorization (PSA) 22-08 with AECOM Technical Services, Inc. for planning and design of a warehouse pad in the amount of $718,724. Subsequent scope changes and additional services increased the contract to $730,992. AECOM has now submitted PSA 26-03 for construction-duration extension and final inspection site revisit in the amount of $18,817, bringing the total contract value to $749,809.
Professional Services Authorization No. 26-03
FDOT Funds - $9,408.50 and Port Cash - $9,408.50
Delay in project design scope change
Move to approve and authorize the Chairman to execute Professional Services Authorization No. 26-03 to AECOM Technical Services, Inc., for additional services in the amount of
$18,817.
PROFESSIONAL SERVICES AUTHORIZATION (PSA) NO. 26-03
Pursuant to the Port Manatee Professional Services Continuing Contract dated June 16, 2020, between the Manatee County Port Authority, hereinafter referred to as the “Authority” and
AECOM TECHNICAL SERVICES, INC.
hereinafter referred to as the “Consultant”, the Authority hereby authorizes and the Consultant hereby agrees to perform the hereinafter identified professional services for the project, facility or program identified as:
Storage Initiative Phase 1 - Cargo Pad
The professional services and additional terms hereby authorized by the Authority and agreed to by the Consultant are set forth in the attached proposal dated Janruary 20, 2026, for the above entitled project, facility or program.
In its design and/or administration of any “public works project” on behalf of the Manatee County Port Authority, the Engineer will comply with the requirements of section 255.0993, Florida Statutes (2024). As used in this clause, “public works project” means activity paid for with any State of Florida funds administered by the Manatee County Port Authority which consists of the construction, maintenance, repair, renovation, remodeling, or improvement of a building, road, street, sewer, storm drain, water system, site development, irrigation system, reclamation project, gas or electrical distribution system, gas or electrical substation, or other facility, project, or portion thereof owned in whole or in part by any governmental entity.
Technical specifications prepared by the Engineer, or anyone under its control, will comply with the requirements of section 255.0993. Such requirements may apply either to construction of the public works project or to purchase of materials for the public works project. The requirements pertain to domestic production of iron and steel. The Engineer will exercise its professional judgment to determine whether and how the requirements apply to a particular public works project. All specifications and other project documents prepared by the Engineer will comply with section 255.0993.
The total fees and expenses for these professional services must not exceed:
$18,817.00
DATED:
02/26/2026
MANATEE COUNTY PORT AUTHORITY CONTRACT MANAGER
George Isiminger
By:
Carlos Buqueras
Senior Director of Engineering
Executive Director and Construction CONSULTANT
By:
Name, Title: _Randy Mejeur, Authorized Signatory/VP
If applicable, the Authority has considered and hereby approves this Supplemental Professional Engineering Services Authorization with a quorum present and voting this 24th day of March, 2026.
Attest: MANATEE COUNTY PORT AUTHORITY
By: By:
Clerk of the Circuit Court Chairman
7650 W. Courtney Campbell Causeway Tampa, Florida 33607-1462
January 20, 2026
Mr. George F. Isiminger, P.E.
Senior Director of Engineering and Construction Manatee County Port Authority
300 Tampa Bay Way, Suite 1
Palmetto, FL 34221
Subject: Request for Additional Compensation to Purchase Order PA005812
Professional Engineering Services to undertake PLANNING AND DESIGN OF A PAD FOR WAREHOUSE AND CARGO HANDLING AT PORT MANATEE.
Dear Mr. Isiminger,
AECOM Technical Services, Inc. (AECOM) requests the Port’s consideration for compensation for additional services that are not part of the scope of services under the Purchase Order PA005812 contract between SeaPort Manatee (Port) and AECOM executed April 26, 2022.
Construction Duration Extension:
The construction schedule has extended beyond the construction schedule on which AECOM’s contract was based. AECOM understands that certain schedule extensions such as delayed shipping of materials have limited effect on AECOM’s contracted services. However, contractor construction schedule has been extended for an additional 8+ months, without any notice to stop work, which requires AECOM to provide additional services for meetings, contractor coordination, RFI responses, and other construction schedule support. We are requesting additional compensation for the additional time needed to complete construction based on Submittal 01400-2C Time Extension Request versus the reality of the time duration to complete construction that is ongoing as of December 2025.
Background:
Task 7 Construction Support Service detailed in our proposal dated April 13, 2022 and the Revised Task 7 detailed in the purchase order Modification 01 dated January 23, 2023 anticipated/assumed the schedule for the Phase 3 Construction Phase services would extend for a duration of 6 months. The original schedule prepared by the contractor (Spectrum Underground Inc.) indicated a duration of 144 days lasting approximately 8 months between August 2024 and March 2025. As a result of Submittal 01400-2C Time Extension Request, the contractor was granted a one-month extension of the original construction schedule due to delayed shipping dates of the necessary electronic components for installation of the poles and light fixtures. Therefore, construction was supposed to be completed by April 2025 and has been unexpectedly extended for an additional 8+ months.
As of January 16, 2025, the contractor has not provided an updated definitive construction schedule since Submittal 01400-2C Time Extension Request. Therefore, the construction completion is at least 8+ months overdue/beyond AECOM’s schedule performance period outlined in Modification 01 to Purchase Order PA005812 dated January 23, 2023. Without any notice to stop work, AECOM provided construction support services for the additional 8+ months, which extended beyond the limits of the scope of work in the purchase order(s).
7650 W. Courtney Campbell Causeway Tampa, Florida 33607-1462
Examples of the additional tasks and services occurring during this time period include:
Six (6) additional construction meetings attended by AECOM, Port & Contractor (occurring after the original construction period end date on the following dates: 5/1/25, 9/9/25, 10/14/25, 11/12/25, 12/09/25, 01/13/26),
Electrical coordination/tasks from the incomplete electrical construction (10/25 thru 12/15) including:
preparation/coordination of post-final inspection contractor electrical clarification items
review/contractor coordination of lighting control design deviations
preparation of electrical RFI and partial punch list items and review/response to contractor
Contractor-requested assistance with building permitting inspections and contractor permit closeouts (occurring after the original construction period end date within the range of 5/8/25 through 9/4/25)
Review and coordination for three (3) additional contractor pay applications occurring after the original construction period end date (Apps# 8-10)
Final Inspection Site Re-Visit:
We are requesting additional compensation for the one (1) re-visit of the nighttime photometrics final inspection due to the incomplete November 5, 2025 nighttime photometrics final inspection site visit (which was at no fault of AECOM) (date to be determined after contractor completes final required lighting control changes).
Task 7 Construction Support Service detailed in our proposal dated April 13, 2022 and the Revised Task 7 detailed in the purchase order Modification 01 dated January 23, 2023 states “One (1) final completion inspection site visit for any portion of the Work to determine final completion.”
Background:
On the night of November 5, 2025, an AECOM Electrical Engineer was TWIC escorted by the contractor’s (Spectrum Underground Inc.) Project Manager to conduct the nighttime photometrics final inspection site visit. This nighttime photometrics final inspection site visit was coordinated and scheduled with the Port and the contractor as it was relayed to AECOM by the contractor that construction was completed per the plans/specs by the subcontractor and ready for inspection. The AECOM Electrical Engineer could not conduct the nighttime photometrics final inspection site visit because the electrical subcontractor (Himes Electric) did not install the lighting controls according to the plans and specifications and the contractor did not inform AECOM. Thus, the nighttime photometrics final inspection site visit was incapable of being completed. Therefore, an AECOM Electrical Engineer must again coordinate, prepare and re-visit the site to conduct the nighttime photometrics final inspection once the lighting controls have been modified to comply with the plans and specifications per the approved design. Please see the breakdown provided for further explanation of services rendered.
7650 W. Courtney Campbell Causeway Tampa, Florida 33607-1462
Proposed Fee:
We are submitting the following request for reimbursement of the extended construction support services provided by AECOM.
PA005812 Contract Fee (current) | $ 730,992.00 |
CA Additional Services (Construction Duration Extension) | $ 16,015.00 |
CA Additional Services (Final Inspection Site Re-Visit) | $ 2,802.00 |
Modified Total Contract Fee $ 749,809.00
Please let us know if you have any questions or can provide you with additional information on this matter. When the proposed proposal changes are deemed acceptable, please issue a modification to our Purchase Order PA005812.
Sincerely,
AECOM Technical Services, Inc.
Kevin Westberry, PE Sr. Civil Engineer Site/Civil Engineering Building + Places
D 1-813-675-6857
CC: Randy Mejeur, Vice President
Port Manatee Cargo Handling (Purchase Order PA005812) Construction Support Services occurring after April 2025 due to Construction Duration Extension | |||||
Construction Extension Support Services after April 2025 | Project Manager | Sr Electrical Eng | Staff Electrical Eng | Staff Project Eng | TOTAL |
Bill Rate / hr | 245 | 215 | 150 | 130 | |
(6) Additional Construction Meetings (after original construction services contract end date) | 4 | 1 | 1 | 6 | 12 |
Coordination with Port and Contractor for contractor | |||||
questions; preparation/coordination of post-final | |||||
inspection contractor electrical clarification items; | |||||
review/contractor coordination of lighting control design | |||||
deviations; preparation of electrical RFI and partial | |||||
punch list items and review/response to contractor; | |||||
Contractor-requested assistance with building permitting | 16 | 8 | 16 | 45 | 85 |
inspections and contractor permit closeouts (occurring | |||||
after the original construction period end date within the | |||||
range of 5/8/25 through 9/4/25); Review and | |||||
coordination for three (3) additional contractor pay | |||||
applications occurring after the original construction | |||||
period end date (Apps# 8-10) | |||||
Hour Total | 20 | 9 | 17 | 51 | 97 |
$ 4,900.00 | $ 1,935.00 | $ 2,550.00 | $ 6,630.00 | $ 16,015.00 | |
Bill Rate / hr | 245 | 215 | 150 | 130 | ||
Re-Coord w Contractor-Vendor / Preparation | 1 | 1 | 2 | 4 | 8 | |
Site Visit | 0 | 0 | 4 | 0 | 4 | |
Coordination / Followup Documentation / QAQC | 1 | 0 | 2 | 2 | 5 | |
Hour Total | 2 | 1 | 8 | 6 | 17 | |
Travel Expenses | $ 117.00 | |||||
$ 490.00 | $ 215.00 | $ 1,200.00 | $ 780.00 | $ 2,802.00 | ||
TOTAL
Staff Project Eng
Staff Electrical Eng
Sr Electrical
Project Manager Eng
Nightime Photometrics Inspection Site Revisit
Port Manatee Cargo Handling (Purchase Order PA005812)
Re-visit of nighttime photometrics final inspection site visit
On August 19, 2025, the Authority approved the Fiscal Year 2026 budget, which included funding to replace the roof at Warehouse #4 and to repair the roof at the Operations & Maintenance (O&M) building. On December 11, 2025, the Authority received a proposal from Weatherproofing Technologies, Inc., a federally contracted roofing firm and OMNIA Partner (Contract R#230404), to perform the work.
The project includes removal of the existing roof, repairs to the underlayment, and installation of a new built-up membrane roof with a 20-year warranty. The cost for this work is $1,151,819.72.
The scope includes replacing the outer six feet of the perimeter roof and applying a protective coating to the remaining roof surface to prevent future leaks. This work carries a 12-year warranty. The cost for this project is $350,545.92.
When completed together, the total project cost is $1,497,365.64, reflecting a discount for concurrent construction. Completing the projects separately would increase the individual costs.
Move to approve and authorize the Chairman to execute Piggybacking Agreement for Roofing Products, Services, and Job-Order-Contracting Services, Contract Number MCPA-PBA-26-01 to Waetherproofing Technologies, Inc., to complete roof replacement and repairs at Warehouse #4 and the Operations & Manintenace Buiuldings for a total cost of
$1,497,365.64.
PIGGYBACKING AGREEMENT FOR
ROOFING PRODUCTS, SERVICES, AND JOB-ORDER-CONTRACTING SERVICES
CONTRACT NUMBER MCPA-PBA-26-01
day of , 2026 (“Effective Date”), by and between Manatee County Port Authority, a political entity of the State of Florida, with its place of business located at Port Manatee, 300 Tampa Bay Way, Suite One, FL 34221, ("Authority") and WEATHERPROOFING TECHNOLOGIES, INC., a Delaware corporation duly authorized to conduct business in the state of Florida with its principal place of business located at 3735 Green Road, Beachwood, OH 44122 (“Contractor”)(collectively, the “Parties”).
The above recitals and all exhibits hereto are true and correct and incorporated herein by reference. The Contractor’s representations and warranties set forth in the recitals as incorporated into this Agreement by this reference are a material component to the Authority’s ability to enter into this Agreement. The Contractor shall fully indemnify, defend, and hold harmless the Authority and its representatives, employees, officers, and commissioners, from any and all damages, causes of action, or claims of any kind related to the Contractor’s representations and warranties set forth herein, the veracity of such representations and warranties, and all matters related thereto.
The scope of work is identified in the Original Contract, and the Contractor’s scope of work with the Authority is more specifically defined in Exhibit B attached hereto and incorporated herein. The Contractor agrees to furnish all labor, equipment, machines, and the skill necessary for the entire work effort as set forth in the Original Contract to the satisfaction of the Authority or its duly authorized representative.
The terms and conditions of the Original Contract are hereby incorporated into this Agreement by reference. The Contractor shall complete the Authority Project on the same terms, conditions, and scope as set forth in the Original Contract, except as specifically modified herein solely to account for the Authority as the purchaser. Such modifications shall not include any increase in the prices or changes to the scope of the work in the Original Agreement. The Contractor’s work on the Authority Project shall at all times be at the same unit prices as set forth in the Original Contract.
In interpreting this Agreement and resolving any ambiguities or conflicts between this Agreement and the Original Contract, including any exhibits and addenda, this Agreement takes precedence over the Original Contract and its exhibits and addenda and any inconsistency between the Original Contract and its exhibits or addenda shall be resolved by giving precedence to the Original Contract.
The Authority agrees to pay the Contractor for services rendered in accordance with the primary structure set forth in the Original Contract and more particularly described in Exhibit B. All invoices shall be submitted in accordance with the Local Government Prompt Payment Act, sections 218.70 through 218.79, Florida Statutes, as may be amended. All payments shall be due on the date established by the Local Government Prompt Payment Act. Payment due date for purchase of goods or services other than construction services is net 45 days from the date an invoice submitted in accordance with the Florida Prompt Payment Act is received by the Authority. In the event of a disputed invoice, only that portion so contested will be withheld from payment and the undisputed portion shall be due and payable on the terms set forth herein. The Authority does not pay sales tax and will provide sales tax exemption information at the written request of the Contractor, where necessary.
Pursuant to all notice requirements established by the Original Contract, notices under this Agreement shall be made in writing and sent by certified return receipt requested mail, addressed to the following:
If to the Authority: If to Contractor: SeaPort Manatee _weatherproofing Technologies, Inc. Attn: John D. Glass, Jr., PE Attn: JK Milliken, President
300 Tampa Bay Way, Suite One
Palmetto, FL 34221
3735 Green Road
Beachwood, OH 44122
With required copy to:
General Counsel, Manatee County Port Authority Bryant Miller Olive P.A.
400 N Tampa St Suite 1600,
Tampa, FL 33602
or to such other address or facsimile number as the Authority may direct from time to time by written notice forwarded to the Contractor as provided above.
Prior to this Agreement taking effect, the Contractor shall have in place the insurance coverages required by the Original Contract and shall provide certificates of insurance reflecting the Authority, its agents, employees, and public officials as named additional insureds. Prior to commencement of the Authority Project, the Contractor shall have in place the bonds required by the Original Contract for the benefit of the Authority.
