A meeting of the Manatee County Port Authority will be held during a Land Use meeting Thursday, November 19, 2024, at 9:00 am, or as soon thereafter as is practicable, in the Patricia M. Glass Commission Chambers on the first floor of the County Administrative Center at 1112 Manatee Avenue West, Bradenton, Florida.
Any person requiring special accommodations at this meeting because of a disability or physical impairment should contact Pam Wingo 48 hours in advance of the meeting by telephone (941) 721-2395 or by email at pwingo@seaportmanatee.com.
MANATEE COUNTY PORT AUTHORITY AGENDA
November 19, 2024
9:00 a.m.
The Manatee County Port Authority may take action on any matter during this meeting, including those items set forth within this agenda. The chairperson, at the option of the chairperson, may take business out of order if the chairperson determines that such a change in the agenda’s schedule will expedite the business of the Port Authority.
CALL TO ORDER
Public Comments
Consent Agenda
Requests by Port Authority (items to be pulled from Consent Agenda)
Executive Director Comments
Commissioner Comments
Adjourn
According to Section 286.0105, Florida Statutes, any person desiring to appeal any decision made by the Port Authority with respect to any matter considered at this meeting will need a record of the proceedings, and for such purpose may need to ensure that a verbatim record of the proceedings is made, which includes the testimony and evidence upon which the appeal is to be based.
November 19, 2024
CONSENT AGENDA
Warrant List
Minutes – October 17, 2024
Holiday & Pay Date Schedule 2025
BDI Contractors Change Order No. 3
RECOMMENDATION:
Move to approve the Consent Agenda incorporating the language as stated in the recommended motions on the cover sheets for the Consent Agenda items.
Manatee County Port Authority Warrant (Check) Listing
10/01/2024 to 11/06/2024
AP | XXXXXXX | V015708 | A & W MAINTENANCE INC | 240.00 |
AP | XXXXXXX | V016081 | AECOM TECHNICAL SERVICES INC | 5,840.00 |
AP | XXXXXXX | V026712 | ALAN JAY FLEET SALES | 31,756.00 |
AP | XXXXXXX | V026712 | ALAN JAY FLEET SALES | 32,033.00 |
AP | XXXXXXX | V018533 | ALL STEEL BUILDINGS | 565,806.34 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 146.49 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 2,818.66 |
AP | XXXXXXX | V029295 | AMAZON CAPITAL SERVICES INC | 1,349.18 |
AP | XXXXXXX | V023321 | AMERICAN EXPRESS TRAVEL RELATE | 71.09 |
AP | XXXXXXX | V109681 | AMERICAN ROLL UP DOOR CO | 148,646.66 |
AP | XXXXXXX | V113719 | APEX OFFICE PRODUCTS INC | 230.93 |
AP | XXXXXXX | V023254 | ARCPOINT LABS OF SARASOTA | 180.00 |
AP | XXXXXXX | V023254 | ARCPOINT LABS OF SARASOTA | 55.00 |
AP | XXXXXXX | V118009 | AT AND T | 78.87 |
AP | XXXXXXX | V013140 | AT AND T MOBILITY | 111.09 |
AP | XXXXXXX | V032854 | ATLANTIC RACK AND SHELVING INC | 7,353.50 |
AP | XXXXXXX | V126825 | BAKERS PAINT AND BODY SHOP | 3,022.82 |
WT | XXXXXXX | V019189 | BANK OF AMERICA | 18,110.85 |
AP | XXXXXXX | V002730 | BANK OF AMERICA | 1,014.51 |
AP | XXXXXXX | V032709 | BDI MARINE CONTRACTORS LLC | 650,536.88 |
AP | XXXXXXX | V385114 | BILL HALFACRE INC. | 769,440.42 |
AP | XXXXXXX | V385114 | BILL HALFACRE INC. | 80,827.00 |
AP | XXXXXXX | V009839 | BRYANT MILLER AND OLIVE PA | 11,674.00 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 768.39 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 604.98 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 661.42 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 129.99 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 768.39 |
AP | XXXXXXX | V029174 | CHARTER COMMUNICATIONS | 159.98 |
AP | XXXXXXX | V021377 | CINTAS CORPORATION | 184.12 |
AP | XXXXXXX | V021377 | CINTAS CORPORATION | 92.06 |
AP | XXXXXXX | V200106 | CSX TRANSPORTATION | 2,608.00 |
AP | XXXXXXX | V031972 | DADE SERVICE CORPORATION | 54,770.05 |
AP | XXXXXXX | V006291 | DEX IMAGING INC | 311.32 |
AP | XXXXXXX | V282890 | DISCOUNT LOCK AND KEY INC | 12.00 |
AP | XXXXXXX | V282890 | DISCOUNT LOCK AND KEY INC | 210.00 |
WT | XXXXXXX | V334600 | DIVISION OF RETIREMENT, FLORID | 1.81 |
AP | XXXXXXX | V020796 | DRYMON REFRIGERATION INC | 3,300.00 |
AP | XXXXXXX | V000096 | ELECTRIC SUPPLY OF TAMPA INC | 350.04 |
AP | XXXXXXX | V000096 | ELECTRIC SUPPLY OF TAMPA INC | 400.08 |
AP | XXXXXXX | V000096 | ELECTRIC SUPPLY OF TAMPA INC | 1,829.78 |
AP | XXXXXXX | V022096 | ENTECH | 3,480.10 |
AP | XXXXXXX | V032741 | ERMPROTECT | 41,925.00 |
AP | XXXXXXX | V024683 | EVERGLADES EQUIPMENT GROUP | 123.87 |
AP | XXXXXXX | V323190 | FASTENAL COMPANY | 4.70 |
ZP | XXXXXXX | L333009 | FLEET PRODUCTS | 1,721.39 |
Manatee County Port Authority Warrant (Check) Listing
10/01/2024 to 11/06/2024
AP | XXXXXXX | V335089 | FLORIDA DEPT OF COMMERCE | 175.00 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 11,298.30 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 62,540.73 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 27,118.20 |
AP | XXXXXXX | V019619 | FLORIDA POWER AND LIGHT COMPAN | 9,128.68 |
AP | XXXXXXX | V334006 | FLORIDA PUBLIC RELATIONS ASSOC | 305.03 |
WT | XXXXXXX | V033388 | FORTRESS 2020 LANDCO LLC | 250,006.00 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 66.24 |
AP | XXXXXXX | V021937 | FRONTIER COMMUNICATIONS OF FLO | 4,881.77 |
AP | XXXXXXX | V023397 | GAHAGEN AND BRYANT ASSOCIATES | 3,215.00 |
AP | XXXXXXX | V020655 | GARCIA, ELENA | 230.88 |
AP | XXXXXXX | V026528 | GEIGER | 1,232.74 |
AP | XXXXXXX | V020807 | GENUINE AUTOMOTIVE | 603.39 |
AP | XXXXXXX | V033265 | GETTYSBURG FLAG WORKS INC | 3,357.41 |
AP | XXXXXXX | V385628 | GRAINGER INC, W W | 522.10 |
AP | XXXXXXX | V387610 | GRAVELY OF BRADENTON | 2,078.49 |
AP | XXXXXXX | V013868 | HARDEN SUPPLY LLC | 1,254.20 |
AP | XXXXXXX | P000354 | HAUSER, DAVID | 130.00 |
AP | XXXXXXX | V022318 | HERC RENTALS INC | 686.00 |
AP | XXXXXXX | V023500 | HOME DEPOT CREDIT SERVICES | 1,780.30 |
AP | XXXXXXX | V030525 | HORIZON DISTRIBUTORS INC | 808.89 |
AP | XXXXXXX | V032941 | JOHNSTONE SUPPLY | 6,657.60 |
WT | XXXXXXX | V032482 | KONECRANES GMBH | 16,330.20 |
AP | XXXXXXX | V004489 | LOWES HOME CENTER INC | 556.26 |
AP | XXXXXXX | V024291 | MACKAY COMMUNICATIONS INC | 580.71 |
AP | XXXXXXX | V625403 | MAINTENANCE TOO PAPER CO INC | 633.23 |
AP | XXXXXXX | V019415 | MANATEE COUNTY CLERK OF CIRCUI | 13.00 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 416.51 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 4,500.72 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 325.33 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 3,951.89 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 4,752.41 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 6,471.62 |
AP | XXXXXXX | V004140 | MANATEE COUNTY PUBLIC WORKS DE | 10,337.90 |
AP | XXXXXXX | V627108 | MANATEE PRINTERS INC | 672.00 |
AP | XXXXXXX | V028130 | MANATEE RIVER ROTARY CLUB INC | 1,000.00 |
AP | XXXXXXX | V000259 | MANATEE SPORTS UNLIMITED | 1,386.50 |
AP | XXXXXXX | V000259 | MANATEE SPORTS UNLIMITED | 522.00 |
AP | XXXXXXX | V018513 | MARTIN ASSOCIATES | 12,000.00 |
AP | XXXXXXX | V028973 | MCGRIFF INSURANCE SERVICES INC | 87,750.00 |
AP | XXXXXXX | V696409 | NORTH RIVER FIRE DIST | 1,608.18 |