The Parties recognize that the Contractor is an independent contractor. The Contractor agrees to assume liability for and indemnify, hold harmless, and defend the Authority, its commissioners, mayor, officers, employees, agents, and attorneys of, from, and against all liability and expense, including reasonable attorneys' fees in connection with any and all claims, demands, damages, actions, causes of action, and suits in equity of whatever kind or nature, including claims for personal injury, property damage, relief, or loss of use, arising out of the execution, performance nonperformance of the duties of the Contractor under this Agreement, the enforcement of this Agreement, or resulting from the activities of the Contractor in any way connected to this Agreement, but only to the extent not solely due to or caused by the negligence of the Authority, its commissioners, mayor, officers, employees, agents and attorneys. The Contractor's liability hereunder shall include all attorneys' fees and costs incurred by the Authority, in the enforcement of this indemnification provision. This indemnification provision includes claims made by any employees of the Contractor against the Authority, and the Contractor hereby waives its entitlement, if any, to immunity under section 440.11, Florida Statutes. Nothing contained in this Agreement, and specifically this paragraph requiring the Contractor to indemnify the Authority, is intended to nor shall it be construed as an additional waiver of sovereign immunity by the Authority beyond the Authority’s expressed written contractual obligations contained within this Agreement, nor shall it be construed as a waiver of any defenses or limitations to any claims, including those based on the doctrine of sovereign immunity or section 768.28, Florida Statutes. The obligations contained in this paragraph shall survive the termination of this Agreement, however terminated and shall not be limited by the amount of any insurance required to be obtained or maintained under this Agreement or the Original Contract.
Pursuant to section 119.0701, Florida Statutes, for any tasks performed by the Contractor on behalf of the Authority, the Contractor shall: (a) keep and maintain all public records, as that term is defined in chapter 119, Florida Statutes (“Public Records”), required by the Authority to perform the work contemplated by this Agreement; (b) upon request from the Authority’s custodian of public records, provide the Authority with a copy of the requested Public Records or
allow the Public Records to be inspected or copied within a reasonable time at a cost that does not exceed the costs provided in chapter 119, Florida Statutes, or as otherwise provided by law; (c) ensure that Public Records that are exempt or confidential and exempt from Public Records disclosure requirements are not disclosed except as authorized by law for the duration of the term of this Agreement and following completion or termination of this Agreement, if the Contractor does not transfer the records to the Authority in accordance with (d) below; and (d) upon completion or termination of this Agreement, (i) if the Authority, in its sole and absolute discretion, requests that all Public Records in possession of the Contractor be transferred to the Authority, the Contractor shall transfer, at no cost, to the Authority, all Public Records in possession of the Contractor within 30 days of such request or (ii) if no such request is made by the Authority, the Contractor shall keep and maintain the Public Records required by the Authority to perform the work contemplated by this Agreement. If the Contractor transfers all Public Records to the Authority pursuant to (d)(i) above, Contractor shall destroy any duplicate Public Records that are exempt or confidential and exempt from Public Records disclosure requirements within thirty (30) days of transferring the Public Records to the Authority and provide the Authority with written confirmation that such records have been destroyed within 30 days of transferring the Public Records. If the Contractor keeps and maintains Public Records pursuant to (d)(ii) above, the Contractor shall meet all applicable requirements for retaining Public Records. All Public Records stored electronically must be provided to the Authority, upon request from the Authority’s custodian of public records, in a format that is compatible with the information technology of the Authority. If the Contractor does not comply with a Public Records request or does not comply with a Public Records request within a reasonable amount of time, the Authority may pursue any and all remedies available in law or equity including, but not limited to, specific performance or immediate termination of the contract. The provisions of this section only apply to those tasks in which the Contractor is acting on behalf of the Authority.
This Agreement represents the entire agreement. No prior discussions or negotiations will be enforceable, unless included in this Agreement.
This Agreement is not assignable. Any modification to this Agreement must be made in writing, duly executed by both Parties.
This Agreement shall be construed by and controlled under the laws of the State of Florida. The Parties consent to jurisdiction over them in the State of Florida and agree that venue for any state action arising under this Agreement shall lie solely in the courts located in Pinellas County, Florida, and for any federal action shall lie solely in the United States District Court, Middle District of Florida, Tampa Division.
If any one or more part, term, or provision of this Agreement shall be held to be invalid, illegal, or unenforceable in any respect by a court of competent jurisdiction, the validity, legality, and enforceability of the remaining provisions hereof shall not in any way be affected or impaired
thereby and this Agreement shall be treated as though the invalidated portion(s) had never been a part hereof.
The Parties represent and warrant that they have entered into this Agreement relying wholly upon their own judgment, belief, and knowledge of the nature, extent, effect, and duration of any actions, damages, and liability. The Parties represent that they have had the opportunity to discuss this matter with legal counsel of their choosing and are satisfied with its counsel and the advice received. This Agreement will be deemed and treated as drafted jointly by all the Parties. The Parties understand this Agreement’s contents and agree that this Agreement will not be construed more strongly against any Party to the Agreement, regardless of who is responsible for its preparation or drafting. The Parties further declare and represent that no promise, inducement, agreement, or understanding not expressed in this Agreement has been made to an adverse party and that the terms of this Agreement are contractual and not a mere recital.
All words used in this Agreement in the singular will extend to and include the plural, and the use of any gender will extend to and include all genders. The term "including" is not limiting.
Each of the Parties to this Agreement covenants to the other Party to this Agreement that it has lawful authority to enter into this Agreement, that the governing or managing body of each of the Parties has approved this Agreement and that the governing or managing body of each of the Parties has authorized the execution of this Agreement in the manner set forth below.
This Agreement must be executed by the Parties’ respective duly authorized official(s) and will take effect as of the Effective Date and remain in effect as provided in the Original Contract.
Contractor shall comply with all applicable provisions of sections 448.09 and 448.095, Florida Statutes, as may be amended. The definitions in section 448.095(1), Florida Statutes, as may be amended, apply to this section of the Agreement. Contractor shall register with and use the
U.S. Department of Homeland Security’s E-Verify system to verify the work authorization status of all employees of Contractor. Contractor may not enter into a contract with a subcontractor to perform work under this Agreement unless and until the subcontractor registers with and uses the E-Verify system. If Contractor enters into a contract with a subcontractor to perform work under this Agreement, Contractor must obtain a properly executed affidavit from the subcontractor stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. Contractor must maintain copies of all such affidavits for the duration of this Agreement. Authority may terminate this Agreement for cause if Authority determines that Contractor or Contractor’s subcontractor has not complied with any applicable provision of sections 448.09 or 448.095, Florida Statutes, as may be amended. Authority will terminate this Agreement for cause if Authority has a good faith belief that Contractor has knowingly violated subsection 448.09(1), Florida Statutes, as may be amended. If the Authority has a good faith belief that a subcontractor knowingly violated section 448.09(1), Florida Statutes, as may be amended, but Authority determines that Contractor otherwise complied with section 448.09(1), Florida Statutes, as may be amended, Authority will notify Contractor as such, and Contractor must immediately terminate Contractor’s contract with said subcontractor. If this Agreement is terminated under section 448.095(c), F.S.: (a) such termination is not a breach of this Agreement and may not be considered as such; (b) Contractor may not be awarded a public contract for at least 1 year after the date on which the Agreement is terminated; and (c) Contractor is liable for any additional costs incurred by the Authority as a result of the termination of the Agreement.
This Agreement may be executed by electronic signature technology and such electronic signature shall act as the Parties’ legal signatures on this Agreement and shall be treated in all respects as an original handwritten signature. This Agreement may be executed in one or more counterparts, any one of which need not contain the signatures of more than one party, but all such counterparts taken together will constitute one and the same instrument.
In the event the Authority, in its sole discretion, determines that sufficient budgeted funds are not available to appropriate for payments due to the Contractor under this Agreement, the Authority shall notify the Contractor of such occurrence and this Agreement shall terminate on the last day of the current fiscal period without any penalty or expense to the Authority.
Contractor agrees that Contractor does not and will not, nor will it allow a subcontractor to, use any funds from the Authority for the purpose of issuing an identification card or document to any individual who does not provide proof of lawful presence in the United States.
By executing this Agreement and each and every renewal hereof (if renewal is separately provided for herein), pursuant to section 287.135, Florida Statutes, Contractor certifies, represents, and warrants that: (a) it is not on the Scrutinized Companies with Activities in Sudan List, (b) it is not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, (c) it is not on the Scrutinized Companies with Activities in Iran Terrorism Sectors List, (d) that it does not have Business operations or is engaged in business in Cuba or Syria, and (e) that it is not engaged or engaging in a Boycott of Israel, and that all such certifications were true at the time it submitted its bid or proposal for this Agreement, as of the Effective Date of this Agreement, and as of the effective date of any renewal of this Agreement. Notwithstanding anything contained in this Agreement to the contrary, the Authority may terminate this Agreement immediately for cause if: (1) Contractor is found to have submitted a false certification regarding (a) – (e) above in accordance with section 287.135(5), Florida Statutes, (2) Contractor is found to have been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or is or has been engaged in Business operations in Cuba or Syria or a Boycott of Israel, or (3) Contractor is found to have been placed on a list created pursuant to section 215.473, Florida Statutes, relating to scrutinized active business operations in Iran. Such termination shall be in addition to any and all remedies available to the Authority at law or in equity. The terms “Boycott of Israel” and “Business operations” used in this section are defined as in Section 287.135, Florida Statutes. The Lists referred to in this section are those Lists in and maintained pursuant to section 287.135, Florida Statutes.
Pursuant to section 286.101, Florida Statutes, Contractor shall disclose any current or prior interest of, any contract with, or any grant or gift received from a Foreign Country of Concern, as defined below, if such interest, contract, or grant or gift has a value of $50,000 or more and such interest existed at any time or such contract or grant or gift was received or in force at any time during the previous five (5) years. For purposes of this section, “Foreign Country of Concern” means the People’s Republic of China, the Russian Federation, the Islamic Republic of Iran, the Democratic People’s Republic of Korea, the Republic of Cuba, the Venezuelan regime of Nicolas Maduro, or the Syrian Arab Republic, including any agency of or any other entity under significant control of such foreign country of concern. Contractor’s disclosure shall include the name and mailing address of the disclosing entity, the amount of the contract or grant or gift or the value of the interest disclosed, the applicable foreign country of concern and, if applicable, the date of termination of the contract or interest, the date of receipt of the grant or gift, and the name of the agent or controlled entity that is the source or interest holder. Contractor represents that within one
(1) year before proposing any contract to the Authority, Contractor provided a copy of such disclosure to the Florida Department of Financial Services.
By executing this Agreement and each and every renewal hereof (if renewal is separately provided for herein), pursuant to section 786.06, Florida Statutes, Contractor certifies, represents, and warrants that it does not use coercion for labor services, as those terms are defined in section
786.06. Contractor will provide to the Authority an affidavit signed by an officer or representative of Contractor under penalty of perjury attesting that Contractor does not use coercion for labor or services. Notwithstanding anything contained in this Agreement to the contrary, the Authority may terminate this Agreement immediately if Contractor is found to have submitted a false attestation. Such termination shall be in addition to any and all remedies available to the Authority at law or in equity.
ATTEST: ANGELINA “ANGEL” COLONNESO MANATEE COUNTY PORT
Clerk of the Circuit Court AUTHORITY
By: By:
Chairman
PORT AUTHORITY
CONTRACTOR:
By:
Signature
Print Name & Title
(Corporate Seal)
Witness Signature
Printed Name of Witness
Title of Witness
Composite Exhibit A
Original Contract with Solicitation, Contractor’s Response, Evaluation Tabulation, and Award
Region 4 Education Service Center (ESC)
for
ROOFING PRODUCTS, SERVICES AND JOB-ORDER-CONTRACTING (JOC) SERVICES
with
Effective: November 1,2023
The following documents comprise the executed contract between the Region 4 Education Service Center and Weatherproofing Technologies Inc effective November 1, 2023:
Vendor Contract and Signature Form
Supplier’s Response to the RFP, incorporated by reference
CONTRACT
This Contract (“Contract”) is made as of November 1, 2023, by and between Weatherproofing Technologies Inc. (“Contractor”) and Region 4 Education Service Center (“Region 4 ESC”) for the purchase of Roofing Products, Services, & Job-Order-Contracting (JOC) Services (“the products and services”).
RECITALS
WHEREAS, Region 4 ESC issued Request for Proposals Number 23-04 for Roofing Products, Services, & Job-Order-Contracting (JOC) Services (“the products and services”) (“RFP”), to which Contractor provided a response (“Proposal”); and
WHEREAS, Region 4 ESC selected Contractor’s Proposal and wishes to engage Contractor in providing the services/materials described in the RFP and Proposal;
WHEREAS, both parties agree and understand the following pages will constitute the Contract between the Contractor and Region 4 ESC, having its principal place of business at 7145 West Tidwell Road, Houston, TX 77092.
WHEREAS, Contractor included, in writing, any required exceptions or deviations from these terms, conditions, and specifications; and it is further understood that, if agreed to by Region 4 ESC, said exceptions or deviations are incorporated into the Contract.
WHEREAS, this Contract consists of the provisions set forth below, including provisions of all attachments referenced herein. In the event of a conflict between the provisions set forth below and those contained in any attachment, the provisions set forth below shall control.
WHEREAS, the Contract will provide that any state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”) may purchase products and services at prices indicated in the Contract upon the Public Agency’s registration with OMNIA Partners.
Term of agreement. The initial term of the Contract is for a period of three (3) years unless terminated, canceled or extended as otherwise provided herein. Region 4 ESC shall have the right in its sole discretion to renew the Contract for an additional term of up to two (2) years or for a lesser period of time as determined by Region 4 ESC by providing written notice to the Contractor of Region 4 ESC’s intent to renew thirty (30) days prior to the expiration of the original term. Contractor acknowledges and understands Region 4 ESC is under no obligation whatsoever to extend the term of this Contract. Notwithstanding the forgoing paragraph, the term of the Contract, including any extension of the original term, shall be further extended until the expiration of any Purchase Order issued under the Contract for a period of up to one year beyond the Contract term.
Scope: Contractor shall perform all duties, responsibilities and obligations, set forth in this agreement, and described in the RFP, incorporated herein by reference as though fully set forth herein.
Form of Contract. The form of Contract shall be the RFP, the Offeror’s proposal and Best and Final Offer(s).
Order of Precedence. In the event of a conflict in the provisions of the Contract as accepted by Region 4 ESC, the following order of precedence shall prevail:
This Contract
Offeror’s Best and Final Offer
Offeror’s proposal
RFP and any addenda
Commencement of Work. The Contractor is cautioned not to commence any billable work or provide any material or service under this Contract until Contractor receives a purchase order for such work or is otherwise directed to do so in writing by Region 4 ESC.
Entire Agreement (Parol evidence). The Contract, as specified above, represents the final written expression of agreement. All agreements are contained herein and no other agreements or representations that materially alter it are acceptable.
Assignment of Contract. No assignment of Contract may be made without the prior written approval of Region 4 ESC. Contractor is required to notify Region 4 ESC when any material change in operations is made (i.e., bankruptcy, change of ownership, merger, etc.).
Novation. If Contractor sells or transfers all assets or the entire portion of the assets used to perform this Contract, a successor in interest must guarantee to perform all obligations under this Contract. Region 4 ESC reserves the right to accept or reject any new party. A change of name agreement will not change the contractual obligations of Contractor.
Contract Alterations. No alterations to the terms of this Contract shall be valid or binding unless authorized and signed by Region 4 ESC.
Adding Authorized Distributors/Dealers.
The National Cooperative Contractor Network roster lists the individual pre-qualified and In-Network contractors that are independently owned and part of this RFP response. This roster will be updated as new contractors enter the program who demonstrate competency in the stipulated criteria and that agree to the terms and conditions contained in this RFP. Contractors accepted in the Contractor Network Program will be sent to Region 4 ESC for approval prior to performing work for OMNIA Members.
Under the Contractor Network Method of Delivery, which is included in our response, the awarded In-Network contractor is the prime. All POs, invoices, payments, etc. will occur directly between the In-Network Contractor and the Participating Public Agency directly.
TERMINATION OF CONTRACT
Cancellation for Non-Performance or Contractor Deficiency. Region 4 ESC may terminate the Contract if purchase volume is determined to be low volume in any 12-month period. Region 4 ESC reserves the right to cancel the whole or any part of this Contract due to failure by Contractor to carry out any obligation, term or condition of the contract. Region 4 ESC may issue a written deficiency notice to Contractor for acting or failing to act in any of the following:
Providing material that does not meet the specifications of the Contract;
Providing work or material was not awarded under the Contract;
Failing to adequately perform the services set forth in the scope of work and specifications;
Failing to complete required work or furnish required materials within a reasonable amount of time;
Failing to make progress in performance of the Contract or giving Region 4 ESC reason to believe Contractor will not or cannot perform the requirements of the Contract; or
Performing work or providing services under the Contract prior to receiving an authorized purchase order.