AP | XXXXXXX | V030876 | OPTERRA SOLUTIONS INC | 2,568.33 |
AP | XXXXXXX | V028053 | ORKIN LLC | 1,319.73 |
AP | XXXXXXX | V708015 | OTIS ELEVATOR | 190.00 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 2,231.40 |
AP | XXXXXXX | V014691 | PALMDALE OIL COMPANY INC | 7,760.20 |
Manatee County Port Authority Warrant (Check) Listing
10/01/2024 to 11/06/2024
AP | XXXXXXX | V030390 | PALMETTO ROTARY | 325.00 |
AP | XXXXXXX | V736427 | PITNEY BOWES CREDIT CORP | 141.00 |
AP | XXXXXXX | V028846 | PORT OF PORT MANATEE PROPELLER | 320.00 |
AP | XXXXXXX | V022437 | PREFERRED GOVERNMENTAL INSURAN | 25,060.50 |
AP | XXXXXXX | V748180 | PUBLIX SUPER MARKET | 740.75 |
AP | XXXXXXX | V748180 | PUBLIX SUPER MARKET | 104.09 |
AP | XXXXXXX | V020765 | R S AND H INC | 35,322.04 |
AP | XXXXXXX | V020765 | R S AND H INC | 35,355.34 |
AP | XXXXXXX | V776386 | RING POWER CORP | 904.50 |
AP | XXXXXXX | P000420 | ROMERO VELEZ, JEAN M | 63.29 |
AP | XXXXXXX | V033319 | SAUNDERS ASSOCIATES LTD | 1,900.00 |
AP | XXXXXXX | V837021 | SHENANDOAH GENERAL CONSTRUCTIO | 185,225.00 |
AP | XXXXXXX | V002070 | SPECTRUM UNDERGROUND INCORPORA | 301,500.55 |
AP | XXXXXXX | V029241 | SPEEDPRO IMAGING AFFINITY SOLU | 436.58 |
AP | XXXXXXX | V029223 | STANTEC ARCHITECTURE INC | 1,244.50 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 21,451.20 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 9,747.00 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 6,068.80 |
AP | XXXXXXX | V018137 | STANTEC CONSULTING SERVICES IN | 2,639.50 |
WT | XXXXXXX | V874841 | STATE OF FLA DEPT OF REVENUE | 6,425.11 |
AP | XXXXXXX | V901518 | TAMPA BAY STEEL CORPORATION | 1,157.64 |
AP | XXXXXXX | V906395 | TERRY SUPPLY COMPANY | 566.99 |
AP | XXXXXXX | V906395 | TERRY SUPPLY COMPANY | 145.01 |
AP | XXXXXXX | V031555 | TIDALIS AMERICAS LTD | 154,000.00 |
AP | XXXXXXX | V923225 | TROPHY CASE, THE | 79.50 |
AP | XXXXXXX | V003712 | UNITED RENTALS NORTH AMERICA I | 758.00 |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 193.29 |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 454.22 |
AP | XXXXXXX | V009667 | VERIZON WIRELESS | 593.62 |
AP | XXXXXXX | V014316 | WASTE PRO OF FLORIDA INC | 25.00 |
AP | XXXXXXX | V021915 | WEBTIVITY MARKETING AND DESIGN | 225.00 |
AP | XXXXXXX | V994350 | YOUNG INC, GEORGE F | 3,842.29 |
Total warrants (checks) for period reported 3,798,731.14
MANATEE COUNTY PORT AUTHORITY REGULAR MEETING
COUNTY ADMINISTRATION CENTER, HONORABLE PATRICIA M. GLASS CHAMBERS
1112 Manatee Avenue West Bradenton, Florida October 17, 2024
https://www.youtube.com/channel/UC4KFtzaC9Z87D5mn_SKKtBA
Present were:
Kevin Van Ostenbridge, Chairman Jason Bearden, First Vice-Chairman Ray Turner, Second Vice-Chairman Amanda Ballard, Third Vice-Chairman George W. Kruse
Mike Rahn District 1 seat is vacant.
Also present were:
Carlos Buqueras, Executive Director Noah Daiker, Bryant Miller Olive Law Firm
Dustin Peebles Accounting, Clerk of the Circuit Court Hannah Bishop, Deputy Clerk, Clerk of the Circuit Court
Chairman Van Ostenbridge called the meeting to order at 9:07 a.m.
Chairman Van Ostenbridge thanked Port Manatee Staff for all they did after Hurricane Milton.
AGENDA PA20241017DOC001
Agenda Update Memorandum:
Item 3.C Budget Resolution – FY 2025 – added an additional budget item of $250,000 for land purchase deposit
Item 5 Agreement for Purchase and Sale of Real Property – revised agreement for purchase and sale of real property
PUBLIC COMMENTS
Bill Galvano, representing Fortress 2020 Landco LLC, provided a brief explanation regarding Item 5, and thanked the Authority and Sea Port Manatee staff for all they do for the Port.
There being no public comments, Chairman Van Ostenbridge closed public comments.
CONSENT AGENDA PA20241017DOC002
A motion was made by Member Rahn, seconded by Turner, and carried 6 to 0, to approve the Consent Agenda, incorporating the language as stated in the recommended motions on the cover sheets for the Consent Agenda.
WARRANT LIST
Accepted Warrant Listing from August 20, 2024 to September 30, 2024 PA20241017DOC003
MINUTES
Approved the Minutes August 27, 2024
BUDGET AMENDMENT
Adopted Budget Resolution PA-25-01 PA20241017DOC004
PUBLIC TRANSPORTATION GRANT AGREEMENT
Adopted Resolution PA-24-22 authorizing the execution of the Public Transportation Grant Agreement with the Florida Department of Transportation for the Intermodal Container Yard Phase 3 project PA20241017DOC005
October 17, 2024 (Continued)
PUBLIC TRANSPORTATION GRANT AGREEMENT
Adopted Resolution PA-24-23 authorizing the execution of the Public Transportation Grant Agreement with the Florida Department of Transportation for the berth rehabilitation project PA20241017DOC006
INSURANCE RENEWALS 2024-2025
Approved the following estimated insurance coverages for the Port Authority. There may be possible increases/decreases due to changes in insurance coverage:
The Florida Municipal Insurance Trust (FMIT) for Real & Personal Property for a premium of $1,500,000. Boiler and Machinery and Crime included in Real & Personal Property coverage; and
Boyd Insurance & Investment Services for Inland Marine, Vehicle Liability and Workers’ Compensation for premiums of $33,229, $43,491 and $99,762, respectively; and
McGriff, Seibels & Williams, Inc. for Port Liability - $175,000, Umbrella -
$123,500, Public Officials (included in Port Liability). PA20241017DOC007
RATIFY & AFFIRM EMERGENCY SERVICES FOR ANALYSIS OF BERTH 6
Ratified and affirmed the Executive Director’s approval of PSA 24-04 in the amount
of $83,966 for emergency analysis of Berth 6 PA20241017DOC008
BERTH 6 CONCRETE REPAIR CHANGE ORDER NO. 2
Approved and authorized the Chairman to execute Change Order No. 2 increasing the contract between the Manatee County Port Authority and BDI Marine Contractors, LLC in the amount of $536,017 for ultra-high-performance concrete and repair of bollards due to extensive corrosion, subject to the review and approval of FDOT PA20241017DOC009
PURCHASE OF EVAPORATORS
Approved the issuance of a purchase order to Dade Service Corporation in the amount of $547,700.50 for the purchase of 30 evaporators for warehouse 8 PA20241017DOC010
SUPERIOR ASPHALT PAVING AWARD APPROVAL
Approved and authorized the Chairman to execute to execute the Piggybacking Agreement for Paving Project between Manatee County Port Authority and Superior Asphalt, Inc., in the amount of $510,820 for paving certain areas on the Port
PA20241017DOC011
BUDGET RESOLUTION
Adopted Budget Resolution PA-24-24 PA20241017DOC012
NOTICE OF PORT AUTHORITY MEETINGS SCHEDULE
Adopted Resolution PA-25-03 and instruct the Executive Director of the Port Authority to cause of a copy of said resolution to be published in the Bradenton Herald, in accordance with the requirements of Section 189.015, of the Florida Statutes
PA20241017DOC013
SEAPORT MANATEEE AND WORLD DIRECT SHIPPING, LLC LEASE
Approved and authorized the Chairman to execute the SeaPort Manatee and World Direct Shipping, LLC Lease between World Direct Shipping LLC and Manatee County Port Authority PA20241017DOC014
OTHER CRANES OPERATING AGREEMENT
Ratified and affirmed approved the Executive Director’s execution of the SeaPort Manatee Other Cranes Operating Agreement between the Manatee County Port Authority and Logistec USA Inc. PA20241017DOC015
(End Consent Agenda)
5. AGREEMENT FOR PURCHASE AND SALE OF REAL PROPERTY
Carlos Buqueras, Executive Director, provided a brief explanation of the agreement, pros and cons, and the expansion of the Port is related to growth.
Discussion ensued regarding the revenue with this investment each year, the ability to terminate the lease, purchasing and leasing the land, and overall improvements.
October 17, 2024 (Continued)
William Clague, Attorney representing Fortress 2020 Landco LLC, addressed the concern of the lease, the agreement is written as cause and default, and is not finalized, this is just the beginning of the agreement, and stated that conversations can take place prior to closing.