Upon receipt of a written deficiency notice, Contractor shall have ten (10) days to provide a satisfactory response to Region 4 ESC. Failure to adequately address all issues of concern may result in Contract cancellation. Upon cancellation under this paragraph, all goods, materials, work, documents, data and reports prepared by Contractor under the Contract shall immediately become the property of Region 4 ESC.
Termination for Cause. If, for any reason, Contractor fails to fulfill its obligation in a timely manner, or Contractor violates any of the covenants, agreements, or stipulations of this Contract Region 4 ESC reserves the right to terminate the Contract immediately and pursue all other applicable remedies afforded by law. Such termination shall be effective by delivery of notice, to the Contractor, specifying the effective date of termination. In such event, all documents, data, studies, surveys, drawings, maps, models and reports prepared by Contractor will become the property of the Region 4 ESC. If such event does occur, Contractor will be entitled to receive just and equitable compensation for the satisfactory work completed on such documents.
Delivery/Service Failures. Failure to deliver goods or services within the time specified, or within a reasonable time period as interpreted by the purchasing agent or failure to make replacements or corrections of rejected articles/services when so requested shall constitute grounds for the Contract to be terminated. In the event Region 4 ESC must purchase in an open market, Contractor agrees to reimburse Region 4 ESC, within a reasonable time period, for all expenses incurred.
Force Majeure. If by reason of Force Majeure, either party hereto shall be rendered unable wholly or in part to carry out its obligations under this Agreement then such party shall give notice and full particulars of Force Majeure in writing to the other party within a reasonable time after occurrence of the event or cause relied upon, and the obligation of the party giving such notice, so far as it is affected by such Force Majeure, shall be suspended during the continuance of the inability then claimed, except as hereinafter provided, but for no longer period, and such party shall endeavor to remove or overcome such inability with all reasonable dispatch.
The term Force Majeure as employed herein, shall mean acts of God, strikes, lockouts, or other industrial disturbances, act of public enemy, orders of any kind of government of the United States or the State of Texas or any civil or military authority; insurrections; riots; epidemics; landslides; lighting; earthquake; fires; hurricanes; storms; floods; washouts; droughts; arrests; restraint of government and people; civil disturbances; explosions, breakage or accidents to machinery, pipelines or canals, or other causes not reasonably within the control of the party claiming such inability. It is understood and agreed that the settlement of strikes and lockouts shall be entirely within the discretion of the party having the difficulty, and that the above requirement that any Force Majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes and lockouts by acceding to the demands of the opposing party or parties when such settlement is unfavorable in the judgment of the party having the difficulty.
Standard Cancellation. Region 4 ESC may cancel this Contract in whole or in part by providing written notice. The cancellation will take effect 30 business days after the other party receives the notice of cancellation. After the 30th business day all work will cease following completion of final purchase order.
Licenses. Contractor shall maintain in current status all federal, state and local licenses, bonds and permits required for the operation of the business conducted by Contractor. Contractor shall remain fully informed of and in compliance with all ordinances and regulations pertaining to the lawful provision of services under the Contract. Region 4 ESC reserves the right to stop work and/or cancel the Contract if Contractor’s license(s) expire, lapse, are suspended or terminated.
Survival Clause. All applicable software license agreements, warranties or service agreements that are entered into between Contractor and Region 4 ESC under the terms and conditions of the Contract shall survive the expiration or termination of the Contract. Proposals submitted to OMNIA Members prior to expiration or termination of the contract that lead to the issuance of a purchase order will survive the term of the agreement. All Purchase Orders issued and accepted by Contractor shall survive expiration or termination of the Contract for a period of up to one year beyond the term of the Contract.
Delivery. Conforming product shall be shipped within 7 days of receipt of Purchase Order. If delivery is not or cannot be made within this time period, the Contractor must receive authorization for the delayed delivery. The order may be canceled if the estimated shipping time is not acceptable. All deliveries shall be freight prepaid, and freight pricing will be provided on each proposal.
Inspection & Acceptance. If defective or incorrect material is delivered, Region 4 ESC may make the determination to return the material to the Contractor at no cost to Region 4 ESC. The Contractor agrees to pay all shipping costs for the return shipment. Contractor shall be responsible for arranging the return of the defective or incorrect material.
Payments. Payment shall be made after satisfactory performance, in accordance with all provisions thereof, and upon receipt of a properly completed invoice.
Price Adjustments. Should it become necessary or proper during the term of this Contract to make any change in design or any alterations that will increase price, Region 4 ESC must be notified immediately. Price increases must be approved by Region 4 ESC and no payment for additional materials or services, beyond the amount stipulated in the Contract shall be paid without prior approval. All price increases must be supported by manufacturer documentation, or a formal cost justification letter. Contractor must honor previous prices for thirty (30) days after approval and written notification from Region 4 ESC. It is the Contractor’s responsibility to keep all pricing up to date and on file with Region 4 ESC. All price changes must be provided to Region 4 ESC, using the same format as was provided and accepted in the Contractor’s proposal.
Price reductions may be offered at any time during Contract. Special, time-limited reductions are permissible under the following conditions: 1) reduction is available to all users equally; 2) reduction is for a specific period, normally not less than thirty (30) days; and 3) original price is not exceeded after the time-limit. Contractor shall offer Region 4 ESC any published price reduction during the Contract term.
Audit Rights. Contractor shall, at its sole expense, maintain appropriate due diligence of all purchases made by Region 4 ESC and any entity that utilizes this Contract. Region 4 ESC reserves the right to audit the accounting for a period of three (3) years from the time such purchases are made. This audit right shall survive termination of this Agreement for a period of one (1) year from the effective date of termination. Region 4 ESC shall have the authority to conduct random audits of Contractor’s pricing at Region 4 ESC's sole cost and expense. Notwithstanding the foregoing, in the event that Region 4 ESC is made aware of any pricing being offered that is materially inconsistent with the pricing under this agreement, Region 4 ESC shall have the ability to conduct an extensive audit of Contractor’s pricing at Contractor’s sole cost and expense. Region 4 ESC may conduct the audit internally or may engage a third-party auditing firm. In the event of an audit, the requested materials shall be provided in the format and at the location designated by Region 4 ESC.
Discontinued Products. If a product or model is discontinued by the manufacturer, Contractor may substitute a new product or model if the replacement product meets or exceeds the specifications and performance of the discontinued model and if the discount is the same or greater than the discontinued model.
New Products/Services. New products and/or services that meet the scope of work may be added to the Contract. Pricing shall be equivalent to the percentage discount for other products. Contractor may replace or add product lines if the line is replacing or supplementing products, is equal or superior to the original products, is discounted similarly or greater than the original discount, and if the products meet the requirements of the Contract. No products and/or services may be added to avoid competitive procurement requirements. Region 4 ESC may require additions to be submitted with documentation from Members demonstrating an interest in, or a potential requirement for, the new product or service. Region 4 ESC may reject any additions without cause.
Options. Optional equipment for products under Contract may be added to the Contract at the time they become available under the following conditions: 1) the option is priced at a discount similar to other options; 2) the option is an enhancement to the unit that improves performance or reliability.
Warranty Conditions. All supplies, equipment and services shall include manufacturer's minimum standard warranty and one (1) year labor warranty unless otherwise agreed to in writing.
Site Cleanup. Contractor shall clean up and remove all debris and rubbish resulting from their work as required or directed. Upon completion of the work, the premises shall be left in good repair and an orderly, neat, clean, safe and unobstructed condition.
Site Preparation. Contractor shall not begin a project for which the site has not been prepared, unless Contractor does the preparation work at no cost, or until Region 4 ESC includes the cost of site preparation in a purchase order. Site preparation includes, but is not limited to moving furniture, installing wiring for networks or power, and similar pre-installation requirements.
Registered Sex Offender Restrictions. For work to be performed at schools, Contractor agrees no employee or employee of a subcontractor who has been adjudicated to be a registered sex offender will perform work at any time when students are or are reasonably expected to be present. Contractor agrees a violation of this condition shall be considered a
material breach and may result in the cancellation of the purchase order at Region 4 ESC’s discretion. Contractor must identify any additional costs associated with compliance of this term. If no costs are specified, compliance with this term will be provided at no additional charge.
Safety measures. Contractor shall take all reasonable precautions for the safety of employees on the worksite and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Contractor shall post warning signs against all hazards created by its operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.
Smoking. Persons working under the Contract shall adhere to local smoking policies. Smoking will only be permitted in posted areas or off premises.
Stored materials. Upon prior written agreement between the Contractor and Region 4 ESC, payment may be made for materials not incorporated in the work but delivered and suitably stored at the site or some other location, for installation at a later date. An inventory of the stored materials must be provided to Region 4 ESC prior to payment. Such materials must be stored and protected in a secure location and be insured for their full value by the Contractor against loss and damage. Contractor agrees to provide proof of coverage and additionally insured upon request. Additionally, if stored offsite, the materials must also be clearly identified as property of Region 4 ESC and be separated from other materials. Region 4 ESC must be allowed reasonable opportunity to inspect and take inventory of stored materials, on or offsite, as necessary. Until final acceptance by Region 4 ESC, it shall be the Contractor's responsibility to protect all materials and equipment. Contractor warrants and guarantees that title for all work, materials and equipment shall pass to Region 4 ESC upon final acceptance.
Funding Out Clause. A Contract for the acquisition, including lease, of real or personal property is a commitment of Region 4 ESC’s current revenue only. Region 4 ESC retains the right to terminate the Contract at the expiration of each budget period during the term of the Contract and is conditioned on a best effort attempt by Region 4 ESC to obtain appropriate funds for payment of the contract.
Indemnity. Contractor shall protect, indemnify, and hold harmless both Region 4 ESC and its administrators, employees and agents against all claims, damages, losses and expenses arising out of or resulting from the actions of the Contractor, Contractor employees or subcontractors in the preparation of the solicitation and the later execution of the Contract. Any litigation involving either Region 4 ESC, its administrators and employees and agents will be in Harris County, Texas.
Marketing. Contractor agrees to allow Region 4 ESC to use their name and logo within website, marketing materials and advertisement. Any use of Region 4 ESC name and logo or any form of publicity, inclusive of press releases, regarding this Contract by Contractor must have prior approval from Region 4 ESC.
Certificates of Insurance. Certificates of insurance shall be delivered to the Region 4 ESC prior to commencement of work. The Contractor shall give Region 4 ESC a minimum of ten
(10) days’ notice prior to any modifications or cancellation of policies. The Contractor shall require all subcontractors performing any work to maintain coverage as specified.
Legal Obligations. It is Contractor’s responsibility to be aware of and comply with all local, state, and federal laws governing the sale of products/services and shall comply with all laws while fulfilling the Contract. Applicable laws and regulation must be followed even if not specifically identified herein.
OFFER AND CONTRACT SIGNATURE FORM
The undersigned hereby offers and, if awarded, agrees to furnish goods and/or services in strict compliance with the terms, specifications and conditions at the prices proposed within response unless noted in writing.