A motion was made by Member Turner, seconded by Member Bearden, and carried 6 to 0, to adopt Resolution PA-25-02 Resolution of the Manatee County Port Authority Regarding the Acquisition of Real Property PA20241017DOC017
4. 2025 LEGISLATIVE PRIORITIES
Dan Fitzpatrick, Director of Planning and Projects, Sea Port Manatee, reviewed the Federal priorities for 2025, advance reimbursement funding, dredging and material offloading, and statewide issues.
Dave Rambra, Sea Port Manatee, reviewed the State priorities for 2025, land acquisition, and investment in statewide priority projects.
Discussion ensued regarding grants for the Port, and the expansion of the Port.
A motion was made by Member Ballard, seconded by Kruse, and carried 6 to 0, to approve the Manatee County Port Authority Legislative Priorities – Fiscal Year 2025. PA20241017DOC016
EXECUTIVE DIRECTOR EVALUATION DISCUSSION
Noah Daiker, Bryant Miller Olive Law Firm, provided a summary of the short-term annual evaluation to Authority members for the evaluation of Mr. Buqueras. Mr. Buqueras was evaluated in the following eight categories of performance:
Business Development
Relationship with the Port Authority
Financial Management and Regulatory Compliance
Public Image and Community Relations
Strategic Planning and Goals
Leadership
Job and Industry Knowledge
Judgement and Decision Making
There were no rankings that need improvements, and Mr. Buqueras was rated outstanding by the majority of Members in all categories.
Discussion ensued regarding thanking Mr. Buqueras for all he does for the Port, his leadership, and requested more aggression in terms of growing the Port.
There being no public comments, Chairman Van Ostenbridge closed public comments.
PA20241017DOC018
EXECUTIVE DIRECTOR COMMENTS
Carlos Buqueras, Executive Director, thanked Authority Members for their comments and positive evaluation. His evaluation represents the result of team work and performance by Port staff, provided an update on the Strike taking place at the Port, damage to the Port from Hurricane Milton, fuel distribution resumed within 72 hours, photos of the fuel terminal, Warehouse one, Cruise terminal, Warehouse seven, International Center, Warehouse nine, AMT a-frame, Berth Rehab and Dredging, the estimate in repairs is $227.2 million, and Governor Ron DeSantis granted Sea Port Manatee $9.5 million for hurricane relief.
PA20241017DOC019
AUTHORITY MEMBER COMMENTS
There were no Member comments.
October 17, 2024 (Continued)
ADJOURN
There being no further business, Chairman Van Ostenbridge adjourned the meeting at 9:59 a.m.
Minutes Approved:
November 19, 2024
CONSENT
AGENDA ITEM 3.C.: 2025 HOLIDAY & PAY DATE SCHEDULE
BACKGROUND:
Each year the Port Authority approves a schedule of Port Authority holidays and pay dates for Port employees for the following year.
ATTACHMENT:
Manatee County Port Authority 2025 Holiday & Pay Date Schedule.
COST AND FUNDING SOURCE:
N/A.
CONSEQUENCES IF DEFERRED:
N/A
LEGAL COUNSEL REVIEW: N/A
RECOMMENDATION:
Move to approve the schedule of holidays and pay dates for the Manatee County Port Authority for calendar year 2025.
January | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 | |
February | ||||||
S | M | T | W | T | F | S |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | |
March | ||||||
S | M | T | W | T | F | S |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 |
April | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 |
May | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
June | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | |||||
July | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | ||
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 |
August | ||||||
S | M | T | W | T | F | S |
1 | 2 | |||||
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |
31 |
September | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | ||||
October | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 | |
November | ||||||
S | M | T | W | T | F | S |
1 | ||||||
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 |
December | ||||||
S | M | T | W | T | F | S |
1 | 2 | 3 | 4 | 5 | 6 | |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 | |||
January 1 - New Year’s Day Observed | May 26– Memorial Day | November 27 – Thanksgiving Day |
January 20 - Martin Luther King, Jr. Day | July 4 - Independence Day | November 28 – Thanksgiving Friday |
February 17 – President’s Day | September 1 – Labor Day | December 24 - Christmas Eve |
April 18– Good Friday | November 11 – Veteran’s Day | December 25 – Christmas Day |
THREE (3) PERSONAL HOLIDAYS: To be used on or before December 12, 2025 (Advance approval by management required)
HOLIDAY PAYDATE
November 19, 2024
CONSENT
AGENDA ITEM 3.D: BERTH 6 CONCRETE REPAIR CHANGE ORDER NO. 3 BACKGROUND:
On April 23, 2024, the Authority approved the contract with BDI Marine Contractors, LLC for Berth 6 Concrete Repair in the amount of $2,075,000.00. Change Order No. 1 was approved in the amount of $266,440 due to the discovery of higher-strength concrete and an increase in the number of curb repairs required. Change Order No. 2 was approved in the amount of $536,017 changing the contract scope from conventional concrete to ultra- high-performance concrete. Additional work on the bollards due to extensive corrosion was also included. The original contract price included sales tax for the purchase of construction materials. Change Order No. 3 allows the Port Authority to take advantage of provisions of Section 212.08(6), Florida Statutes and Rule 12-A-1.094, Florida Administrative Code, to pay for materials directly thus allowing sales tax cost savings. BDI’s contract is decreased $820,569 and CorTuf UHPC is entered for $769,700, resulting in savings of $50,869. In addition, Change Order No. 3 requests reinforcement in areas B and C to install welded wire mesh and extension of the ultra-high-performance concrete to transition to existing asphalt in the amount of $66,481. BDI’s new contract total is
$2,070,713.
ATTACHMENT:
Change Order No. 3
COST AND FUNDING SOURCE:
Net increase of FDOT grant funding of $11,709 and Port cash increase of $3,903
CONSEQUENCES IF DEFERRED:
Delay in approval of Change Order No. 3
LEGAL COUNSEL REVIEW: Yes RECOMMENDATION:
Move to approve and authorize the Chairman to execute Change Order No. 3 to the contract between the Manatee County Port Authority and BDI Marine Contractors, LLC for berth 6 concrete repairs adding wire mesh and concrete extension and to provide sales tax savings for direct purchase of construction materials.
Approve the issuance of a purchase order to CorTuf UHPC in the amount of $769,700 for the direct purchase of ultra high-performance concrete.
Project Name:
PORT MANATEE
Berth 6 Surface Concrete Repair
CHANGE ORDER FORM
Date of Issuance: 11/6/2024
Change Order No. Purchase Order No.
Effective Date:
3
PA006026
11/7/2024
Owner: Manatee County Port Authority Engineer of Record:
Contractor: BDI Marine Contractors, LLC
11718 SE Federal Hwy #22
Sound FL 33455
Contract#: ITB-.-0-2024/RH
Contractors Project#: Engineer's Project#: Contract Name: Berth 6 Surface Concrete Repair
Project: Berth 6 Surface Concrete Repair
The Contract is modified as follows upon execution of this Change Order
Description: Port Manatee to Direct Purchase Ultra High Performance Concrete <-$820,569.00> Add WWM $29,751.00 , Add UHPC to formed edge I Asphalt $36,730.00
Attachments: discription List documents supporting change: -Ex-hibi-t's -A, B-------
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TERMS
Original Contract Price: [note changes in Milestones if applicable]
Original Contract Times: 6/10/2024
$ 2,075,000.00 Substantial Completion: 12/7/2024 Date of Final Payment 1/6/2025
[Increase] [Decrease] from previous approved [Increase] [Decrease] from previous approved
Change Orders#: 1 Change Order#: 1,2
Hours Requested: N/A Substantial Completion Date: Increase 30 days
$ (754,088.00) Date of Final Payment: Increase 30 days
[date or days] Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial Completion: 12/7/2024
$ 2,877,457.00 Date of Final Payment: 1/6/2024
[date or days]
[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial Completion: 12/12/2024
$ (754,088.00) Date of Final Payment: 1/11/2025
[days or dates]
Contract Price Incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial Completion: 1/6/2025
$ 2,070,713.00 Date of Final Payment: 2/5/2025
[date or days]
RECOMMENDED: ACCEPTED: ;?-d-�f;::T
RS&H, Inc.
BDI Marine Contractors, LLC
Engineer of Record MCPA / BCC APROVED /;o, t ctor
Date: Date: Date: II £ � 2111,.
By:
Approved by Funding Agecy {if applicable) '/ I /
Title:
<Rev. 11/2020>
BDI Marine Contractors LLC DATE: 11/6/2024 Exhibit B BDI BID NUMBER: PROJECT NAME: Berth 6 | ||||||
Berth 6 CO 3 Modification Worksheet | ||||||
OVERHEAD #REFI PROFIT $ - | ||||||
ITEM | cc | DESCRIPTION | Base Rate | QUANT | UOM | TOTAL |
1 | Welded Wire Mesh Areas Band C (8000) Sqf | |||||
Labor | $ 19,751.00 | 1 | LS | $ 19,751.00 | ||
Materials | $ 10,000.00 | 1 | LS | $ 10,000.00 | ||
Total | $ 29,751.00 | |||||
Time To Contract | 2.5 | DAYS | ||||
2 | Additional CorTuff Forming and Paving on Edge | |||||
Paving | 12300 | 1 | LS | $ 12,330.00 | ||
CorTuff | 3600 | 4 | $ 14,400.00 | |||
Labor and Forming | 5000 | 2 | DAY | $ 10,000.00 | ||
Total | $ 36,730.00 | |||||
Time To Contract | 2.5 | DAYS | ||||
SUMMARY | ||||||
ADDITIONAL DAYS TO CONTRACT | 5 | |||||
TOTAL | $ 66,481.00 |
-CONT CTO S
Seaport Manatee Berth 6 Description of Change Order #3
This change order is for the Seaport Manatee direct purchase of Ultra High-Performance Concrete from COR-TUFUHPC. The port will pay the vendor directly to negate the sales tax of 7% for Manatee County.