Company Name Weatherproofing Technologies Inc.
Address 3735 Green Rd.
City/State/Zip Beachwood. OH 44122
Telephone No. 1216) 292-5064
Email Address JKMilliken@tremcoinc.com
Printed Name J-K Milliken
Title President
Authorized signature ��/ 44-
Accepted by Region 4 ESC:
Contract No. ----=--:R=23=0=-4.:....:0:. 4 _
In.it.ial Contract Term 11/1/2023 to
�✓½1�
Region 4 ESC Authorized IBo
Wt/1eLJ T Pll2fe/l i>
Print Name
w�Of(I�
uVw.e,,
Region 4 ESC Au��o/ized Board Member
rv,s�
Print Name
10/31/2026
_
10/ff�cJ._J
Date
/a /,.,u /;;.o.;;..:a
�
FLORIDA 1.20
Effective 08/15/2025
Roofing & Envelope Services Bid Contract
#R230404
Line | Description | Unit of Measure | FL Rate |
Water Resistant Roofing | |||
1 | Pressure cleaning, vertical walls | SF | $ 0.22 |
2 | Pressure cleaning, horizontal surfaces | SF | $ 0.46 |
3 | Roof scanning to identify wet or substandard room components to be removed | SF | $ 0.02 |
4 | Asphalt emulsion coating, waterproofing, brush applied, per coat | SF | $ 0.11 |
5 | Rubberized coating waterproofing, brush applied, per coat | SF | $ 0.18 |
6 | Vinyl/acrylic resin, dampproofing, brush applied per coat. | SF | $ 0.18 |
7 | Non-pigmented synthetic resin, waterproofing, one coat sprayed on | SF | $ 0.18 |
8 | Caulking: remove existing, clean and prime joint | LF | $ 1.06 |
9 | Caulking, epoxied urethane compound, 2 component, 1/4” x 1/4”, in place | LF | $ 0.96 |
10 | Caulking, polyurethane, 1 component, 1/4” x 1/4”, in place | LF | $ 1.24 |
11 | Caulking, polyurethane, 1 component, 1/2” x 1/2”, in place | LF | $ 1.20 |
12 | Caulking, silicone rubber, 1 component, 1/4” x 1/4”, in place | LF | $ 1.02 |
13 | Caulking, epoxied urethane compound, 2 component, 1/4” x 1/4”, in place | LF | $ 1.68 |
14 | Caulking, silicone rubber, 1 component, 3/4” x 3/8”, in place | LF | $ 1.20 |
15 | Backer rod, polyethylene, 3/8” diameter, installed in prepared opening | LF | $ 0.25 |
16 | Backer rod, polyethylene, 1/2” diameter, installed in prepared opening | LF | $ 0.40 |
17 | Backer rod, polyethylene, 3/4” diameter, installed in prepared opening | LF | $ 0.42 |
18 | Backer rod, polyethylene, 1” diameter, installed in prepared opening | LF | $ 0.49 |
19 | Building paper, asphalt felt sheathing paper, 1 ply, 15#, in place | SF | $ 0.24 |
20 | Building paper, asphalt felt sheathing paper, 1 ply, 40#, in place | SF | $ 0.13 |
21 | Building paper, red rosin paper, 5 square rolls, 4#, in place | SF | $ 0.14 |
22 | Vapor retarder adhered, 2 ply inorganic, glass Type 15, applied in Type IV (or appropriate type) asphalt, in place | SF | $ 0.26 |
23 | Vapor retarder, 2 ply organic, Type 15 pound, applied in Type IV asphalt (or appropriate type), in place | SF | $ 0.49 |
24 | Vapor retarder; 2-ply inorganic, glass, Type IV, applied in cold adhesive to 4’ x 8’ x 1/4” glass- mat embedded, water resistant gypsum core panel mechanically fastened | SF | $ 0.60 |
Insulation | |||
1 | Demolition of roof insulation, per inch of depth | SF | $ 0.68 |
2 | Demolition of lightweight cementitious fills, per inch of depth | SF | $ 0.48 |
3 | Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1” thick, R-6.6, applied Type IV asphalt | ||
3a | Hot applications | SF | $ 0.48 |
3b | Cold applications | SF | $ 1.45 |
4 | Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1 1/2” thick, R-10.0, applied Type IV asphalt | ||
4a | Hot applications | SF | $ 1.33 |
4b | Cold applications | SF | $ 1.96 |
5 | Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets, 1” thick, R-6.6, mechanically fastened | SF | $ 0.38 |
6 | Roof deck insulation, Isocyanurate in 4’ x 4’ or 4’ x 8’ sheets with fiberglass facers, 1 1/2” thick, R-10.0, mechanically fastened | SF | $ 0.79 |
7 | Roof deck insulation, fiberboard in 4’ x 4’ sheets, 1/2” thick, R-1.39, applied Type IV asphalt | ||
7a | Hot applications | SF | $ 1.25 |
7b | Cold applications | SF | $ 1.42 |
8 | Roof deck insulation, fiberboard in 4’ x 8’ sheets, 25/32” thick, R-2.4, installed hot/cold or mechanically attached coated six sides | ||
8a | Hot applications | SF | $ 0.84 |
8b | Cold applications | SF | $ 0.90 |
8c | Mechanically attached | SF | $ 0.96 |
9 | Roof deck insulation, fiberboard in 4’ x 4’, 1” thick, R-2.78, applied Type IV asphalt (or appropriate asphalt), coated six sides | ||
9a | Hot applications | SF | $ 0.50 |
9b | Cold applications | SF | $ 1.03 |
10 | Roof deck insulation, fiberboard in 4' x 4' sheets, 1/2” thick, R-1.39, mechanically fastened, coated six sides | SF | $ 0.55 |
11 | Roof deck insulation, fiberboard in 4’ x 4’, 1” thick, R-2.78, mechanically fastened, coated six sides | SF | $ 0.34 |
12 | Roof deck insulation, lightweight cellular wire reinforced concrete fill, R- value depending on thickness, per inch of depth | SF | $ 0.53 |
13 | Roof deck insulation, vermiculite at 1/8:12, R-value depending on thickness, per inch of depth | SF | $ 1.32 |
14 | Roof deck insulation, vermiculite at 1/4:12, R-value depending on thickness, per inch of depth | SF | $ 1.49 |
15 | Roof deck insulation, gypsum panels, 3” thick | SF | $ 2.40 |
16 | Roof deck insulation, Isocyanurate (black facer only), tapered, 1/8” per foot slope, Type IV asphalt, per inch of depth | SF | $ 0.66 |
17 | Roof deck insulation, Isocyanurate (black facer only), tapered, 1/4” per foot slope, Type IV asphalt, per inch of depth | SF | $ 1.03 |
18 | Cold insulation adhesive | SF | $ 1.26 |
19 | CDX Gypsum, 1/4" x 4' x 8' | ||
19a | Mechanically attached | SF | $ 1.08 |
19b | Set into adhesive | SF | $ 1.72 |
20 | CDX Gypsum, 1/2" x 4' x 8' | ||
20a | Mechanically attached | SF | $ 1.43 |
20b | Set into adhesive | SF | $ 2.11 |
21 | CDX Gypsum with fiberglass, facer: 1/4" x 4' x 8' | ||
21a | Mechanically attached | SF | $ 1.43 |
21b | Set into adhesive | SF | $ 2.09 |
22 | CDX Gypsum with fiberglass facer: 1/2” x 4’ x 8’ | ||
22a | Mechanically attached | SF | $ 1.66 |
22b | Set into adhesive | SF | $ 2.36 |
Roof Tiles and Shingles | |||
1 | Remove composition shingles and felts to decking | SF | $ 1.12 |
2 | Test for asbestos prior to removal | SF | $ 0.01 |
3 | Remove clay, concrete, or slate roof tiles to decking | SF | $ 0.84 |
4 | Remove wood shingles and felts to decking | SF | $ 0.31 |
5 | Shingles, fiberglass, Class A, 25-year strip shingles, slopes 3:12 or greater | SF | $ 1.49 |
6 | Shingles, fiberglass, Class A, 30-year, premium laminated multilayered | SF | $ 2.34 |
7a | Replace clay or concrete roof tiles | Each | $ 4.08 |
7b | Replace/repair other shingles | Each | $ 9.67 |
8 | Self-adhering ice and water shield membrane for shingles, tiles, metal waterways, penetrations, valleys, ridges, edges, etc. | SF | $ 2.45 |
Roofing and Roof Restoration | |||
1 | Remove built-up roof, multi-ply aggregate, non-asbestos, 1" thick or less | SF | $ 1.12 |
2 | Remove single-ply roof: ballast, and membrane only | SF | $ 1.34 |
3 | Remove single-ply roof, membrane partially or fully adhered | SF | $ 1.34 |
4 | Remove single-ply roof, membrane mechanically attached | SF | $ 1.39 |
5 | Remove copper sheet roofing | SF | $ 0.32 |
6 | Base sheet, 3-ply fiberglass, Type IV (or appropriate type) asphalt (17 year roof) | SF | $ 1.74 |
7 | Base sheet, 4-ply fiberglass, mechanically attached (17-year roof) | SF | $ 1.25 |
8 | Fiberglass cap finishing membrane | SF | $ 0.43 |
9 | Base sheet with 2 ply, fiberglass felts, Type IV asphalt (or appropriate type) | SF | $ 1.62 |
10 | Base sheet with 3 ply, fiberglass felts, Type IV asphalt (or appropriate type) | SF | $ 2.06 |
11 | Base sheet mechanically attached with 4 ply, Type VI fiberglass felts, Type IV (or appropriate type) asphalt | SF | $ 1.40 |
12 | Nail base sheet, 3 ply Type VI fiberglass felts, fiberglass cap, Type IV (or appropriate type) asphalt. | SF | $ 1.45 |
13 | Base sheet with 4 ply; 2 polyester and 2 fiberglass felts, Type IV (or appropriate type) asphalt (20 year roof) | SF | $ 1.66 |
14 | Built-up roof, base sheet with 3 ply polyester roofing sheet, Type IV (or appropriate type) asphalt (20 year roof) | SF | $ 1.25 |
15 | Built-up roof, base sheet with 3 ply Type G2 fiberglass, cold process adhesive (20 year roof) | SF | $ 3.18 |
16 | Built-up roof base sheet plus 4 ply Type G2 fiberglass, cold process adhesive (30 year roof) | SF | $ 2.16 |
17 | Built-up roof, base sheet, 1 ply Type VI fiberglass, 1 ply modified bitumen sheet, fire rated, Type IV asphalt (15 year roof) | SF | $ 3.13 |
18 | Built-up roof, base sheet, 2 ply polyester roofing sheet, 1 ply modified bitumen sheet, fire rated, Type IV asphalt (or appropriate type) (20 year roof) | SF | $ 2.40 |
19 | Built-up roof, base sheet, G-2, 33 lb., mechanically attached | SF | $ 0.74 |
20 | Built-up roof, base sheet, G-2, 33 lb., Type IV asphalt | SF | $ 0.84 |
21 | Built-up roof, premium asphalt, added cost per ply per square foot | SF | $ 0.13 |
22 | Built-up roof, modified bitumen adhesive, added cost per ply per square foot | SF | $ 0.28 |
23 | Built-up roof, surface with cold asphaltic surfacing adhesive and gravel | SF | $ 3.06 |
24 | Built-up roof, surface with emulsion and granules | SF | $ 0.98 |
25 | Built-up roof, surface with emulsion and aluminum coating | SF | $ 1.24 |
26 | Built-up roof, surface with emulsion and white elastomeric coating | SF | $ 1.30 |
27 | Built-up roof, surface with aluminum coating or paint | SF | $ 1.94 |
28 | Built-up roofing, surface with high solids white elastomeric coating | SF | $ 2.40 |
29 | Built-up roofing repairs; fibered asphalt mastic, brush grade, with fiberglass mesh. | SF | $ 2.46 |
30 | Built-up roofing repairs; pitch-based mastic, with fiberglass mesh | SF | $ 2.14 |
31 | Built-up roofing repairs; elastomeric mastic, with fiberglass mesh | SF | $ 3.36 |
32 | Built-up roofing restoration, coal tar pitch roofs | SF | $ 2.15 |
33 | Built-up roofing restoration, odorless, coal tar pitch or asphalt roofs | SF | $ 1.88 |
34 | Single-ply roof, CSPE, 45 mils reinforced, asbestos free, mechanically fastened | SF | $ 1.80 |
35 | Single-ply roof, CSPE, 60 mils reinforced, asbestos free, mechanically fastened | SF | $ 1.92 |
36 | Single-ply roofing repairs (CSPE, PVC, and EPDM) | ||
36a | CSPE | SF | $ 1.68 |
36b | PVC | SF | $ 2.10 |
36c | EPDM | SF | $ 1.85 |
37 | Flashing membrane, 2 ply, Type IV or Type VI fiberglass | SF | $ 1.79 |
38 | Flashing membrane, 1 ply polyester and 1 ply modified bitumen | SF | $ 2.86 |
39 | Flashing membrane, 2 ply, polyester | SF | $ 1.99 |
40 | Flashing membrane, CSPE | SF | $ 5.84 |
41 | Flashing membrane, CSPE with aluminum coating | SF | $ 9.20 |
42 | Polyurethane foam roofing | SF | $ 1.34 |
43 | Additional Polyurethane foam coating | SF | $ 2.88 |
44 | Single-ply roof, EDPM, 45 mils reinforced, mechanically fastened | SF | $ 1.34 |
45 | Single-ply roof, EDPM, 60 mils fully adhered | SF | $ 3.58 |
46 | Built-up roof, base sheet with 3 ply trilaminate ply, cold process adhesive (25 year roof) | SF | $ 3.65 |
47 | Built-up roof, surface with premium asphalt, and gravel. | SF | $ 0.65 |
48 | Built-up roof, surface with Fire Retardant Aluminum coating or paint, single coat | SF | $ 0.79 |
49 | Modified Bitumen roof, base sheet, cap sheet, cold Modified Bitumen Adhesive | SF | $ 5.94 |
50 | Built-up roof, 3 ply fiberglass felts, Type IV asphalt | SF | $ 3.43 |
51 | Single ply Roof, 45 mils fully adhered with bonding adhesive | SF | $ 4.84 |
52 | Single ply roof, TPA Fleece Back, 45 mils fully adhered with hot asphalt | SF | $ 4.84 |
53 | Single ply roof, 45 mils mechanically attached | SF | $ 2.24 |
54 | Base sheet mechanically attached with 3 ply fiberglass felts, Type 1 - Coal Tar Pitch | SF | $ 1.60 |
55 | Base sheet mechanically attached with 3 ply Organic felts, Type 1 - Coal Tar Pitch | SF | $ 1.64 |
56 | Built-up roof, 4 ply Fiberglass felts, Type 1 Coal Tar Pitch | SF | $ 1.69 |
57 | Build-up roof, 4 ply Organic felts, Type 1 Coal Tar Pitch | SF | $ 1.69 |
58 | Built-up roof, surface with hot Coal Tar Pitch and gravel | SF | $ 1.19 |
59 | Single ply repairs using 2 coat polyurethane, elastomeric coating system | SF | $ 4.51 |
60 | Single ply repairs at laps or defects using 2 coats elastomeric coating system with reinforcement | SF | $ 4.84 |
61 | Single ply roof, TPA fleece back, 60 mils fully adhered with hot asphalt | SF | $ 7.10 |
62 | Single ply roof 60 mils fully adhered with bonding adhesive | SF | $ 7.10 |
63 | Built-up roof, 1 ply Trilaminate, 1 ply Modified Bitumen Sheet, fire rated | SF | $ 3.22 |
Masonry | |||
1 | Brick, remove and reset, 1 to 50 sq ft | SF | $ 20.05 |
2 | Brick, remove and reset, over 50 sq ft | SF | $ 16.21 |
3 | Block, remove and reset | SF | $ 16.90 |
4 | Coping stones, remove and reset | Each | $ 40.20 |
5 | Brick, block or coping removal | Each | $ 13.07 |
6 | Brick, block and brick exterior wall maintenance, repair and application of protective coatings. | ||
6a | Selective Demolition of Concrete Block Masonry Units (CMU) with perimeter saw cutting- swingstage 4”, 6” and 8” block (high-rise) | Each | $ 8.02 |
6b | Selective Demolition of Brick Masonry Units with perimeter saw cutting - swingstage one, two, and three wythe (high-rise) | SF | $ 28.67 |
6c | Selective Demolition of Brick Masonry Units with perimeter saw cutting - scaffolding one, two and three wythe (low-rise) | SF | $ 20.35 |
7 | Selective Demolition of Mortar Joint with Perimeter Sawcutting – Swingstage (high-rise) | ||
7a | Removal of existing mortar ( ½” wide by ¾” depth) | SF | $ 2.16 |
7b | Removal of existing mortar (¾” wide by ¾” depth) | SF | $ 2.34 |
7c | Removal of existing mortar (½” wide by 1½” depth) | SF | $ 2.57 |
7d | Removal of existing mortar (¾” wide by 1½” depth) | SF | $ 3.26 |
8 | Selective Demolition of Mortar Joint with Perimeter Sawcutting – Scaffolding (low-rise) | ||
8a | Removal of existing mortar ( ½” wide by ¾” depth) | SF | $ 4.26 |
8b | Removal of existing mortar (¾” wide by ¾” depth) | SF | $ 4.68 |
8c | Removal of existing mortar (½” wide by 1½” depth) | SF | $ 6.73 |
8d | Removal of existing mortar (¾” wide by 1½” depth) | SF | $ 7.81 |
9 | New Pointing Work – Swingstage (high- rise) | ||
9a | Furnish and install new mortar (½” wide by ¾” depth) | SF | $ 2.83 |
9b | Furnish and install new mortar (¾” wide by ¾” depth) | SF | $ 2.94 |
9c | Furnish and install new mortar (½” wide by 1 ½” depth) | SF | $ 2.51 |
9d | Furnish and install new mortar (¾” wide by 1 ½” depth) | SF | $ 3.62 |
10 | New Pointing Work – Scaffolding (low- rise) | ||
10a | Furnish and install new mortar (½” wide by ¾” depth) | SF | $ 6.80 |
10b | Furnish and install new mortar (¾” wide by ¾” depth) | SF | $ 7.66 |
10c | Furnish and install new mortar (½” wide by 1 ½” depth) | SF | $ 7.93 |
10d | Furnish and install new mortar (¾” wide by 1 ½” depth) | SF | $ 9.08 |
11 | Removal of Roof Parapets – Swingstage (high-rise) | ||
11a | Removal of 3 wythe brick parapet wall (24” high) | SF | $ 42.76 |
11b | Removal of 3 wythe brick parapet wall (42” high) | SF | $ 75.22 |
11c | Removal of 2 wythe brick parapet wall (24” high) | SF | $ 35.82 |
11d | Removal of 3 wythe brick parapet wall (42” high) | SF | $ 65.84 |
12 | Removal of Roof Parapets – Scaffolding (low-rise) | ||
12a | Removal of 3 wythe brick parapet wall (24” high) | SF | $ 82.52 |
12b | Removal of 3 wythe brick parapet wall (42” high) | SF | $ 148.50 |
12c | Removal of 2 wythe brick parapet wall (24” high) | SF | $ 69.31 |
12d | Removal of 3 wythe brick parapet wall (42” high) | SF | $ 138.60 |
13 | Reconstruction of Brick Masonry Roof Parapets – Swingstage (high-rise) | ||
13a | New brick masonry parapet w/stone coping and flashings (3 wythe - 24” high) | SF | $ 126.38 |
13b | New brick masonry parapet w/stone coping and flashings (3 wythe - 42” high) | SF | $ 159.62 |
13c | New brick masonry parapet w/stone coping and flashings (2 wythe - 24” high) | SF | $ 93.83 |
13d | New brick masonry parapet w/stone coping and flashings (2 wythe - 42” high) | SF | $ 116.80 |
14 | Reconstruction of Brick Masonry Roof Parapets – Scaffolding (low-rise) | ||
14a | New brick masonry parapet w/stone coping and flashings (3 wythe - 24” high) | SF | $ 230.99 |
14b | b) New brick masonry parapet w/stone coping and flashings (3 wythe - 42” high) | SF | $ 313.49 |
14c | c) New brick masonry parapet w/stone coping and flashings (2 wythe - 24” high) | SF | $ 165.00 |
14d | d) New brick masonry parapet w/stone coping and flashings (2 wythe - 42” high) | SF | $ 241.48 |
15 | New Throughwall Flashings – Swingstage (high-rise) | ||
15a | Removal of 4 courses 1 wythe brick wall w/Temporary Shoring | SF | $ 44.50 |
15b | Removal and replacement of steel lintel | SF | $ 22.46 |
15c | Furnish and install new flashings (Bituthane) | SF | $ 7.03 |
15d | Furnish and install new flashings (Lead coated copper) | SF | $ 12.65 |
15e | Parging and waterproofing of back-up wall | SF | $ 9.84 |
16 | New Throughwall Flashings – Scaffolding (low-rise) | ||
16a | Removal of 4 courses 1 wythe brick wall w/Temporary Shoring | SF | $ 35.84 |
16b | Removal and replacement of steel lintel | SF | $ 42.08 |
16c | Furnish and install new flashings (Bituthane) | SF | $ 11.26 |
16d | Furnish and install new flashings (Lead coated copper) | SF | $ 22.45 |
16e | Parging and waterproofing of back-up wall | SF | $ 15.73 |
17 | Brick Masonry/Stone Stabilization | ||
17a | Drilling and installation of new friction pins with mortar cap | SF | $ 11.57 |
17b | Drilling and installation of new friction pins for lime stone with mortar cap | SF | $ 11.57 |
18 | Limestone Removal and Replacement. | ||
18a | Removal of existing deteriorated architectural limestone | SF | $ 28.90 |
18b | Furnish and install new limestone replacement. | SF | $ 83.29 |
18c | Replacement of stone with lightweight polymer resin to match | SF | $ 16.78 |
18d | Minor patching of existing stone to match | SF | $ 35.27 |
19 | Terra Cotta Removal and Replacement. | ||
19a | Removal of existing deteriorated architectural Terra Cotta | SF | $ 57.78 |
19b | Furnish and install new Terra Cotta replacement. | SF | $ 184.80 |
19c | Replacement of stone with lightweight polymer resin to match | SF | $ 67.00 |
19d | Minor patching of existing stone to match | SF | $ 106.80 |
20 | Roof Coping Stones. | ||
20a | Removal of existing roof coping stones (16 inches) | SF | $ 27.25 |
20b | Removal and parging of existing substrate | SF | $ 4.51 |
20c | Furnish and install new lead coated copper flashings | SF | $ 18.49 |
20d | Drilling and epoxy grouting stainless steel pins | SF | $ 5.58 |
20e | Reinstallation of existing stones with cleaning | SF | $ 16.73 |
20f | Furnish and install new coping stones | SF | $ 38.02 |
20g | Furnish and install new sealants between coping stones. | SF | $ 5.87 |
20h | Cleaning and coating of existing stones. | SF | $ 4.36 |
21 | CMU Backup Wall Repair and Waterproofing. | ||
21a | Replacement of Deteriorated CMU Back-up | SF | $ 13.12 |
21b | Parging of CMU back-up wall | SF | $ 3.31 |
21c | Waterproofing of back-up wall | SF | $ 1.87 |
22 | Brick Masonry Piers | ||
22a | Isolated repair of existing masonry piers (removal and replacement) | SF | $ 26.00 |
22b | Reconstruction of isolated areas of pier | SF | $ 23.45 |
22c | Construction of new masonry piers. | SF | $ 18.78 |
23 | Crack Repair | ||
23a | Drill and install new stainless steel pins. | Each | $ 7.22 |
23b | Grouting of open cracks | SF | $ 4.98 |
23c | Replacement of cracked bricks | SF | $ 9.92 |
24 | Concrete Removal | ||
24a | Perimeter sawcutting | SF | $ 1.06 |
24b | Removal of existing concrete (2” depth). | SF | $ 4.87 |
24c | Removal of existing concrete (3.5” depth). | SF | $ 6.26 |
25 | New Concrete and Coating | ||
25a | Placement of new high strength patching mortar (2” depth) | SF | $ 17.34 |
25b | Placement of new high strength patching mortar (3.5” depth). | SF | $ 19.43 |
25c | Cleaning and coating of concrete surface. | SF | $ 5.57 |
25d | Sidewalk Bridging. | SF | $ 21.66 |
25e | Temporary Roof Protection | SF | $ 1.79 |
26 | Metal Work | ||
26a | Remove standard metal decking | SF | $ 3.00 |
26b | Install metal decking; 1-1/2" deep, 20 gauge, standard profile | SF | $ 5.39 |
27 | Install steel plate, two sizes | SF | $ 4.61 |
27a | 10 Gauge, standard application | SF | $ 4.34 |
27b | Extra heavy-duty 1/4th inch | SF | $ 2.36 |
28 | Remove metal counterflashing | LF | $ 2.26 |
28a | Counterflashing, galvanized, 24 gauge, 6" width | LF | $ 4.36 |
28b | Counterflashing, copper, 16 oz., 6" width | LF | $ 3.37 |
29 | Remove metal edge, gravel stop, eave strip, or coping | LF | $ 1.88 |
29a | Metal edge raised, galvanized steel fascia/eave drip; 6" face, hemmed, continuous cleat, 3" deck flange | LF | $ 6.20 |
29b | Gravel stop, galvanized steel, 24 gauge, 6" face | LF | $ 7.04 |
30 | Remove metal gutter | LF | $ 3.35 |
30a | Gutter, galvanized steel, ASTM 526, with 12.5oz./square foot galvanized coating, 24 gauge, 5" box or ogee style, joints and end caps shall be soldered | LF | $ 19.20 |
30b | Gutter, aluminum, .050" thick 5" box or ogee, painted, Kynar finish | LF | $ 25.38 |
30c | Gutter, copper, 16 oz, half round, 5" wide | LF | $ 8.83 |
30d | Gutter, copper, 16 oz, half round, 6" wide | LF | $ 10.37 |
31 | Remove metal downspouts | LF | $ 2.42 |
31a | Downspouts, aluminum, .024" thick, 3" x 4", painted, installed | LF | $ 18.78 |
31b | Downspouts, GI, 24 gauge 3" x 4" installed | LF | $ 24.35 |
31c | Downspouts, GI, 24 gauge, 4" round, installed | LF | $ 18.54 |
31d | Downspouts, copper, 16 oz., 6" round, installed | LF | $ 19.39 |
31e | Downspouts, strainer | Each | $ 6.55 |
31f | Metal flashing, apron flashing, 9" wide | LF | $ 4.99 |
31g | Metal flashing, step flashing | Each | $ 9.12 |
31h | Metal splash pan, 16 oz. | Each | $ 19.26 |
31i | Metal trim, aluminum, .032" thick, painted | SF | $ 4.09 |
31j | Metal storm collar | Each | $ 33.14 |
31k | Metal coping, galvanized steel, 24 gauge, standing seam | SF | $ 15.90 |
31l | Metal coping, galvanized steel, 24 gauge, with butt plate | SF | $ 14.52 |
31m | Resolder joints in sheet metal | LF | $ 3.26 |
31n | Metal edge, aluminum, 0.50 thick 6" face painted | SF | $ 17.10 |
31n | Metal edge, aluminum, free floating fascia system | SF | $ 23.70 |
31o | Parapet wall metal | SF | $ 12.17 |
31p | Metal edge, anodized finished aluminum, free floating fascia system 8 inches | SF | $ 42.48 |
31q | Metal edge, high performance fluorocarbon finished aluminum, free floating fascia system 8 inches | SF | $ 19.24 |
31r | Metal edge, anodized finished aluminum, free floating fascia system 6 inches | SF | $ 17.10 |
31s | Metal edge, high performance fluorocarbon finished aluminum, free floating fascia system 6 inches | SF | $ 14.98 |
32 | New Aluminum Metal Cladding | ||
32a | Furnish and install new uninsulated aluminum wall cladding | SF | $ 18.78 |
32b | Furnish and install new insulated aluminum wall cladding | SF | $ 41.32 |
32c | Furnish and install new insulated aluminum wall cladding panels (Architecture | SF | $ 56.32 |
32d | Cladding of roof parapet walls with copings. | SF | $ 37.82 |
33 | New Exterior Insulation and Finish System (EIFS) | ||
33a | New Exterior Insulation and Finish System (EIFS) | SF | $ 26.28 |
33b | New Exterior Insulation Finish System (EIFS) w/o insulation | SF | $ 16.22 |
33c | New Metal Copings. | SF | $ 14.23 |
34 | Surface Preparation | ||
34a | Cleaning of existing steel and surface. | SF | $ 15.04 |
34b | Coating of existing reinforcement | SF | $ 18.78 |
34c | Exterior rated gypsum board sheathing and substrate | SF | $ 3.26 |
35 | Woodwork | ||
35a | Demolition of plywood or standard 1” x 6” decking | SF | $ 1.19 |
35b | Demolition of standard 2” x 6” tongue and groove decking | SF | $ 1.26 |
35c | Plywood decking, CDX, 1/2” thick (or 15/32" optional) | SF | $ 2.66 |
35d | Plywood decking, CDX, 5/8” thick | SF | $ 2.64 |
35e | Plywood decking, CDX, 3/4” thick | SF | $ 2.51 |
35f | Standard 1” x 6” decking, tongue and groove | SF | $ 2.23 |
35g | Standard 2” x 6” tongue and groove decking | SF | $ 4.20 |
35h | Cants, wood fiber, trapezoidal, 1 1/2” x 5 5/8” | LF | $ 0.76 |
35i | Cants, SBX treated wood, 4” x 4” diagonal | LF | $ 2.59 |
35j | Nailer, SBX treated wood, 1” x 4” | LF | $ 1.12 |
35k | Nailer, SBX treated wood, 2” x 4” | LF | $ 1.63 |
36 | Nailer, SBX treated wood | ||
36a | 2" x 6" | LF | $ 2.41 |
36b | 2" x 8" optional | LF | $ 2.54 |
36c | Curbing, SBX treated wood, 2” x 12” | LF | $ 4.39 |
37 | Joist, fir | ||
37a | 2” x 6” | LF | $ 4.33 |
37b | 2" x 8" optional | LF | $ 4.76 |
38 | Joist, fir | ||
38a | 2" x 10" | LF | $ 4.92 |
38b | 2" x 12" optional | LF | $ 5.83 |
39 | Standing Seam Metal Roof System (SSMRS) Price Each Specification Using Line Items | ||
39a | Pre-Engineered SSMRS, products (20- year roof) | SF | $ 7.66 |
39b | Subpurlins | LF | $ 6.73 |
39c | Roof panel installation | SF | $ 6.38 |
39d | Field forming of panels | SF | $ 3.95 |
39e | Concealed anchor clips | Each | $ 2.00 |
39f | Vapor retarder installation | SF | $ 1.62 |
39g | Insulation installation | SF | $ 4.49 |
39h | Gutters (SSMRS only) | LF | $ 21.62 |
39i | Gutter liners | SF | $ 13.09 |
39j | Flashing | LF | $ 10.50 |
39k | Expansion joints | LF | $ 25.39 |
40 | Finishing touches (no additional cost in contract) | ||
40a | Snow retention assemblies | LF | $ 1.40 |
40b | Self-adhering ice and water shield membrane for shingles, tiles, metal waterways, penetrations, valleys, ridges, edges, etc. | LF | $ 2.32 |
41 | Roof Specialties and Accessories | ||
41a | Remove roof hatch | Each | $ 190.62 |
41b | Roof hatch, aluminum, 2’6” x 3’0” | Each | $ 589.97 |
41c | Roof hatch, aluminum, larger sizes | SF | $ 50.86 |
41d | Remove existing roof drain, except plumbing | Each | $ 324.91 |
41e | Install new roof 4" drain, except plumbing | Each | $ 1,516.76 |
41f | Install new roof 6" drain, except plumbing | Each | $ 1,516.76 |
41g | Reflash existing roof drain | Each | $ 199.85 |
41h | Plumbing stack, 4# lead flashing | Each | $ 87.86 |
41i | Scupper, sheet steel, 24 gauge ASTM A 526, match existing configuration | Each | $ 148.88 |
41j | Remove existing walkway, built-up roofs | SF | $ 0.54 |
41k | Walkway, built-up roofs, desert tan fiberglass | LF | $ 1.56 |
41L | Walkway, built up roofs, non skid | LF | $ 4.40 |
42 | Walkway, single ply roof | ||
42a | 30" wide roll goods, tape attached | LF | $ 3.24 |
42b | 30" wide roll, hot asphalt attached | LF | $ 3.74 |
42c | 30" wide roll, adhesive attached | LF | $ 3.77 |
42d | Roof ventilators | Each | $ 151.34 | |
42e | Roof ladder, steel, bolted to concrete, up to 20 feet, without cage | LF | $ 83.33 | |
42f | Roof ladder, steel, bolted to concrete, 20 feet and up, with cage; with intermediate landings as required by Code | LF | $ 103.02 | |
42g | Roof ladder, security ladder guard | Each | $ 130.73 | |
42h | Termination bar, aluminum, 1/4” x 1” | LF | $ 3.29 | |
42i | Pitch pocket, 24 gauge, GI, 6” x 6”, with storm collar hemmed to outside, soldered corners and seams | Each | $ 131.82 | |
42j | Pitch pocket, 24 gauge, GI, 8” x 8”, with storm collar, hemmed to outside, soldered corners and seams | Each | $ 144.19 | |
43 | Pitch pocket, resurface top only | |||
43a | 8" x 8" | Each | $ 16.93 | |
43b | 12" x 12" | Each | $ 19.90 | |
43c | Expansion joint, butyl or neoprene bellows, galvanized flange | LF | $ 3.58 | |
43d | Expansion joint, CSPE reinforced | LF | $ 20.30 | |
43e | Repair kit for dry repairs | Each | $ 105.23 | |
43f | Repair kit for wet repairs | Each | $ 98.80 | |
44 | Skylights (price each size and lens combination) | |||
44a | Standard 3' x 5', 4' x 4', 4' x 8' with single clear lenses | SF | $ 18.42 | |
44b | Standard 3' x 5', 4' x 4', 4' x 8' with clear double lenses | SF | $ 32.58 | |
44c | Skylight lens replacement only, clear | SF | $ 12.46 | |
44d | Skylight lens replacement only, double clear | SF | $ 19.49 | |
45 | Security/fall bars for skylights | |||
45a | 3' x 5' | Each | $ 403.55 | |
45b | 4' x 4' | Each | $ 402.58 | |
45c | 4' x 8' | Each | $ 586.96 | |
45d | Special sizes | SF | $ 23.51 | |
46 | Roof Services | |||
46a | Asbestos core testing and patch of existing roof surface | Each | $ 90.34 | |
46b | Core analysis, 14” x 14” and patch of existing roof surface | Each | $ 393.91 | |
46c | Non destructive roof scan, up to 50,000 sq ft, full service each | Each | $ 3,236.75 | |
46d | Additional foot over 50,000 sq ft | SF | $ 0.04 | |
46e | Non destructive roof scan, up to 50,000 sq ft, limited service | Each | $ 2,634.19 | |
46f | Additional foot over 50,000 sq ft | Each | $ 0.05 | |
46g | Roof inspection services (visual inspection of roofing service/membrane, flashings, counterflashings, copings, parapets, trims, hatches, penetrations, curbs, roof-mounted equipment, etc. with a written report of findings and recommendations | Day | $ 918.18 | |