The tax amount is listed on the attachment hereby labeled "Exhibit A" to Change Order #3 Dated 10/21/2024.
The amount of this Change Order #3 is (-$820,569.00)
A deduction of (Eight hundred twenty thousand five hundred sixty nine dollars)
-
Andrew Keenan
BDI Project Manager
the future of concrete
•Price ls only valid for 30 days from date on Proposal•
11128 Industrial Road• Manassas, VA 20109
Phone: 703.656.1445 www.Cor-Tuf.com FAX: 703.361.6169
DATE: 10/15/2024
PROJECT: Berth 6 Port Manatee PROJECT ADDRESS: Berth 6 Port Manatee
BID TO: Manatee County Port Authority BUSINESS ADDRESS: 300 S Dock St Palmetto FL 34221
PHONE#: 941-722-6621
CONTACT: George Isiminger
B10#: 1
ESTIMATOR: OJ Burgess
F: C:
BID# -----------
TOTAL BASE BID AMOUNT:! $728,700.00 I Add Alts.:! $41,000.00 I
NOTE: PLEASE READ THESE THREE DOCUMENTS CAREFULLY.
Cor-Tuf UHPC, proposes to fumlsh materials to complete the follo'Mng job based on sheets xx to xx. This proposal Is based upon drav.fogs dated YY.
_ _Civil Enqlneer:
Total Bid:! $823,579.00
Total Bid without Tax: $769,700.00
c::: ·_ DESCRIPTIO Total i
Ready Mixing at $400.00 per cubic yard
Pricing Is for approximately: 250 Cubic Yards 6750 cubic feet and includes Cor-Tuf CT25 UHPC, steel fiber and admixture. Cement and DOT approved sand by other. Mixing by others.
1 CY super sack
250.00 | Cor-Tuf UHPC | $1,275.00 | each | $ | 318,750.00 | |
1,500.0 | Steel fiber | bags | $120.00 | each | $ | 180,000.00 |
2,250.00 | Admix | $14.40 | gallon(s) | $ | 32,400.00 | |
1,700.00 | Admix2 | $14.40 | gallon(s) | $ | 24.480.00 | |
1,400.00 | Admlx3 | $13.80 | gallon(s) | $ | 19,320.00 | |
250.00 | Ready Mix Cement | $157.00 | bag(s) | $ | 39,250.00 | |
250.00 | Ready Mix Sand | $50.00 | bag(s) | $ | 12,500.00 | |
250.00 | Mixing and Delivery | $400.00 | yard | $ | 100,000.00 |
Total Material
This orice does not include Car-Tur Techs, see below for oer dav and ner Tech fees.
0To determine estimated costs for Technicians, Lodging and Meals, and Mega Mixer Rental fees, please use the calculator to the right of the line Item
$726,700.00
# of davs | # of techs | estimated total cost | |||||
Cor-TufTechnlcian (on-site days) | S500.00 per day | Teo·· | I | 11 | 4 | $2 000.00 | |
Travel Days | S750.00 per day | TBD"" | I | ol | 0 | $0.00 | |
Lodging and Meals | S250.00 per day | TBD" | I | 01 | 0 | $0.00 |
Estimated Shipping cost of Materials $6,250.00 per tanker load X 6 loads S3500.00 per van load X1 load
# of days # of mixers
$41,000.00
estimated total cost
Mega Mixer Rental to be attached to your skid steer or rental
S1,200.00 per day TBD" I 01
$0.00
Total Estimated Cost Including Technicians, Lodging and Meals, and Mega Mixer Rental fees $2,000.00
50% Deposit Due ror materials (6) weeks prior to material shipping date 30 day notice Is required to schedule start of project.