46h | Field/shop drawings, up to 10,000 sq ft | SF | $ 0.07 | |
46i | Field/shop drawings, 10,000-50,000 sq ft | SF | $ 0.07 | |
46j | Field/shop drawings, over 50,000 sq ft | SF | $ 0.07 | |
46k | Prime contractor’s warranty, restoration, less than 10,000 sq ft, minimum charge | Project | $ 500.00 | |
46l | Prime contractor’s warranty, restoration, over 10,000 sq ft, minimum charge | Project | $ 0.05 | |
46m | Prime contractor’s warranty, re-roof, total system, 15 year, less than 10,000 sq ft, minimum charge (Standard) | Project | $ 1,200.00 | |
46n | Prime contractor’s warranty, re-roof, total system, 15 year, less than 10,000 sq ft, minimum charge (includes 2, 5, 7, 10, 15 year inspections) | Project | $ 1,500.00 | |
46o | Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq ft, minimum charge (Standard) | Project | $ 0.12 | |
46p | Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq ft, minimum charge (includes 2, 5, 7, 10, 15 year inspections) | Project | $ 0.15 | |
46q | Per diem rate per worker per 24 hour period of time | Day | $ 54.70 | |
46r | Prime contractors per diem/costs for asbestos abatement planning | Day | $ 57.22 | |
46s | Asbestos abatement activities, BUR removal and disposal of waste | SF | $ 1.79 | |
46t | Project site is located 65 or more miles from the contractor's/subcontractor's yard/home location. | SF | $ 2.03 | |
46u | Asbestos site monitoring | Day | $ 514.88 | |
47 | Annual or semi-annual roof housekeeping-per location | |||
47a | Cost once a year per location if less than 20,000 sq. ft. | SF | $ 0.14 | |
47b | Cost per Sq.ft. per year per location if greater than 20,000 sq.ft. | SF | $ 0.14 | |
47c | Cost semi-annual per location if less than 20,000 sq. ft | SF | $ 0.23 | |
47d | Cost per Sq.ft. semi annual per location if greater than 20,000 sq.ft. | SF | $ 0.23 | |
47e | Roof leak investigation | Day | $ 543.46 | |
47f | Minor roof repair calls | Day | $ 918.92 | |
47g | Difficult access or fall restriction; surcharge | % | 15.00% | |
47h | Excessive hauling | Each | $ 157.37 | |
47i | Work in secured areas or compounds; surcharge | % | 15.00% | |
48 | Additional and occasional supplies, materials, equipment and services | |||
48a | Additional and occasional services Roofing supplies Discount off Retail Price List | % | 13.30% |
48b | Alternative Methods of Costing - percent of overhead/markup and profit added to cost | % | 20.00% |
48c | Discounts Offered Off Alternative Costing Methods (cost plus profit and overhead) Less Rate of Discount | % | 6.00% |
48d | Multiplier/factor to be applied to the R.S. Means costs. | % | 93.00% |
49 | Deducts and add-ons for in lieu products (Place behind Tab 6) | ||
50 | Special Rental Equipment (Priced based on RS Means line 48d) | ||
51 | Cold and bad weather storage identify extra cost if any | Day | QUOTE |
52 | Hourly Services Rates | ||
53 | Structural Analysis/engineering services | Hour | $ 199.60 |
54 | Architect/design professional services | Hour | $ 140.52 |
55 | Roofing Consultant | Hour | $ 105.40 |
56 | Labor Rate for Roofer | Hour | $ 166.33 |
57 | General Cost Factors | ||
57a | Mileage rate | Mile | $ 0.655 |
57b | Performance and payment bond - bonding rate (percent of project) | % | 0.40% |
57c | Bonding capacity - total amount of capacity available | $ | $ 200,000.00 |
Solar Panels System | |||
58a | Installed Photovoltaic Panels & Systems | Watt | QUOTE |
58b | Solar finance based on individual state, renewable energy, certificates | Each | QUOTE |
58c | Photovoltaic module, 6 watt, 15 V | Each | $ 196.09 |
58d | Photovoltaic module, 10 watt, 16.3 V | Each | $ 281.39 |
58e | Photovoltaic module, 20 watt, 14.5 V | Each | $ 244.48 |
58f | Photovoltaic module, 36 watt, 17 V | Each | $ 381.97 |
58g | Photovoltaic module, 55 watt, 17 V | Each | $ 309.41 |
58h | Photovoltaic module, 75 watt, 17 V | Each | $ 741.02 |
58i | Photovoltaic module, 130 watt, 33 V | Each | $ 702.95 |
58j | Photovoltaic module, 140 watt, 33 V | Each | $ 830.15 |
58k | Photovoltaic module, 150 watt, 24V | Each | $ 454.55 |
58l | Photovoltaic module, 300 watt, 37 V | Each | $ 388.34 |
58m | Photovoltaic module, 350 watt, 37 V | Each | $ 473.65 |
58n | Photovoltaic module, 400. watt, 37 V | Each | $ 499.12 |
58o | Photovoltaic module, 450. watt, 37 V | Each | $ 550.04 |
58p | DC to AC inverter, 12 V 2,000 watt | Each | $ 2,481.50 |
58q | DC to AC inverter, 12 V 2,500 watt | Each | $ 1,908.56 |
58r | DC to AC inverter, 24 V 2,500 watt | Each | $ 2,672.48 |
58s | DC to AC inverter, 12 V 3,000 watt | Each | $ 2,204.76 |
58t | DC to AC inverter, 24 V 3,000 watt | Each | $ 2,045.62 |
58u | DC to AC inverter, 24 V 4,000 watt | Each | $ 2,512.09 |
58v | DC to AC inverter, 48 V 4,000 watt | Each | $ 5,058.49 |
58w | DC to AC inverter, 48 V, 5,500 watt | Each | $ 4,549.21 |
58x | Photovoltaic components, combiner box, 10 lug, NEMA 3R enclosure | Each | $ 660.83 |
58y | Photovoltaic components, fuse, 15 A for combiner box | Each | $ 82.63 |
58z | Photovoltaic components, battery charger controller, w/temperature sensor | Each | $ 870.90 |
58aa | Photovoltaic components, digital readout panel, displays hours, volts, amps etc. | Each | $ 453.29 |
58ab | Photovoltaic components, deep cycle solar battery, 6 V, 180 Ah (C/20) | Each | $ 620.06 |
58ac | Photovoltaic components, battery interconnection, 15" AWG #2/0, sealed with copper ring lugs | Each | $ 89.14 |
58ad | Photovoltaic components, battery interconnection, 24" AWG #2/0, sealed with copper ring lugs | Each | $ 94.22 |
58ae | Photovoltaic components, battery interconnection, 60" AWG #2/0, sealed with copper ring lugs | Each | $ 127.33 |
58af | Photovoltaic components, batt temprature computer probe RJ11 | Each | $ 87.86 |
58ag | Photovoltaic components, DC circuit breaker, 175 amp | Each | $ 283.94 |
58ah | Photovoltaic components, conduit box for inverter | Each | $ 193.55 |
58ai | Photovoltaic components, low voltage disconnect | Each | $ 588.24 |
58aj | Photovoltaic components, vented battery enclosure, wood | Each | $ 800.98 |
58ak | PV rack system, roof, non-penetrating ballast, 1 panel | Each | $ 115.01 |
58al | PV rack system, roof, penetrating surface mount, on steel framing, 1 panel | Each | $ 351.68 |
58am | PV rack system, roof, penetrating surface mount, on wood framing, 1 panel | Each | $ 190.61 |
58an | PV rack system, roof, penetrating surface mount, on wood framing, with standoff, 1 panel | Each | $ 197.60 |
58ao | PV rack system, ground, ballast, fixed, 3 panel | Each | $ 612.29 |
58ap | PV rack system, ground, ballast, fixed, 4 panel | Each | $ 2,305.64 |
58aq | PV rack system, ground, ballast, fixed, 5 panel | Each | $ 3,037.74 |
58ar | PV rack system, ground, ballast, fixed, 6 panel | Each | $ 3,483.36 |
58as | PV rack system, ground, adjustable, 3 panel | Each | $ 1,796.36 |
58at | PV rack system, ground, adjustable, 4 panel | Each | $ 2,464.80 |
58au | PV rack system, ground, adjustable, 5 panel | Each | $ 3,228.72 |
58av | PV rack system, ground, adjustable, 6 panel | Each | $ 3,674.34 |
58aw | PV rack system, ground, top of pole, passive tracking, 1 panel | Each | $ 637.75 |
58ax | PV rack system, ground, top of pole, passive tracking, 2 panel | Each | $ 707.78 |
58ay | PV rack system, ground, top of pole, passive tracking, 3 panel | Each | $ 886.03 |
58az | PV rack system, ground, top of pole, passive tracking, 4 panel | Each | $ 1,732.70 |
58ba | PV rack system, ground, top of pole, passive tracking, 6 panel | Each | $ 2,592.12 |
58bb | PV rack system, ground, top of pole, passive tracking, 8 panel | Each | $ 3,419.70 |
58bc | Photovoltaic module, thin film | Each | $ 244.48 |
58bd | Photovoltaic module, cadium telluride | Each | $ 309.41 |
58be | Photovoltaic module, polycrystalline | Each | $ 244.48 |
58bf | Photovoltaic module, monocrystalline | Each | $ 702.83 |
VALUE ADD | |||
Restoration Warranties | |||
VA1 | Prime contractor’s warranty, restoration, over 10,000 sq. ft., minimum charge | Each | $ 0.08 |
VA2 | 10 year Restoration Warranty Under 10,000 Square Feet, Inspections in Years 2 & 5 | Each | $ 2,000.00 |
VA3 | 10 year Restoration Warranty Over 10,000 Square Feet, Inspections in Years 2 & 5 | Each | $ 0.20 |
VA4 | 10 year Restoration Warranty Under 10,000 Square Feet, Standard | Each | $ 800.00 |
VA5 | 10 year Restoration Warranty Over 10,000 Square Feet, Standard | Each | $ 0.08 |
VA6 | 12 Year Restoration Warranty Under 10,000 Square Feet, Inspections In Years 2, 5 & 10 | Each | $ 2,400.00 |
VA7 | 12 Year Restoration Warranty Over 10,000 Square Feet Inspections In Years 2, 5 & 10 | SF | $ 0.24 |
VA8 | 12 Year Restoration Warranty Under 10,000 Square Feet, Standard | Each | $ 1,000.00 |
VA9 | 12 Year Restoration Warranty Over 10,000 Square Feet, Standard | SF | $ 0.10 |
VA10 | 15 year Restoration Warranty Under 10,000 Square Feet, Standard | Each | $ 1,200.00 |
VA11 | 15 year Restoration Warranty Over 10,000 Square Feet, Standard | Each | $ 0.12 |
VA12 | 20 Restoration Warranty Under 10,000 Square Feet Inspections In Years 2, 5, 10 & 15 | Each | $ 4,000.00 |
VA13 | 20 Restoration Warranty Over 10,000 Square Feet Inspections In Years 2, 5, 10 & 15 | SF | $ 0.40 |
VA14 | 20 Restoration Warranty Under 10,000 Square Feet, Standard | Each | $ 1,600.00 |
VA15 | 20 Restoration Warranty Over 10,000 Square Feet, Standard | SF | $ 0.16 |
VA16 | 30 Restoration Warranty Under 10,000 Square Feet Inspections In Years 2, 5, 10, 15, 20 & 25 | Each | $ 6,000.00 |
VA17 | 30 Restoration Warranty Over 10,000 Square Feet Inspections In Years 2, 5, 10, 15, 20 & 25 | SF | $ 0.60 |
VA18 | 30 Restoration Warranty Under 10,000 Square Feet, Standard | Each | $ 2,400.00 |
VA19 | 30 Restoration Warranty Over 10,000 Square Feet, Standard | SF | $ 0.24 |
Replacement Warranties | |||
VA20 | Prime contractor’s warranty, reroof, total system, 10 year, less than 10,000 square feet, minimum charge | Each | $ 1,000.00 |
VA21 | Prime contractor’s warranty, reroof, total system, 10 year, more than 10,000 square feet, minimum charge | SF | $ 0.15 |
VA22 | Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq. ft., minimum charge (Standard) | SF | $ 0.12 |
VA23 | Prime contractor’s warranty, re-roof, total system, 15 year, more than 10,000 sq. ft., minimum charge (includes 2, 5, 7, 10, 15 year inspections) | SF | $ 0.15 |
VA24 | Warranty 20 year option roofs under 10,000 sq. ft. minimum charge | Each | $ 2,102.14 |
VA25 | Warranty 20 year option roofs over 10,000 sq. ft. | SF | $ 0.22 |
VA26 | 20 Year Replacement Warranty Under 10,000 Feet, Inspections in Year 2, 5, 10 and 15 (no maintenance) | Each | $ 1,600.00 |
VA27 | 20 Year Replacement Warranty Over 10,000 Feet, Inspections in Year 2, 5, 10 and 15 (no maintenance) | SF | $ 0.16 |
VA28 | 20 Year Replacement Warranty Under 10,000 Square Feet Inspections In Years 2, 5, 10 & 15 | Each | $ 4,000.00 |
VA29 | 20 Year Replacement Warranty Over 10,000 Square Feet Inspections In Years 2, 5, 10 & 15 | SF | $ 0.40 |
VA30 | 25 year Replacement Warranty Under 10,000 Square Feet, Standard | Each | $ 2,000.00 |
VA31 | 25 year Replacement Warranty Over 10,000 Square Feet, Standard | SF | $ 0.20 |
VA32 | 25 year Replacement Warranty Under 10,000 Square Feet, Inspections in Years 2, 5, 10, 15, 20, 25 | Each | $ 5,000.00 |
VA33 | 25 year Replacement Warranty Over 10,000 Square Feet, Inspections in Years 2, 5, 10, 15, 20, 25 | SF | $ 0.50 |
VA34 | 30 year Replacement Warranty Under 10,000 Square Feet, Inspections in Years 2, 5, 10, 15, 20, 25 & 30 | Each | $ 6,000.00 |
VA35 | 30 year Replacement Warranty Over 10,000 Square Feet, Inspections in Years 2, 5, 10, 15, 20, 25 & 30 | SF | $ 0.60 |
Warranty Extensions/Renewals | |||
VA36 | Warranty Extension 5 yr. 5,000 sf or less | Each | $ 3,500.00 |
VA37 | Warranty Renewal 5 yr. 5000 sf or less | Each | $ 3,950.00 |
VA38 | Warranty Extension 10yr 5,000 sf or less | Each | $ 6,500.00 |
VA39 | Warranty Renewal 10yr 5,000sf or less | Each | $ 7,250.00 |
VA40 | Warranty Extension 5 yr. 5001 sf -19,999 sf | Each | $ 5,000.00 |
VA41 | Warranty Renewal 5yr 5, 5001sf-1999sf | Each | $ 5,700.00 |
VA42 | Warranty Extension 10yr 5001sf-19,999sf | Each | $ 9,000.00 |
VA43 | Warranty Renewal 10yr 5001sf-19,999sf | Each | $ 10,100.00 |
VA44 | Warranty Extension 5yr 20,000sf-49,999 sf | SF | $ 0.25 |
VA45 | Warranty Renewal 5yr 20,000sf-49,999sf | SF | $ 0.30 |
VA46 | Warranty Extension 10yr 20,000sf-49,999sf | SF | $ 0.38 |
VA47 | Warranty Renewal 10 yr. 20,000sf-49,999sf | SF | $ 0.43 |
VA48 | Warranty Extension 5yr 50,000sf and greater | SF | $ 0.25 |
VA49 | Warranty Renewal 5 yr. 50,000sf and greater | SF | $ 0.25 |
VA50 | Warranty Extension 10 yr. 50,000 sf and greater | SF | $ 0.33 |
VA51 | Warranty Renewal 10 yr. 50,000sf and greater | SF | $ 0.38 |
VA52 | Warranty Extension 5yr 100,000sf and greater | SF | $ 0.15 |
VA53 | Warranty Renewal 5yr 100,000sf and greater | SF | $ 0.20 |
VA54 | Warranty Extension 10yr 100,000sf and greater | SF | $ 0.28 |
VA55 | Warranty Renewal 10yr 100,000sf and greater | SF | $ 0.33 |
VA56 | Tremco Managed Assets (TMA) | ||
VA56a | Diagnostics <10,000 SF (min per roof level) | Each | $ 993.10 |
VA56b | Diagnostics 10,001 to 30,000 SF (min per roof level) | Each | $ 993.10 |
VA56c | Diagnostics 10,001 to 30,000 SF (whichever is greater) | SF | $ 0.06 |
VA56d | Diagnostics 30,001 to 49,999 SF (min per roof level) | Each | $ 1,389.59 |
VA56e | Diagnostics 30,001 to 49,999 SF (whichever is greater) | SF | $ 0.05 |
VA56f | Diagnostics >50,000 SF | SF | $ 0.05 |
VA56g | 1 year TMA (non-renewable) | SF | $ 0.36 |
VA57 | When purchased subsequent to Diagnostics and/or 1-year Performance Warranty | ||
VA57a | Roof Repairs (min) | SF | $ 0.32 |
VA57b | Roof Repairs (max) | SF | $ 4.36 |
VA57c | Roof Restoration (min) | SF | $ 2.51 |
VA57d | Roof Restoration (max) | SF | $ 11.20 |
VA57e | Roof Replacement (min) | SF | $ 4.99 |
VA57f | Roof Replacement (max) | SF | $ 31.08 |
Additional Warranties | |||
VA58 | Extended Performance Warranty (annual) <10,000 SF (min per roof level) | Each | $ 1,257.00 |
VA59 | Extended Performance Warranty (annual) 10,001 to 30,000 SF (min per roof level) | Each | $ 1,357.55 |
VA60 | Extended Performance Warranty (annual) 10,001 to 30,000 SF (whichever is greater) | SF | $ 0.11 |
VA61 | Extended Performance Warranty (annual) 30,001 to 49,999 SF (min per roof level) | Each | $ 2,011.17 |
VA62 | Extended Performance Warranty (annual) 30,001 to 49,999 SF (whichever is greater) | SF | $ 0.10 |
VA63 | Extended Performance Warranty (annual) >50,000 SF | SF | $ 0.09 |
VA64 | Extended Performance Warranty (bi-annual) <10,000 SF (min per roof level) | Each | $ 2,141.90 |
VA65 | Extended Performance Warranty (bi-annual) 10,001 to 30,000 SF (min per roof level) | Each | $ 2,162.01 |
VA66 | Extended Performance Warranty (bi-annual) 10,001 to 30,000 SF (whichever is greater) | SF | $ 0.15 |
VA67 | Extended Performance Warranty (bi-annual) 30,001 to 49,999 SF (min per roof level) | Each | $ 4,497.99 |
VA68 | Extended Performance Warranty (bi-annual) 30,001 to 49,999 SF (whichever is greater) | SF | $ 0.12 |
VA69 | Extended Performance Warranty (bi-annual) >50,000 SF | SF | $ 0.11 |
Insulation | |||
VA70 | Roof deck insulation, Composite Wood Fiberboard/Isocyanurate in 4' x 4' or 4'x8' sheets 3.0" thick, R-19.2 installed, Hot or Cold Applications. | ||
VA70a | Hot applications, Type IV | SF | $ 1.64 |
VA70b | Cold Applications | SF | $ 2.18 |
VA71 | Roof deck insulation, Isocyanurate in 4' x 4' or 4' x 8' sheets with fiberglass facers 2.5 inches thick, R17.8 installed, hot or cold applications | ||
VA71a | Hot applications, Type IV | SF | $ 1.78 |
VA71b | Cold Applications | SF | $ 2.36 |
VA72 | Installation of new Polyisocyanurate insulation | ||
VA72a | Mechanically attached | BF | $ 1.98 |
VA72b | Hot adhered | BF | $ 1.73 |
VA72c | Cold adhered | BF | $ 2.63 |
VA73 | Removal and reuse of existing insulation | BF | $ 0.46 |
VA74 | Cementitious Wood Fiber Plank Roof Deck per inch - Install new | SF | $ 5.96 |
Roofing | |||
VA75 | Spud embedded aggregate | SF | $ 0.79 |
VA76 | Sweep loose aggregate from roof membrane | SF | $ 0.54 |
VA77 | Sweep loose aggregate, debris from Substrate | SF | $ 0.47 |
VA78 | Wet vacuum loose aggregate from roof membrane; | SF | $ 0.60 |
VA79 | prime substrate | SF | $ 0.37 |
VA80 | Base sheet mechanically attached with 4 plies, Type VI fiberglass felts, Type IV (or appropriate Type) asphalt | SF | $ 2.10 |
VA81 | Glaze coat, if required | SF | $ 0.30 |
VA82 | Trowel grade | SF | $ 4.12 |
VA83 | Brush application of restorative coating additional cost | SF | $ 2.52 |
VA84 | Built-up Roof, base sheet, 2 ply Type VI fiberglass, 1 ply modified | SF | $ 3.52 | |
VA85 | TPO 60 mil system installation | |||
VA85a | Bonding adhesive | SF | $ 5.38 | |
VA85b | Mechanically attached | SF | $ 4.51 | |
VA85c | Hot applied | SF | $ 4.90 | |
VA86 | Fire Rated Modified Bitumen Cap Sheet | SF | $ 2.45 | |
VA87 | Flashing membrane, 1 ply fiberglass and 1 ply modified bitumen fire rated | SF | $ 3.91 | |
VA88 | Built-Up Roof 3 Plies Trilaminate Sheet Cold Process Adhesive | SF | $ 3.70 | |
VA89 | Modified Cap Sheet, Fire Rated, energy star rated white acrylic coating in White Cold Adhesive | SF | $ 4.63 | |
VA90 | Built Up Roof Surface w/ Cold Process White Highly Reflective Adhesive and White Marble Gravel | SF | $ 6.56 | |
VA91 | Roof Coating - high solids, water based, heavy bodied elastomeric coating formulated with an acrylic latex polymer | SF | $ 5.05 | |
VA92 | Roof Coating - high solids, water based, heavy bodied elastomeric coating formulated with an acrylic latex polymer w/trilaminate reinforcing | SF | $ 5.63 | |
VA93 | Roof Cleaning System | SF | $ 0.44 | |
VA94 | Two component, high performance, one part moisture triggered, polyurethane coating system with fiberglass reinforcement | SF | $ 15.44 | |
VA95 | A two part, bio-based, polyurethane roof coating system | SF | $ 13.61 | |
VA96 | A two part, bio-based, polyurethane roof coating system, non reinforced | SF | $ 11.92 | |
VA97 | Two-part UV Resistant, Polyurethane Modified Methyl Methacrylate Roof Coating System | SF | $ 14.12 | |
VA98 | One Part, Silicon Roof Coating | SF | $ 9.80 | |
VA99 | Metal Restoration with Acrylic Coating | SF | $ 9.41 | |
VA100 | Metal Restoration with Aluminum Coating | SF | $ 4.93 | |
VA101 | Shingles, Fiberglass, Class A 40-Year Premium Laminated Multilayered Shingles, Slope 3:12 or Greater | SF | $ 2.47 | |
VA102 | Shingles, Fiberglass, Class A 50-Year Premium Laminated Multilayered Shingles, Slope 3:12 or Greater | SF | $ 2.78 | |
VA103 | Synthetic Underlayment | SF | $ 0.59 | |
VA104 | Ridge Vents | LF | $ 7.22 | |
VA105 | Additional cost for special projects | SF | $ 2.66 | |
VA106 | Scraping | SF | $ 0.26 | |
VA107 | Acrylic/elastomeric, UL listed, Class A, 40 DFT surfacing | SF | $ 1.75 | |
VA108 | Optional 6 mil ply (See Other Sections) | Each | $ 1.87 | |
VA109 | Membrane application | LF | $ 1.49 | |
Roofing/Building Multipliers | ||||
VA110 | Multiplier - Limited/Obstructed/Difficult Roof/Building Access | Multiplier | 1.5 | |
VA111 | Multiplier - roof/building height is greater than 2 stories; equal to or less than 5 stories | Multiplier | 1.21 | |
VA112 | Multiplier - roof/building height is greater than 5 stories; less equal to or less than 10 stories | Multiplier | 1.52 | |
VA113 | Multiplier - roof/building height is greater than 10 stories | Multiplier | 2.17 | |
VA114 | Multiplier - roof has large amount of penetrations and roof top obstructions | Multiplier | 1.73 | |
VA115 | Multiplier - roof is considered non-standard architecture or has > 4:12 slope | Multiplier | 2.17 | |
VA116 | Multiplier - roof is less than 3K SF | Multiplier | 3.03 | |
VA117 | Multiplier - roof size is greater than 3K SF; but less than 7K SF | Multiplier | 1.73 | |
VA118 | Multiplier for roofs less than 1,000 square feet | % | 30.00% | |
VA119 | Multiplier for roofs less than 5,000 square feet | % | 25.00% | |
VA120 | Multiplier for roofs less than 10,000 square feet | % | 20.00% | |
VA121 | Multiplier for roofs less than 20,000 square feet | % | 15.00% | |
VA122 | Outside major metropolitan areas | SF | $ 1.82 | |
VA123 | Multiplier - Construction Distributor Material for Repair Work | Multiplier | 1.15 | |
VA124 | Disaster Response Repairs | % | 27.00% | |
VA125 | Emergency Leak Repair per 1/2 Manday (repairs made M-F 8am-6pm 2-4 hr. response) | Each | $ 1,154.80 | |
Paving | ||||
VA126 | Install traffic grade polyurethane sealant | LF | $ 0.29 | |
VA127 | Prepare concrete by Shot blasting | SF | $ 0.26 | |
VA128 | Vertical application of penetrating sealer | SF | $ 0.49 | |
VA129 | Horizontal application of penetrating sealer | SF | $ 0.59 | |
VA130 | Horizontal Polyurethane Traffic Coating | SF | $ 2.60 | |
VA131 | Site Preparation, Earthwork | SF | $ 11.12 | |
VA132 | Install New Crushed Stone Sub-Base | SF | $ 8.76 | |
VA133 | Install Base Asphalt and Topping Asphalt Surfacing | SF | $ 4.03 | |
VA134 | Repair and Seal Existing Asphalt Surfacing | SF | $ 3.48 | |
VA135 | Install new concrete pavement or sidewalks | SF | $ 16.68 | |
VA136 | Install new Line Striping | LF | $ 0.14 | |
VA137 | Install new top soil and grass seeding | SF | $ 1.12 | |
Masonry | ||||
VA138 | Cleaning and Application of Elastomeric Waterproof Membrane to exposed Concrete / Masonry Surface | SF | $ 12.47 |
VA139 | Brick, Remove and install new standard brick | Each | $ 31.39 |
VA140 | Masonry Through Wall Flashing Replacement | LF | $ 46.34 |
VA141 | Masonry Tuck Pointing | SF | $ 11.26 |
VA142 | New Aluminum Metal Parapet Copings | LF | $ 74.11 |
VA143 | EIFS Repair | SF | $ 25.44 |
VA144 | Metal Roof Removal | SF | $ 1.69 |
VA145 | Soffits - Unvented | SF | $ 13.16 |
VA146 | Soffits - Vented | SF | $ 12.90 |
Green Sustainable Roofing | |||
VA147 | Roof Protection Mat | SF | $ 1.54 |
VA148 | Roof Root Barrier | SF | $ 2.77 |
Drainage Layer | |||
VA149 | 1/2" Drainage Layer | SF | $ 6.04 |
VA150 | 1" Drainage Layer | SF | $ 7.06 |
VA151 | Aeration Layer | SF | $ 5.28 |
VA152 | Moisture retention Layer | SF | $ 2.66 |
VA153 | Reservoir Layer | SF | $ 8.80 |
VA154 | Filter Fabric | SF | $ 2.41 |
VA155 | Irrigation and Controls | SF | $ 1.32 |
VA156 | Slotted Edge Material | LF | $ 36.89 |
VA157 | Growing Media/ Engineered Soil, 1" Depth | SF | $ 3.61 |
Landscape Plants, Sedums | |||
VA158 | Landscape Plants, Sedums, Cuttings | SF | $ 10.55 |
VA159 | Landscape Plants, Sedums, Plugs | SF | $ 14.06 |
VA160 | Landscape Plants, #1 Container Standard Perennial | Each | $ 18.11 |
VA161 | Landscape Plants, #2 Container Standard Perennial | Each | $ 34.25 |
VA162 | Landscape Plants, #1 Container Standard Shrub | Each | $ 28.10 |
VA163 | Landscape Plants, #2 Container Standard Shrub | Each | $ 50.95 |
VA164 | Inspection Boxes | Each | $ 342.49 |
VA165 | Leak Detection Systems Min. Charge $4,900.00 (10,000 SF) | SF | $ 0.66 |
VA166 | Path Lighting (5 Ft Spacing) - Low Voltage | LF | $ 26.36 |
VA167 | Wind Erosion Material | LF | $ 3.96 |
VA168 | Bio Tray | Each | $ 38.65 |
VA169 | Standard Concrete Pavers (2' X 2' X 2") | Each | $ 35.14 |
Professional Service Fees: Green Roof | |||
VA170 | Landscape Architect / Horticulturist - multiplier/factor to be applied to RS Means cost | % | 93.00% |
VA171 | Design, Documentation Planting Layout - multiplier/factor to be applied to RS Means cost | % | 93.00% |
Green Roofing Maintenance | |||
VA172 | 3 Year Maintenance - Less than 5000 SF | Each | $ 6,690.46 |
VA173 | 3 Year Maintenance - 5000 SF or More | SF | $ 1.34 |
Vegetative Roof Warranty | |||
VA174 | 20 Year Extensive (min. charge $2000.00) | SF | $ 1.31 |
VA175 | 20 Year Intensive (min. charge $2000.00) | SF | $ 1.06 |
Building Envelope Services | |||
VA176 | Foam Roof/Wall Intersection - Under 20' | LF | $ 15.10 |
VA177 | Foam Roof/Wall Intersection - Over 20' | LF | $ 17.83 |
VA178 | Seal roof top exhaust fan curb mountings | Each | $ 100.64 |
VA179 | Adding foam board as a filler in large openings, i.e.: above soffits | LF | $ 31.45 |
VA180 | Interior miscellaneous foam application - Under 20' | LF | $ 12.59 |
VA181 | Weatherstrip and install sweep - single commercial door | Set | $ 353.77 |
VA182 | Weatherstrip and install sweep - double commercial door | Set | $ 707.53 |
VA183 | Seal Mechanical Rooms (With wall / roof pipe projections) | Set | $ 655.10 |
VA184 | Seal individual plumbing, pipe or duct | Each | $ 65.52 |
VA185 | Seal Windows (exterior only, sub-k must provide estimate) | LF | $ 15.73 |
VA186 | Weatherstrip operable wood or aluminum windows with replacement finseal pile or foam tape or vinyl “V” strips | LF | $ 5.59 |
VA187 | Weatherstrip steel frame and sash windows with in-situ silicone gasket. 2 trips required. | LF | $ 12.71 |
VA188 | Interior caulking of window and door frames with clear paintable caulk | LF | $ 2.89 |
VA189 | Miscellaneous Interior caulking with clear paintable caulk | LF | $ 2.89 |
VA190 | Weatherstrip Overhead Garage Doors (12' x12') 48' LF w/rubber fins on bottom. Install face mounted leafe seal product to the bottom face of the door as the thresholds on doors | Unit | $ 1,257.82 |
VA191 | Blower Door Testing - Final air barrier performance test and report as specified in contract. Air barrier testing report and Infrared inspection report delivered within 10 business days. | Day | $ 10,481.70 |
VA192 | Thermography inspection performed during final test and thermography inspection. (Based on 60,000 dq.ft. elementary school) | Day | $ 5,240.87 | |
VA193 | Blower Door Directed Air Sealing - Supervision Only | Day | $ 3,930.65 | |
VA194 | Building Envelope Assessment - Comprehensive in-field assessment of existing conditions to determine if a durable, continuous and correctly aligned air and thermal barrier is installed. Provide Assessment Report with recommendations. Phone and email con | Day | $ 7,861.28 | |
Alternative Methods of Costing | ||||
VA195 | HVAC, plumbing and electrical contractors | Day | $ 827.69 | |
VA196 | HVAC: Alternative Methods of Costing - percent of overhead/markup and profit added to cost | % of O/P | 20.00% | |
VA197 | HVAC: Discounts Offered Off Alternative Costing Methods (cost plus profit and overhead) Less Rate of Discount | % | 6.00% | |
VA198 | HVAC: Multiplier/factor to be applied to the R.S. Means costs. | % | 93.00% | |
VA199 | Plumbing: Alternative Methods of Costing - percent of overhead/markup and profit added to cost | % of O/P | 20.00% | |
VA200 | Plumbing: Discounts Offered Off Alternative Costing Methods (cost plus profit and overhead) Less Rate of Discount | % | 6.00% | |
VA201 | Plumbing: Multiplier/factor to be applied to the R.S. Means costs. | % | 93.00% | |
VA202 | Electrical: Alternative Methods of Costing - percent of overhead/markup and profit added to cost | % of O/P | 20.00% | |
VA203 | Electrical: Discounts Offered Off Alternative Costing Methods (cost plus profit and overhead) Less Rate of Discount | % | 6.00% | |
VA204 | Electrical: Multiplier/factor to be applied to the R.S. Means costs. | % | 93.00% | |
VA205 | Multiplier/Factor to be applied to the R.S. Means Cost for the National Cooperative Contractor Network | % | 93.00% | |
VA206 | Non- Prepriced Special and/or Unique Circumstances, Equipment or Material Based on Most Current RS Means Catalogue | % | 93.00% | |
Professional and Trade Specific Labor | ||||
VA207 | Building/Construction Superintendent | Hour | $ 198.01 | |
VA208 | Building/Construction Manager | Hour | $ 231.01 | |
VA209 | Consulting | Hour | $ 72.01 | |
VA210 | Design | Hour | $ 106.81 | |
VA211 | Installer | Hour | $ 179.63 | |
VA212 | Tradesman | Hour | $ 179.63 | |
VA213 | Engineering, Electrical | Hour | $ 176.41 | |
VA214 | Engineering, Mechanical | Hour | $ 176.41 | |
VA215 | Engineer Cost by state/region | Hour | $ 187.14 | |
VA216 | Crew Supervision | Hour | $ 115.79 | |
VA217 | General Laborer | Hour | $ 158.08 | |
VA218 | Training | Hour | $ 131.72 | |
Pure Air Services | ||||
IAQ Field Work and Report Writing | ||||
VA219 | Certified IAQ Professional (CIAQP) | Hour | $ 176.41 | |
VA220 | Mechanical Engineer | Hour | $ 176.41 | |
VA221 | IAQ Diagnostic Tech | Hour | $ 169.21 | |
VA222 | Project Manager | Hour | $ 134.41 | |
VA223 | IAQ Project Supervisor | Hour | $ 127.21 | |
VA224 | HVAC/IAQ Specialist | Hour | $ 169.58 | |
VA225 | Doctorate Scientist (PhD) | Hour | $ 232.81 | |
VA226 | Laboratory Manager | Hour | $ 211.81 | |
VA227 | Admin Support Technical | Hour | $ 78.01 | |
VA228 | Professional Engineer (PE) | Hour | $ 217.81 | |
VA229 | Standard TRAVEL DAILY Rate for IAQ Services per Man | Day | $ 330.01 | |
Duct Cleaning | ||||