Materials Pricing FOB: Happy Valley Blending 660 Axeman Road, Pleasant Gap PA 16823
•AIJTesting must be conducted by ASTM 1856 certified lab•
Wo less then 12 cylinders will be taken, No less then 3 will be tested per testing day•
Engineering Consultation or design work \\ill be billed seperately based on at a to be determined rate
ADD ALTERNATES: I
r Engineering Consultation and design I
TOTAL BID:
-
- -
$728,700.00
Add Alternates:
Sales Tax:
GRAND TOTAL BID:
(Revfev.ed.Approyoo and Acceoled Bl: D"" Cor-TufUHPC: Dalee
$41,000.00
,8;10.00
$823,579.00
,1.00 �k
M1natu County Port Authority Is Tu Eumpl Ho Tn is lnck.ldad In lhis Pri«
Inwitness where or, the parties hereto have executed this agreement.
In Prescence or:
Approved by: App,ovedby.
Manatee County Port Authority | Cor-TufUHPC | ||
Tilec | Cale: | Tilec | Cale: |
R A and Bl: 0¥ Cor-TufUHPC: Du
BDI MARINE AND SITE CONTRACTORS
11718 SE Federal Hwy, Suite 222
Hobe Sound , FL 33455
(561) 909-9898
Estimate #
1873
Date
11/1/2024
Port Manatee FL
Item Description Unit of Measure
Qty Price Amount
Under Berth Repair Work | Repair Damaged Hollow Core Panels on the underside of Berth 6. Remove abandoned utilities and patch holes. Includes 70 Cubic Feet per the provided report of under-deck concrete repair. Any repairs beyond the 70 CF will be repaired at a Unit price of $3650.00 Requesting 30 days added to contract |
Reinforcement Areas B and C | |
Install 6 gauge welded wire mesh from crane rail pocket to crane rail pocket 1" off existing surface prior to UHPC pour. Requesting 2 days added to contract. | |
Shut Down Per Coast Guard | BDI and their subcontractor, Aggregate Technology, were directed to cease work on the Berth for 5 days 5 days requested to be added to contract. |
Hatch Replacement | Remove and replace (1) 42"x30" Frame and cover over the utility trench on the Eastern side of the Berth. Remove and replace (1) 40"x26" frame and cover on the middle of the Berth. Replace (1) Hatch cover on western side of berth. Requesting 5 days added to contract. |
Storm Cleanup | Clean up Debris and Phosphorus that was displace by Hurricane Milton. Requesting 20 days for storm shutdowns |
Topper Extension | Per RFI 21, the extension of the UHPC to a |
3E Plus | Per the request of RS&H BDI switched cathodic protection engineers from 3E Plus to Vector |
Laticrete | Per RS&H, topper material what changed from Laticrete Emorytop to Cor Tuff UHPC. BDI had a PO for this material. |
LS 1.00 $355,000.00 $355,000.00
Items 1.00 $29,751.00 $29,751.00
Items 1.00 $87,024.15 $87,024.15
$35,000.00 | $35,000.00 |
$10,000.00 | $10,000.00 |
$36,730.00 | $36,730.00 |
$8,905.00 $130,320.00 | $8,905.00 $130,320.00 |
Items 1.00
Items 1.00
1.00
tems
formed edge with a .75" chamfered edge. | |
Transition from UHPC to existing asphalt | |
with 3' wide x 420' long asphalt patch. | |
Requestion 4 days added to contract. |
I
Items 1.00
Items 1.00
E S T I M A T E
Sub Total
$692,730.15
Total
$692,730.15
BDI Marine and Site Contractors is a Florida state certified general contractor License CGC1528016 2,000,000 Marine General Liability, 1,000,000 Workers Compensation USL&H Coverage
T E R M S A N D C O N D I T I O N S
This is a non-binding bid.
Additional cost for labor and/or materials beyond scope of work above will be invoiced at cost plus a percentage of overhead and profit agreed by both parties of BDI and owner.
BDI does not assume any responsibility for materials prior to unloading or installing at job site Any delays not caused by fault of BDI may result in an additional mobilization cost upon continuation of work or additional daily/weekly cost as pro-rated based on this contact total price
Excluded:
Permits, Engineering, & Electric Work Surveys, monuments, baselines or elevations Vibration monitoring
Utility locations other than 811
Utility relocation or damages/repairs to utilities not located via 811 Import/export of fill or other material not part of scope
Added costs for unknown site conditions including but not limited to sub-surface obstructions, voids or other that increases quoted material/labor quantities Additional quantities of permanent materials other than specified on plans or scope of work
Additional cost for operations above and beyond what is required by the specified plans or scope of work Final As-built survey
Protection and/or shoring of adjacent structures in any way
Relocation, protection or other of existing vegetation, mangroves or other permitted/protected vegetation or seagrass Repairs for disturbances to existing site conditions
Landscaping and Sod not included Proposal is only good for 10 days.