VA230 | Duct Cleaning - no encapsulation | LF | $ 23.41 | |
VA231 | Duct Cleaning encapsulation | LF | $ 33.01 | |
VA232 | Hygienic Disinfection Steam Cleaning | SF | $ 55.88 | |
Insulation | ||||
VA233 | Zero-Porosity HVAC Insulation System--Non-Wicking Installed | SF | $ 32.60 | |
VA234 | Zero-Porosity Insulation 1" 200 sf per roll | SF (Material Only) | $ 10.54 | |
VA235 | Zero-Porosity Insulation 1/2" 50 sf per roll | SF (Material Only) | $ 4.91 | |
Anti-Microbial Coating | ||||
VA236 | Anti-Viral, Anti-Microbial Chemical Unit Casing Coating | SF | $ 65.20 | |
VA237 | Anti-Viral, Anti-Microbia Liner 2.0 Drain Pan Treatment (<20 sf) | SF | $ 50.41 | |
VA238 | Anti-Viral, Anti-Microbial Liner 2.0 Drain Pan Treatment (>20 sf) | SF | $ 35.41 | |
Fan Array Retrofit | ||||
Fan Array Optimization and Redundancy Installation | ||||
VA239 | <10,000 CFM Unit | CFM | $ 19.73 | |
VA240 | >10,000 CFM Unit | CFM | $ 11.05 |
VA241 | Fan Array Material--cost per CFM will depend upon engineering, design, total CFM, static pressure, # fans, amps/volts, size of bulkhead wall, etc. | CFM (Material Only) | $ 7.00 |
Equipment Rental | |||
Air Scrubbers, Dehu's, Blowers | |||
VA242 | Dehumidifier, daily rate per Units, per Days | Day | $ 50.83 |
VA243 | Dehumidifier, weekly rate per Units, per Weeks | Week | $ 181.51 |
VA244 | Dehumidifier, monthly rate per Units, per Month | Month | $ 726.01 |
VA245 | Negative Air Machine 2000, daily rate per Units, per Days | Day | $ 58.09 |
VA246 | Negative Air Machine 2000, weekly rate per Units, per Weeks | Week | $ 217.81 |
VA247 | Negative Air Machine 2000, monthly rate per Units, per Months | Month | $ 871.21 |
VA248 | Negative Air Machine - 5-6K CFM, weekly rate per Units, per Weeks | Week | $ 254.11 |
VA249 | Blowers/Air Movers, daily rate per Units, per Days | Day | $ 46.48 |
VA250 | Blowers/Air Movers, weekly rate per Units, per Weeks | Week | $ 181.51 |
VA251 | Axial Fans w/rigid flex ducting, daily rate per Units, per Days | Day | $ 50.83 |
VA252 | Axial Fans w/rigid flex ducting, weekly rate per Units, per Weeks | Week | $ 181.51 |
VA253 | Compressor, daily rate per Units, per Days | Day | $ 47.21 |
VA254 | Compressor, weekly rate per Units, per Weeks | Week | $ 166.99 |
Vacuums | |||
VA255 | Backpack Vacuum, daily rate per Units, per Days | Day | $ 29.05 |
VA256 | Backpack Vacuum, weekly rate per Units, per Weeks | Week | $ 108.91 |
VA257 | HEPA Vacuum wet/dry, daily rate per Units, per Days | Day | $ 58.09 |
VA258 | HEPA Vacuum wet/dry, weekly rate per Units, per Weeks | Week | $ 217.81 |
VA259 | HEPA Vacuum wet/dry, monthly rate per Units, per Month | Month | $ 871.21 |
Painting Sanding | |||
VA260 | Paint Sprayer - Airless, daily rate per Units, per Days | Day | $ 43.57 |
VA261 | Paint Sprayer - Airless, weekly rate per Units, per Weeks | Week | $ 145.21 |
VA262 | IBIX - Sand/Garnet Blaster per Units, per Days | Day | $ 116.17 |
VA263 | IBIX - Sand/Garnet Blaster per Units, per Weeks | Week | $ 726.01 |
Pressure Wash Hot/Cold | |||
VA264 | Pressure Washer - Hot/Steam, daily rate per Units, per Days | Day | $ 137.95 |
VA265 | Pressure Washer - Hot/Steam, weekly rate per Units, per Weeks | Week | $ 544.51 |
VA266 | Pressure Washer 208V- Hot/Steam, daily rate per Units, per Days | Day | $ 159.73 |
VA267 | Pressure Washer 208V- Hot/Steam, weekly rate per Units, per Weeks | Week | $ 958.33 |
VA268 | Pressure Washer 480V- Hot/Steam, daily rate per Units, per Days | Day | $ 174.25 |
VA269 | Pressure Washer 480V- Hot/Steam, weekly rate per Units, per Weeks | Week | $ 1,045.45 |
VA270 | Pressure Washer - Cold, daily rate per Units, per Days | Day | $ 43.57 |
VA271 | Pressure Washer - Cold, weekly rate per Units, per Weeks | Week | $ 145.21 |
VA272 | High Volume/Low Pressure Coil Cleaner, daily rate per Units, per Days | Day | $ 43.57 |
VA273 | High Volume/Low Pressure Coil Cleaner, weekly rate per Units, per Weeks | Week | $ 145.21 |
Air Duct Cleaning | |||
VA274 | Viper/Mechanical Brush - Duct Cleaning, daily rate per Units, per Days | Day | $ 43.57 |
VA275 | Viper/Mechanical Brush - Duct Cleaning, weekly rate per Units, per Weeks | Week | $ 145.21 |
VA276 | Negative Air Machine - 5-6K CFM, daily rate per Units, per Days | Day | $ 84.61 |
VA277 | Negative Air Machine - 5-6K CFM, weekly rate per Units, per Weeks | Week | $ 390.01 |
Video Photo | |||
VA278 | Infrared Camera, daily rate per Units, per Days | Day | $ 363.01 |
VA279 | Infrared Camera, weekly rate per Units, per Weeks | Week | $ 1,742.41 |
Decontamination Services | |||
VA280 | Decon Handheld Duct Foggers, daily rate per Units, per Days | Day | $ 58.09 |
VA281 | Decon Handheld Duct Foggers, weekly rate per Units, per Weeks | Week | $ 181.51 |
VA282 | Decon ESS Tank Foggers, daily rate per Units, per Days | Day | $ 108.91 |
VA283 | Decon ESS Tank Foggers, weekly rate per Units, per Weeks | Week | $ 544.51 |
VA284 | Decon sanitizer, daily rate per Units, per Days | Day | $ 108.91 |
VA285 | Decon sanitizer, weekly rate per Units, per Weeks | Week | $ 544.51 |
Drying | |||
VA286 | Thermal Drying System, daily rate per Units, per Days | Day | $ 108.91 |
VA287 | Thermal Drying System, weekly rate per Units, per Weeks | Week | $ 653.41 |
Other | |||
VA288 | Tile Stripper, daily rate per Units, per Days | Day | $ 108.91 |
VA289 | Tile Stripper, weekly rate per Units, per Weeks | Week | $ 450.13 |
VA290 | Roto Hammer, daily rate per Units, per Days | Day | $ 108.91 |
VA291 | Roto Hammer, weekly rate per Units, per Weeks | Week | $ 450.13 |
VA292 | Portable Containment Cubes per units, per days | Day | $ 330.01 |
VA293 | Portable Containment Cubes per Units, per Weeks | Week | $ 1,980.01 |
VA294 | HEPA 20K per Unit, per day (plus delivery, set up and tear down) | Day | $ 1,914.01 |
VA295 | 150 CFM rust Blasting Unit per Unit, per day (plus delivery, set up and tear down) | Day | $ 1,500.01 |
Material and Supplies | |||
VA296 | Decon Decontamination Disinfectant | Gal | $ 232.81 |
VA297 | Anti-Microbial Mastic Primer 4:1:1 Solvent based, PN 537732 | Gal | $ 241.02 |
VA298 | Anti-Microbial Multi Coat Siloxane Coating RAL 7040 PN 98015-solvent based | Gal | $ 309.88 |
VA299 | Anti-Microbial Pan Coating - LIGHT GREY | Gal | $ 173.02 |
VA300 | Anti-Microbial Mastic Primer water based PN 255757 | Gal | $ 494.42 |
VA301 | Anti-Microbial Pan Coating Blue - 1 GALLON PN 987757 | Gal | $ 173.02 |
VA302 | Anti-Microbial Spray Gun - Combo Pack | Each | $ 149.00 |
VA303 | Anti-Microbial Multi Coat - Water Based RAL 7001 PN 4217 | Gal | $ 344.36 |
Laboratory Assays | |||
VA304 | Sample collected from indoor environment and analyzed in an A2LA or AIHA certified laboratory for microbiological assay, or particulate analysis, or chemical/biochemical assay, or comfort analysis, or ventilation analysis, or pressure diagnostics analysis | Sample | $ 180.01 |
VA305 | Freight - Prepaid and Add | Lump Sum | QUOTE |
Exhibit B Authority Project
Page 9 of 9
Manatee County
Submitted by:
Weatherproofing Technologies, Incorporated.
December 11th, 2025
OMNIA
WTI Proposal: 5070823
December 11th, 2025
ATTN: Jonathan Noguera
Weatherproofing Technologies, Inc. (WTI), is pleased to submit this proposal for the Manatee County Port Authority – TPA Roof Replacement – South Docks. Please acknowledge the scope of the work for a detailed description of what is proposed to be performed. We look forward to working with you on this project.
SCOPE OF WORK:
TPA Roof Replacement
Safety
All WTI technicians will complete DTAs.
Harnesses will be used at all times when using the man lift.
All ladders will be secured to building.
Customer Check-in
Lead technician is to check in with customer representative daily.
Staging Materials
Authorization for staging area will be given by customer.
WTI will stage all tools and materials for the project in specified area.
Loading/Offloading Rooftop
Crane will be used to transport materials and supplies to the rooftop.
Team is expected to follow weight limit guidelines provided on lift manual.
Roof Tear-Off
Existing roofing system is to be removed all the way to the lightweight concrete.
All existing wall flashings, scuppers, pipe boots are to be removed.
All garbage and debris are to be discarded into WTI’S provided dumpster.
Pre-Primed 1/2 in Securock Install
1/2 in securock is to be installed over existing lightweight concrete.
It will be secured with #14 fasteners.
Securock must be staggered both vertically and horizontally.
Single Ply - TPA Install
Single ply will be layed out and precut to roofs dimensions.
Single ply will then be folded back and adhered using TPO Bonding Adhesive directly to the installed Securock.
All newly installed single ply will be rolled in using “weighted roller to ensure proper adhesion and no blistering.
Field laps will be heat welded closed.
TPA Wall Flashing
Roofs surrounding interior walls will be flashed vertically.
TPO bonding adhesive will be applied to the walls and wall flashing.
TPO will be applied to walls and flashing laps will be welded into field.
Wall flashing to field lap must be a minimum of .4 in overlap.
Retro Drain / Scupper Detail
Install retro fit drain/ New Scupper.
Weld TPO membrane to retro drain flashing.
Tighten rubber gasket to fit tight in existing pipe.
Secure, drain ring, and drain basket.
Detail / Unsupported
All vertical wall seams will be reinforced using 4 in x 9 in Blowouts.
Scupper insert flashing will be field wrapped and targeted using unsupported target.
All inside / Outside Corners will be detailed out with pre-made inside/outside corners
Coping Metal Replacement
Remove coping metal.
Replace with new aluminum coping metal.
Attach coping metal with 1 1/2 in Fasteners with neoprene washers every 8 to 12 inches.
Canopy Replacement (2)
Tear down two existing canopy’s.
Install two new Aluminum canopy’s
Check-out with Customer
At the end of each workday and at the end of the project, the lead technician is to provide a detailed daily report.
Lead technician will inform customer when project is complete.
Team will leave project.
Provide a 20-year Tremco Roof Replacement Warranty.
December 11th, 2025
ATTN: Jonathan Noguera
Weatherproofing Technologies, Inc. (WTI), is pleased to submit this proposal for the Manatee County - Manatee County Port Authority – Alumination 301. Please acknowledge the scope of the work for a detailed description of what is proposed to be performed. We look forward to working with you on this project.
Alumination 301 Roof Restoration
Technicians will check in with the customer daily.
Technicians will complete a daily task analysis (DTA) every day before beginning work.
Set-up safety in compliance with OSHA/WTI standards.
Tear-off existing 6 FT of perimeter R-panel metal
Install new 24 GA R-panels on the perimeter of the roof.
Use 1-1/2 in self-tapping metal grip screws with neoprene washers to mechanically fasten R-panels to iron beams.
Install new gutter straps around the perimeter of the building.
Secure new straps with 1 in self-tapping metal to metal screws with neoprene washers.
Install solar guard, seam sealer, on all pre-existing fasteners for a water tight seal.
Remove/replace any loose or rusted screws.
Install Tremco, Tremseal Pro at ridge closures for a water tight seal.
Install Tremco Alumination 301 across the entirety of the building.
All job-site related debris will be removed from job site daily.
Lead technician will complete a daily field report with photos and written report of work completed.
Technicians will check out with customer daily.
Provide a 12-year Tremco Roof Restoration Warranty.
EXCLUSIONS:
No electrical, mechanical, or plumbing costs are included in the lump sum.
QUALIFICATIONS:
Barricades and signs, along with traffic control protection, will be provided as needed by the contractors.
Use of onsite parking for workers assumed during construction.
Use of building electric power and water assumed during construction.
PROPOSED SCHEDULE & FEES
SCHEDULE
We will dedicate required manpower/resources to perform our services on a timely and responsive basis. Full-time supervision will be supplied for the basic scope of work, we estimate One hundred ten (110) days construction time which will be scheduled from receipt of a purchase order.
NOTE: Field work cannot be completed during inclement weather.
FEES: Manatee County
Based on the abbreviated scope of work listed, we propose a total lump sum fee in the amount of: (One Million Four Hundred Ninety-Seven Thousand Three Hundred Sixty-Five Dollars and Sixty-Four Cents).
We have included in the project costs all labor, materials, equipment, and incidentals to complete the work as outlined in the specifications, including construction management, profit, and overhead.
The lump sum pricing is based on access to certain areas such as parking lots or interior pathways to access roofs. Interior access will also need to be available to reach certain roof sections. A laydown area on-site, if available, would be used to store material and equipment.
In roof areas where mechanical equipment is prevalent, coordination with the owners in-house or mechanical contractor will be required as not to disconnect or shut down any equipment without permission.
This proposal is set forth above in accordance with the terms and conditions of Omnia Contract #R230404.
This proposal is valid for sixty (60) days and does not include taxes. Owner to provide a tax-exempt certificate.
Services requested beyond the above scope of work shall be considered additional services. If requested, separate or multiple cost opinions shall be prepared at additional cost.
Respectfully,
Blake Peery Construction Manager Copy: Seth Schmenk
APPROVED BY:
Owner:
Signature:
Print Name:
Date:
This proposal is an offer by WTI to provide the scope of work set forth above to the customer on the Terms and Conditions set forth herein and in Omnia Contract #R230404 terms and conditions, which are hereby incorporated by reference (together, the “Terms and Conditions”). The Terms and Conditions will govern the work to the exclusion of any other or different terms, including in any customer purchase order, unless otherwise expressly agreed in writing pursuant to a Master Agreement or similar contract with customer signed by an authorized representative of WTI.
We appreciate the opportunity of being considered for these services. Should you have any questions about our proposal, please let us know.